X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224262005020

Well Details

Well ID: 0224262005020
Loading map...
Location: 02/05-20-022-26W4/0
Location Alias: 02/05-20-22-26 W4M
Location Alias 2: 02/05-20-022-26 W4/00
Province: Alberta
County/Municipality: Wheatland County
Well Name: EMBER 102 ENTICE 5-20-22-26
Operator Name:
License Number: 0423748
License Date: 2010-09-22
License Status: Issued
Spud Date: 2010-11-24
Final Drill Date: 2010-11-26
Well Total Depth: 1001 m
Surface Hole Latitude: 50.883262
Surface Hole Longitude: -113.580896

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-14 Perforation 573.5 575.5 13
2010-12-14 Perforation 527 529 13
2010-12-20 Fracture 573.5 575.5 0
2010-12-20 Fracture 527 529 0
2011-01-11 Perforation 497.9 498.4 13
2011-01-11 Perforation 499.9 500.9 13
2011-01-11 Perforation 477 477.5 13
2011-01-11 Perforation 483.1 483.6 13
2011-01-11 Perforation 509.2 509.7 13
2011-01-11 Perforation 516.1 518.1 13
2011-01-11 Perforation 506.3 506.8 13
2011-01-11 Perforation 507.6 508.1 13
2011-01-11 Perforation 475.8 476.3 13
2011-01-11 Perforation 340.1 340.6 13
2011-01-11 Perforation 408.3 408.8 13
2011-01-11 Perforation 294.3 294.8 13
2011-01-11 Perforation 330.2 330.7 13
2011-01-11 Perforation 460.3 461.3 13
2011-01-11 Perforation 471 472 13
2011-01-11 Perforation 428.7 429.2 13
2011-01-11 Perforation 458.3 459.3 13
2011-01-11 Perforation 520.9 521.4 13
2011-01-11 Perforation 553 555 13
2011-01-11 Perforation 721.5 723.5 13
2011-01-11 Perforation 257 258 13
2011-01-11 Perforation 495 497 13
2011-01-11 Perforation 832 833.5 13
2011-01-11 Perforation 867.5 869 13
2011-01-11 Perforation 738.5 739.5 13
2011-01-11 Perforation 803 804.5 13
2011-01-11 Perforation 209 211 13
2011-01-11 Perforation 590.5 591 13
2011-01-11 Perforation 603.2 604.7 13
2011-01-11 Perforation 570 570.5 13
2011-01-11 Perforation 576.3 576.8 13
2011-01-11 Perforation 179 180 13
2011-01-11 Perforation 784.7 785.2 13
2011-01-11 Perforation 780.4 780.9 13
2011-01-15 Fracture 294.3 785.2 0
2011-01-15 Fracture 209 869 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 4 0.1 0.0 0.0

For data sources see[4]

References