X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274260912W04

Well Details

Well ID: 0274260912W04
Loading map...
Location: W0/12-09-027-26W4/4
Location Alias: W0/12-09-27-26 W4M
Location Alias 2: W0/12-09-027-26 W4/04
Province: Alberta
County/Municipality: Rocky View County
Well Name: EMBER 1W0 ENTICE 12-9-27-26
Operator Name: Ember Resources Inc.
License Number: 0268712
License Date: 2002-03-18
License Status: Amended
Spud Date: 2002-03-25
Final Drill Date: 2002-04-01
Well Total Depth: 1979 m
Surface Hole Latitude: 51.294865
Surface Hole Longitude: -113.609869

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
2002-03-28 1050

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-08-09 Perforation 1946 1948.5 17
2002-08-09 Perforation 1942 1943 17
2002-08-15 Packing Device Capped w/Cement 1931 1939 0
2002-08-15 Perforation 1639.5 1642.5 17
2002-09-05 Fracture 1639.5 1642.5 0
2003-06-19 Perforation 953 958 13
2003-06-26 Perforation 932 934 13
2003-08-16 Perforation 744 746 13
2005-07-26 Perforation 685.6 686.1 13
2005-07-26 Perforation 684.8 685.3 13
2005-07-26 Perforation 669.7 670.2 13
2005-07-26 Perforation 649 649.5 13
2005-07-26 Perforation 647.7 648.2 13
2005-07-26 Perforation 637.5 638 13
2005-07-26 Perforation 632.1 632.6 13
2005-07-26 Perforation 627.8 628.3 13
2005-07-26 Perforation 618.9 619.4 13
2005-07-26 Perforation 617.7 618.2 13
2005-07-26 Perforation 604.3 604.8 13
2005-07-26 Perforation 596.8 597.3 13
2005-07-26 Perforation 589.6 590.1 13
2005-07-26 Perforation 588.6 589.1 13
2005-07-26 Perforation 586 586.5 13
2005-07-26 Perforation 567.2 567.7 13
2005-07-26 Perforation 562.7 563.2 13
2005-07-26 Perforation 561.7 562.2 13
2005-07-26 Perforation 541.1 541.6 13
2005-07-26 Perforation 538.5 539 13
2005-07-26 Perforation 534.1 534.6 13
2005-07-26 Perforation 527.1 527.6 13
2005-07-26 Perforation 516.7 517.2 13
2005-07-26 Perforation 506.6 507.1 13
2005-07-26 Perforation 496.1 496.6 13
2005-07-26 Perforation 493 493.5 13
2005-07-26 Perforation 488 488.5 13
2005-07-26 Perforation 470.9 471.4 13
2005-07-26 Perforation 389.9 390.4 13
2005-07-26 Perforation 384.7 385.2 13
2005-07-26 Perforation 375 375.5 13
2005-07-26 Perforation 372.1 372.6 13
2005-07-26 Perforation 364.8 365.3 13
2005-07-26 Perforation 363.1 363.6 13
2005-07-29 Fracture 363.2 686.1 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1052 145.4 0.0 0.0
2004 5608 260.1 0.0 0.0
2005 8464 317.2 0.0 0.0
2006 8743 411.3 0.0 0.0
2007 8759 326.5 0.0 0.0
2008 8783 378.1 0.0 3.0
2009 8759 308.3 0.0 0.0
2010 8743 294.7 0.0 0.0
2011 8755 225.5 0.0 0.2
2012 8782 163.7 0.0 0.9
2013 8759 263.6 0.0 2.3
2014 8716 380.0 0.0 0.9
2015 8696 487.3 0.0 5.9
2016 8621 642.7 0.0 4.2
2017 8627 603.5 0.0 5.1
2018 8000 509.4 0.0 17.2
2019 2115 68.8 0.0 1.2

For data sources see[5]

References