X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716083008000

Well Details

Well ID: 0716083008000
Loading map...
Location: 00/08-30-071-08W6/0
Location Alias: 00/08-30-71-08 W6M
Location Alias 2: 00/08-30-071-08 W6/00
Province: Alberta
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE WEMBLEY 8-30-71-8
Operator Name:
License Number: 0101079
License Date: 1983-03-24
License Status: RecCertified
Spud Date: 1983-04-02
Final Drill Date: 1983-04-26
Well Total Depth: 2475 m
Surface Hole Latitude: 55.177085
Surface Hole Longitude: -119.208036

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-05-30 Perforation 2372.5 2373.5 7
1983-05-30 Perforation 2335 2336 7
1983-05-31 Remedial Casing Cementing 2335 2336 0
1983-05-31 Remedial Casing Cementing 2372.5 2373.5 0
1983-06-02 Perforation 1689 1690 7
1983-06-02 Perforation 1656 1657 7
1983-06-03 Cement Squeeze 1656 1690 0
1983-06-08 Cement Squeeze 1689 1690 0
1983-06-09 Perforation 1673.3 1675.5 7
1983-06-09 Perforation 1675.8 1679 7
1983-06-11 Fracture 1673.3 1679 0
1983-06-15 Packing Device Capped w/Cement 1641.5 1649 0
1983-06-16 Perforation 1127 1129.5 7
1983-06-21 Cement Squeeze 1127 1129.5 0
1983-06-24 Perforation 1127 1129.5 13
1983-06-30 Perforation 1140 1141 7
1983-06-30 Cement Squeeze 1127 1129.5 0
1983-06-30 Cement Squeeze 1140 1141 0
1983-07-10 Perforation 1124.5 1128 13
1983-07-12 Acid Treatment 1124.5 1128 0
1983-07-14 Perforation 1140 1141 13
1983-07-15 Cement Squeeze 1140 1141 0
1983-07-19 Cement Squeeze 1124.5 1128 0
1983-07-21 Perforation 1125.5 1127.5 7
1983-07-22 Acid Treatment 1125.5 1127.5 0
1983-10-17 Fracture 1125.5 1127.5 0
1987-07-15 Cement Squeeze 1125.5 1127.5 0
1987-07-22 Cement Squeeze 1656 1679 0
1987-08-02 Cement Squeeze 1656 1690 0
1987-08-03 Cement Squeeze 1124.5 1141 0
1987-08-06 Perforation 2345 2347 7
1987-08-06 Perforation 2348 2349.5 7
1987-08-06 Perforation 2351 2354 7
1987-08-06 Perforation 2356 2359 7
1987-08-07 Acid Treatment 2345 2359 0
1991-10-05 Packing Device Capped w/Cement 2322 2330 0
1991-10-05 Packing Device Capped w/Cement 1112 1120 0
1991-10-05 Perforation 498 500 73
1991-10-05 Packing Device Capped w/Cement 482 490 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 1271 18.7 0.0 59.2
1984 8023 78.8 0.0 289.9
1985 8673 40.0 0.0 230.4
1986 5711 29.8 0.0 128.5

For data sources see[4]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-04-21 Kick 2350.00 2350.00

For data sources see[5]

References