X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444200905020

Well Details

Well ID: 0444200905020
Location: 02/05-09-044-20W4/0
Location Alias: 02/05-09-44-20 W4M
Location Alias 2: 02/05-09-044-20 W4/00
Province: Alberta
County/Municipality: Camrose County
Well Name: SHACKLETON 102 HZ FERIN 5-9-44-20
Operator Name: Shackleton Exploration Ltd.
License Number: 0487891
License Date: 2018-01-30
License Status: Issued
Spud Date: 2018-10-02
Final Drill Date: 2018-10-07
Well Total Depth: 2608 m
Surface Hole Latitude: 52.776685
Surface Hole Longitude: -112.83498

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
02 Oct 2018 Precision Drilling Corporation 190 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-10-04 974
2018-10-05 1310 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-10-30 Multi-Stage Fracture 2592 2592.1 0
2018-10-30 Multi-Stage Fracture 2544.8 2544.9 0
2018-10-30 Multi-Stage Fracture 2498.7 2498.8 0
2018-10-30 Multi-Stage Fracture 2463.8 2463.9 0
2018-10-30 Multi-Stage Fracture 2428.7 2428.8 0
2018-10-30 Multi-Stage Fracture 2394 2394.1 0
2018-10-30 Multi-Stage Fracture 2359 2359.1 0
2018-10-30 Multi-Stage Fracture 2324.1 2324.2 0
2018-10-30 Multi-Stage Fracture 2288.8 2288.9 0
2018-10-30 Multi-Stage Fracture 2254.2 2254.3 0
2018-10-30 Multi-Stage Fracture 2219 2219.1 0
2018-10-30 Multi-Stage Fracture 2183.9 2184 0
2018-10-30 Multi-Stage Fracture 2149 2149.1 0
2018-10-30 Multi-Stage Fracture 2113.6 2113.7 0
2018-10-30 Multi-Stage Fracture 2078.9 2079 0
2018-10-31 Multi-Stage Fracture 2044.2 2044.3 0
2018-10-31 Multi-Stage Fracture 2009 2009.1 0
2018-10-31 Multi-Stage Fracture 1974.3 1974.4 0
2018-10-31 Multi-Stage Fracture 1940.2 1940.3 0
2018-10-31 Multi-Stage Fracture 1893.8 1893.9 0
2018-10-31 Multi-Stage Fracture 1846.7 1846.8 0
2018-10-31 Multi-Stage Fracture 1799.4 1799.5 0
2018-10-31 Multi-Stage Fracture 1752.7 1752.8 0
2018-10-31 Multi-Stage Fracture 1705.7 1705.8 0
2018-10-31 Multi-Stage Fracture 1659.2 1659.3 0
2018-10-31 Multi-Stage Fracture 1612.6 1612.7 0
2018-10-31 Multi-Stage Fracture 1566.2 1566.3 0
2018-10-31 Multi-Stage Fracture 1520.1 1520.2 0
2018-10-31 Multi-Stage Fracture 1474.3 1474.4 0
2018-10-31 Multi-Stage Fracture 1428.2 1428.3 0
2018-10-31 Multi-Stage Fracture 1393.2 1393.3 0
2018-10-31 Multi-Stage Fracture 1357.6 1357.7 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
10/30/2018 10/31/2018 Methyl Alcohol 67-56-1 Scale Inhibitor 0.0113 Step Energy Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
10/22/2018 10/23/2018 0:00 Surface Water - Lake 1610

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1260 248.5 0.0 912.7
2019 2034 177.0 0.0 1354.4

For data sources see[8]

References