X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444202213000

Well Details

Well ID: 0444202213000
Loading map...
Location: 00/13-22-044-20W4/0
Location Alias: 00/13-22-44-20 W4M
Location Alias 2: 00/13-22-044-20 W4/00
Province: Alberta
County/Municipality: Camrose County
Well Name: SHACKLETON HZ EDBERG 13-22-44-20
Operator Name: Shackleton Exploration Ltd.
License Number: 0470618
License Date: 2014-10-14
License Status: Issued
Spud Date: 2014-11-13
Final Drill Date: 2014-11-22
Well Total Depth: 2511 m
Surface Hole Latitude: 52.799824
Surface Hole Longitude: -112.834954

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
13 Nov 2014 Precision Drilling Corporation 116 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-11-16 916
2014-11-17 1305 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-11-24 Open Hole/Barefoot Completion 2506 2511 0
2014-12-04 Multi-Stage Fracture 2483.2 2483.3 0
2014-12-04 Multi-Stage Fracture 2421 2421.1 0
2014-12-04 Multi-Stage Fracture 2347.8 2347.9 0
2014-12-04 Multi-Stage Fracture 2274.7 2274.8 0
2014-12-04 Multi-Stage Fracture 2174.4 2174.5 0
2014-12-05 Multi-Stage Fracture 2060.3 2060.4 0
2014-12-05 Multi-Stage Fracture 1946.2 1946.3 0
2014-12-05 Multi-Stage Fracture 1886.8 1886.9 0
2014-12-05 Multi-Stage Fracture 1813.7 1813.8 0
2014-12-05 Multi-Stage Fracture 1754.2 1754.3 0
2014-12-05 Multi-Stage Fracture 1695 1695.1 0
2014-12-05 Multi-Stage Fracture 1622.1 1622.2 0
2014-12-05 Multi-Stage Fracture 1562.6 1562.7 0
2014-12-05 Multi-Stage Fracture 1489.6 1489.7 0
2014-12-05 Multi-Stage Fracture 1430.4 1430.5 0
2014-12-05 Multi-Stage Fracture 1371.1 1371.2 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
12/04/2014 12/05/2014 Sodium persulphate 7775-27-1 Breaker 0.0176 Baker Hughes
Crystalline Silica (Quartz) 14808-60-7 37.8127 Baker Hughes
Sodium persulphate 7775-27-1 Breaker 0.0176 Baker Hughes
Non-hazardous Not Available Clay Control 0.0904 Baker Hughes
Tributyl phosphate 126-73-8 Defoamer 0.023 Baker Hughes
Nitrogen 7727-37-9 Energizing Fluid 18.5242 Baker Hughes
Non-hazardous 9014 Friction Reducer 0.1834 Baker Hughes
Oxyalkylated alcohol 9014 Friction Reducer 0.1834 Baker Hughes
Petroleum distillates 64742-47-8 Friction Reducer 0.1834 Baker Hughes
Polyacrylate 9014 Friction Reducer 0.1834 Baker Hughes
1-Butoxy-2-propanol 5131-66-8 Surfactant 0.1271 Baker Hughes
Diethanolamine 111-42-2 Surfactant 0.1272 Baker Hughes
Ethanol 64-17-5 Surfactant 0.1271 Baker Hughes
Methanol 67-56-1 Surfactant 0.1271 Baker Hughes
Polyoxyalkylene sulfate 68891-29-2 Surfactant 0.1271 Baker Hughes

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
12/2/2014 12/2/2014 0:00 Municipal Water 345

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 3721 5429.4 0.0 3588.8
2017 4865 2718.5 0.0 3097.2
2019 1423 897.8 0.0 956.9

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-25 No Incident N/A N/A
2014-12-09 No Incident N/A N/A

For data sources see[9]

References