X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534261102002

Well Details

Well ID: 0534261102002
Loading map...
Location: 00/02-11-053-26W4/2
Location Alias: 00/02-11-53-26 W4M
Location Alias 2: 00/02-11-053-26 W4/02
Province: Alberta
County/Municipality: Parkland County
Well Name: CEDAR CREEK STAL-BLK 2-11-53-26
Operator Name: Cedar Creek Energy Ltd.
License Number: 0003639
License Date: 1951-10-18
License Status: Issued
Spud Date: 1951-10-18
Final Drill Date: 1951-11-24
Well Total Depth: 1585 m
Surface Hole Latitude: 53.557545
Surface Hole Longitude: -113.723613

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-11-24 Open Hole/Barefoot Completion 1485.3 1545.9 0
1982-09-02 Cement Plug 1522.9 1545.9 0
1982-09-02 Open Hole/Barefoot Completion 1485.3 1522.9 0
1986-10-22 Acid Treatment 1485.3 1522.9 0
1987-07-02 Open Hole/Barefoot Completion 1485.3 1545.9 0
1987-07-04 Acid Treatment 1485.3 1545.9 0
1989-07-22 Acid Wash 1485.3 1545.9 0
1990-11-23 Open Hole/Barefoot Completion 1485.3 1585 0
1990-11-24 Cement Squeeze 1485.3 1585 0
1990-11-27 Perforation 1521.3 1522 20
1990-11-27 Perforation 1522.8 1523.5 20
1990-11-27 Perforation 1524.3 1525 20
1990-11-27 Perforation 1525.8 1526.5 20
1990-11-27 Perforation 1527.3 1528 20
1990-11-27 Perforation 1528.8 1529.5 20
1990-11-27 Perforation 1530.3 1531 20
1990-11-27 Acid Treatment 1521.3 1531 0
1991-12-17 Chemical Squeeze 1521.3 1531 0
1992-04-20 Chemical Squeeze 1521.3 1522 0
1992-11-12 Perforation 1532 1532.5 20
1992-11-12 Perforation 1534.2 1534.7 20
1992-11-12 Perforation 1536.4 1536.9 20
1992-11-12 Perforation 1538.6 1539.1 20
1992-11-12 Perforation 1540.8 1541.3 20
1992-11-12 Perforation 1543 1543.5 20
1992-11-12 Acid Treatment 1532 1543.5 0
1993-02-06 Acid Treatment 1532 1532.5 0
1993-09-08 Chemical Squeeze 1532 1543.5 0
1994-07-14 Chemical Squeeze 1532 1543.5 0
2004-01-20 Cement Plug 1506.8 1514.8 0
2004-01-23 Perforation 1390.5 1394.5 13
2004-03-12 Acid Treatment 1390 1394.5 0
2009-05-14 Perforation 1301 1310 20
2009-05-14 Perforation 1314 1320 20
2009-05-14 Perforation 1328 1331 20
2009-05-15 Acid Treatment 1314 1331 0
2009-05-19 Acid Treatment 1301 1310 0
2010-09-14 Perforation 1284 1291 20
2010-09-15 Acid Treatment 1284 1291 0
2013-05-31 Acid Treatment 1284 1291 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 7046 81.9 0.0 6517.7
2005 8331 144.0 0.0 8515.8
2006 7805 40.6 0.0 8390.7
2007 8706 87.3 0.0 8755.0
2008 7564 50.5 0.0 7886.1
2009 3055 18.0 0.0 3697.5

For data sources see[4]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-06-04 No Incident N/A N/A

For data sources see[5]

References