X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534260202002

Well Details

Well ID: 0534260202002
Loading map...
Location: 00/02-02-053-26W4/2
Location Alias: 00/02-02-53-26 W4M
Location Alias 2: 00/02-02-053-26 W4/02
Province: Alberta
County/Municipality: Parkland County
Well Name: CEDAR CREEK ACH 2-2-53-26
Operator Name:
License Number: 0019733
License Date: 1960-09-21
License Status: Issued
Spud Date: 1960-10-16
Final Drill Date: 1960-11-13
Well Total Depth: 1953.8 m
Surface Hole Latitude: 53.542818
Surface Hole Longitude: -113.723745

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
1960-10-16 1340 Conversion

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-11-17 Perforation 1554.8 1557.8 13
1960-11-17 Acid Treatment 1554.8 1557.8 0
1962-09-11 Cement Squeeze 1554.8 1557.8 0
1962-09-12 Perforation 1250.3 1250.9 13
1962-09-13 Cement Squeeze 1250.3 1250.9 0
1962-09-16 Perforation 1222.9 1224.1 13
1962-09-16 Perforation 1225.9 1231.4 13
2006-10-31 Fracture 1225.9 1231.4 0
2006-10-31 Fracture 1222.8 1224.1 0
2008-10-02 Cement Squeeze 1222.8 1231.4 0
2008-10-06 Packing Device Capped w/Cement 1507 1515 0
2008-10-06 Perforation 1312 1314 17
2008-10-06 Perforation 1315 1319 17
2008-10-06 Perforation 1320 1323 17
2008-10-07 Acid Treatment 1312 1323 0
2008-10-20 Acid Treatment 1312 1323 0
2009-02-07 Acid Treatment 1312 1323 0
2009-06-20 Hydra Jet Perforation 1303.9 1307.3 3
2009-06-22 Acid Treatment 1303.9 1307.3 0
2009-09-20 Packing Dev Cpd w/Res-Gyp Cem 1308 1311 0
2009-09-20 Packing Device Capped w/Cement 1292 1300 0
2009-09-20 Packing Device Capped w/Cement 1212 1220 0
2009-09-21 Perforation 1167.5 1169.5 20
2009-09-22 Fracture 1167.5 1169.5 0
2013-08-23 Cement Squeeze 1167.5 1169.5 0
2013-08-30 Perforation 1234.4 1234.5 1
2013-08-31 Perforation 1231.1 1234.1 3
2013-09-01 Perforation 1230.8 1230.9 1
2013-09-01 Perforation 1234.3 1234.4 1
2014-09-12 Acid Treatment 1230.8 1234.5 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 822 6.8 0.0 130.6
2009 3428 16.9 0.0 218.7

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1960-11-12 Lost Circulation 1533.40 1563.90
1960-11-12 Lost Circulation 1587.40 1587.40
2013-09-03 No Incident N/A N/A
2014-09-12 No Incident N/A N/A

For data sources see[6]

References