X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445090505000

Well Details

Well ID: 0445090505000
Loading map...
Location: 00/05-05-044-09W5/0
Location Alias: 00/05-05-44-09 W5M
Location Alias 2: 00/05-05-044-09 W5/00
Province: Alberta
County/Municipality: Clearwater County
Well Name: YANGARRA HZ WILLGR 5-5-44-9
Operator Name: TAQA North Ltd.
License Number: 0475772
License Date: 2015-06-12
License Status: Amended
Spud Date: 2015-06-23
Final Drill Date: 2015-07-08
Well Total Depth: 4511 m
Surface Hole Latitude: 52.739735
Surface Hole Longitude: -115.279255

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
23 Jun 2015 Trinidad Drilling Ltd. 53 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-06-28 1828
2015-06-29 2231 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-12-11 Multi-Stage Fracture 4447.3 4449.2 0
2015-12-11 Multi-Stage Fracture 4394.8 4396.7 0
2015-12-11 Multi-Stage Fracture 4342.5 4344.4 0
2015-12-11 Multi-Stage Fracture 4290 4291.9 0
2015-12-11 Multi-Stage Fracture 4224.6 4226.5 0
2015-12-11 Multi-Stage Fracture 4172.1 4174 0
2015-12-12 Multi-Stage Fracture 4119.6 4121.5 0
2015-12-12 Multi-Stage Fracture 4067.1 4069 0
2015-12-12 Multi-Stage Fracture 4014.9 4016.8 0
2015-12-12 Multi-Stage Fracture 3962.4 3964.3 0
2015-12-12 Multi-Stage Fracture 3910 3911.9 0
2015-12-13 Multi-Stage Fracture 3857.5 3859.4 0
2015-12-13 Multi-Stage Fracture 3805 3806.9 0
2015-12-13 Multi-Stage Fracture 3752.7 3754.6 0
2015-12-13 Multi-Stage Fracture 3700.5 3702.4 0
2015-12-13 Multi-Stage Fracture 3649.5 3651.4 0
2015-12-13 Multi-Stage Fracture 3597 3598.9 0
2015-12-13 Multi-Stage Fracture 3544.7 3546.6 0
2015-12-13 Multi-Stage Fracture 3492.4 3494.3 0
2015-12-13 Multi-Stage Fracture 3440.4 3442.3 0
2015-12-13 Multi-Stage Fracture 3388.6 3390.5 0
2015-12-13 Multi-Stage Fracture 3336.5 3338.4 0
2015-12-13 Multi-Stage Fracture 3284.6 3286.5 0
2015-12-13 Multi-Stage Fracture 3232.7 3234.6 0
2015-12-14 Multi-Stage Fracture 3180.9 3182.8 0
2015-12-14 Multi-Stage Fracture 3128.9 3130.8 0
2015-12-14 Multi-Stage Fracture 3089.8 3091.7 0
2015-12-14 Multi-Stage Fracture 3037.6 3039.5 0
2015-12-14 Multi-Stage Fracture 2999.5 3001.4 0
2015-12-14 Multi-Stage Fracture 2947.4 2949.3 0
2015-12-14 Multi-Stage Fracture 2908 2909.9 0
2015-12-14 Multi-Stage Fracture 2856.1 2858 0
2015-12-14 Multi-Stage Fracture 2816.7 2818.6 0
2015-12-14 Multi-Stage Fracture 2764.3 2766.2 0
2015-12-14 Multi-Stage Fracture 2725.1 2727 0
2015-12-14 Multi-Stage Fracture 2685.7 2687.6 0
2015-12-14 Multi-Stage Fracture 2646.3 2648.2 0
2015-12-14 Multi-Stage Fracture 2594.4 2596.3 0
2015-12-14 Multi-Stage Fracture 2555.4 2557.3 0
2015-12-14 Multi-Stage Fracture 2516.1 2518 0
2015-12-14 Multi-Stage Fracture 3465.9 3467.8 0
2015-12-14 Multi-Stage Fracture 2426.8 2428.7 0
2015-12-14 Multi-Stage Fracture 2387.7 2389.6 0
2015-12-15 Multi-Stage Fracture 2335.2 2337.1 0
2015-12-15 Multi-Stage Fracture 2295.6 2297.5 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
12/11/2015 12/15/2015 Methyl Alcohol 67-56-1 Bactericide/Biocide 0.009 Step Energy Services
propylene glycol 57-55-6 Demulsifier 0.0447 Step Energy Services
Crystalline Silica 14808-60-7 0.4145 Step Energy Services
Crystalline Silica 14808-60-7 0.4145 Step Energy Services
2-bromo-2-nitro.3-diol 52-51-7 Bactericide/Biocide 0.009 Step Energy Services
Methyl Alcohol 67-56-1 Bactericide/Biocide 0.009 Step Energy Services
Non-Hazardous Ingredients Not Available Bactericide/Biocide 0.009 Step Energy Services
Persulfate compounds 7727-54-0 Breaker 0.0028 Step Energy Services
Choline chloride 67-48-1 Clay Control 0.1345 Step Energy Services
Non-Hazardous Ingredients Not Available Clay Control 0.1345 Step Energy Services
Glycerine 56-81-5 Demulsifier 0.0447 Step Energy Services
Non-Hazardous Ingredients Not Available Demulsifier 0.0447 Step Energy Services
Propylene Glycol 57-55-6 Demulsifier 0.0447 Step Energy Services
Ammonium Chloride 12125-02-9 Friction Reducer 0.0679 Step Energy Services
Distillates (petroleum) hydrotreated light 64742-47-8 Friction Reducer 0.0679 Step Energy Services
Non-Hazardous Ingredients Not Available Friction Reducer 0.0679 Step Energy Services
12/13/2015 12/14/2015 non-hazardous ingredients Not Available Friction Reducer 0.0175 Step Energy Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
12/6/2015 12/10/2015 0:00 Surface Water - Runoff 5500

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 7983 16525.2 0.0 385.0
2017 8524 17179.7 0.0 235.3
2018 6626 11665.9 0.0 188.5
2019 2148 2930.8 0.0 53.6

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-10 No Incident N/A N/A
2015-12-18 No Incident N/A N/A

For data sources see[9]

References