If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444200905020 | |
Location: 02/05-09-044-20W4/0 | |
Location Alias: 02/05-09-44-20 W4M | |
Location Alias 2: 02/05-09-044-20 W4/00 | |
Province: Alberta | |
County/Municipality: Camrose County | |
Well Name: SHACKLETON 102 HZ FERIN 5-9-44-20 | |
Operator Name: Shackleton Exploration Ltd. | |
License Number: 0487891 | |
License Date: 2018-01-30 | |
License Status: Issued | |
Spud Date: 2018-10-02 | |
Final Drill Date: 2018-10-07 | |
Well Total Depth: 2608 m | |
Surface Hole Latitude: 52.776685 | |
Surface Hole Longitude: -112.83498 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
02 Oct 2018 | Precision Drilling Corporation | 190 | N/A | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-10-04 | 974 | |
2018-10-05 | 1310 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-10-30 | Multi-Stage Fracture | 2592 | 2592.1 | 0 |
2018-10-30 | Multi-Stage Fracture | 2544.8 | 2544.9 | 0 |
2018-10-30 | Multi-Stage Fracture | 2498.7 | 2498.8 | 0 |
2018-10-30 | Multi-Stage Fracture | 2463.8 | 2463.9 | 0 |
2018-10-30 | Multi-Stage Fracture | 2428.7 | 2428.8 | 0 |
2018-10-30 | Multi-Stage Fracture | 2394 | 2394.1 | 0 |
2018-10-30 | Multi-Stage Fracture | 2359 | 2359.1 | 0 |
2018-10-30 | Multi-Stage Fracture | 2324.1 | 2324.2 | 0 |
2018-10-30 | Multi-Stage Fracture | 2288.8 | 2288.9 | 0 |
2018-10-30 | Multi-Stage Fracture | 2254.2 | 2254.3 | 0 |
2018-10-30 | Multi-Stage Fracture | 2219 | 2219.1 | 0 |
2018-10-30 | Multi-Stage Fracture | 2183.9 | 2184 | 0 |
2018-10-30 | Multi-Stage Fracture | 2149 | 2149.1 | 0 |
2018-10-30 | Multi-Stage Fracture | 2113.6 | 2113.7 | 0 |
2018-10-30 | Multi-Stage Fracture | 2078.9 | 2079 | 0 |
2018-10-31 | Multi-Stage Fracture | 2044.2 | 2044.3 | 0 |
2018-10-31 | Multi-Stage Fracture | 2009 | 2009.1 | 0 |
2018-10-31 | Multi-Stage Fracture | 1974.3 | 1974.4 | 0 |
2018-10-31 | Multi-Stage Fracture | 1940.2 | 1940.3 | 0 |
2018-10-31 | Multi-Stage Fracture | 1893.8 | 1893.9 | 0 |
2018-10-31 | Multi-Stage Fracture | 1846.7 | 1846.8 | 0 |
2018-10-31 | Multi-Stage Fracture | 1799.4 | 1799.5 | 0 |
2018-10-31 | Multi-Stage Fracture | 1752.7 | 1752.8 | 0 |
2018-10-31 | Multi-Stage Fracture | 1705.7 | 1705.8 | 0 |
2018-10-31 | Multi-Stage Fracture | 1659.2 | 1659.3 | 0 |
2018-10-31 | Multi-Stage Fracture | 1612.6 | 1612.7 | 0 |
2018-10-31 | Multi-Stage Fracture | 1566.2 | 1566.3 | 0 |
2018-10-31 | Multi-Stage Fracture | 1520.1 | 1520.2 | 0 |
2018-10-31 | Multi-Stage Fracture | 1474.3 | 1474.4 | 0 |
2018-10-31 | Multi-Stage Fracture | 1428.2 | 1428.3 | 0 |
2018-10-31 | Multi-Stage Fracture | 1393.2 | 1393.3 | 0 |
2018-10-31 | Multi-Stage Fracture | 1357.6 | 1357.7 | 0 |
For data sources see[5]
Start Date | End Date | Chemical Name | CAS Number | Purpose | Job Percentage | Supplier |
---|---|---|---|---|---|---|
10/30/2018 | 10/31/2018 | Methyl Alcohol | 67-56-1 | Scale Inhibitor | 0.0113 | Step Energy Services |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
10/22/2018 | 10/23/2018 0:00 | Surface Water - Lake | 1610 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 1260 | 248.5 | 0.0 | 912.7 |
2019 | 2034 | 177.0 | 0.0 | 1354.4 |
For data sources see[8]