X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375082103000

Well Details

Well ID: 0375082103000
Loading map...
Location: 00/03-21-037-08W5/0
Location Alias: 00/03-21-37-08 W5M
Location Alias 2: 00/03-21-037-08 W5/00
Province: Alberta
County/Municipality: Clearwater County
Well Name: YANGARRA HZ FERRIER 3-21-37-8
Operator Name: Yangarra Resources Corp.
License Number: 0486438
License Date: 2017-11-20
License Status: Issued
Spud Date: 2017-11-28
Final Drill Date: 2017-12-12
Well Total Depth: 5014 m
Surface Hole Latitude: 52.212896
Surface Hole Longitude: -115.09245

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
28 Nov 2017 Trinidad Drilling Ltd. 42 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-12-05 1965
2017-12-06 2712 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-19 Multi-Stage Fracture 4966.9 4967 0
2017-12-20 Multi-Stage Fracture 3443.2 4010.5 0
2017-12-21 Multi-Stage Fracture 3420.5 3420.6 0
2017-12-21 Multi-Stage Fracture 3398.3 3398.4 0
2017-12-21 Multi-Stage Fracture 3375.6 3375.7 0
2017-12-21 Multi-Stage Fracture 3352.9 3353 0
2017-12-21 Multi-Stage Fracture 3330.2 3330.3 0
2017-12-21 Multi-Stage Fracture 3307.7 3307.8 0
2017-12-21 Multi-Stage Fracture 3285 3285.1 0
2017-12-21 Multi-Stage Fracture 3262.3 3262.4 0
2017-12-22 Multi-Stage Fracture 3239.8 3239.9 0
2017-12-22 Multi-Stage Fracture 3217.2 3217.3 0
2017-12-22 Multi-Stage Fracture 3194.4 3194.5 0
2017-12-22 Multi-Stage Fracture 3171.7 3171.8 0
2017-12-22 Multi-Stage Fracture 3149 3149.1 0
2017-12-22 Multi-Stage Fracture 3126.3 3126.4 0
2017-12-22 Multi-Stage Fracture 3103.7 3103.8 0
2017-12-22 Multi-Stage Fracture 3081.1 3081.2 0
2017-12-22 Multi-Stage Fracture 3058.4 3058.5 0
2017-12-22 Multi-Stage Fracture 3035.8 3035.9 0
2017-12-22 Multi-Stage Fracture 3013.1 3013.2 0
2017-12-22 Multi-Stage Fracture 2990.4 2990.5 0
2017-12-22 Multi-Stage Fracture 2967.7 2967.8 0
2017-12-22 Multi-Stage Fracture 2944.8 2944.9 0
2017-12-22 Multi-Stage Fracture 2922.1 2922.2 0
2017-12-22 Multi-Stage Fracture 2899.4 2899.5 0
2017-12-22 Multi-Stage Fracture 2876.8 2876.9 0
2017-12-22 Multi-Stage Fracture 2854.1 2854.2 0
2017-12-22 Multi-Stage Fracture 2831.5 2831.6 0
2017-12-22 Multi-Stage Fracture 2808.8 2808.9 0
2017-12-22 Multi-Stage Fracture 2786.1 2786.2 0
2017-12-22 Multi-Stage Fracture 2763.5 2763.6 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
12/19/2017 12/22/2017 Petroleum distillates 64742-47-8 Friction Reducer 0.1931 BJ Services
Crystalline Silica (Quartz) 14808-60-7 2.8362 BJ Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
12/20/2017 12/23/2017 0:00 Groundwater - Non-saline less than or equal to 150m deep 5598

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7608 2086.0 0.0 655.0
2019 1212 165.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-15 No Incident N/A N/A
2018-01-12 No Incident N/A N/A

For data sources see[9]

References