If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776102613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.69224,"lon":-119.444942,"icon":""}]} |
Location: 00/13-26-077-10W6/0 | |
Location Alias: 00/13-26-77-10 W6M | |
Location Alias 2: 00/13-26-077-10 W6/00 | |
Province: Alberta | |
County/Municipality: Saddle Hills County | |
Well Name: BIRCHCLIFF HZ PROGRESS 13-26-77-10 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0437212 | |
License Date: 2011-09-28 | |
License Status: Issued | |
Spud Date: 2011-10-07 | |
Final Drill Date: 2011-10-28 | |
Well Total Depth: 3589 m | |
Surface Hole Latitude: 55.69224 | |
Surface Hole Longitude: -119.444942 |
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-09 | 1010 | Horizontal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-08 | Open Hole/Barefoot Completion | 3568.6 | 3589 | 0 |
2011-11-08 | Multi-Stage Fracture | 3549.3 | 3550.1 | 0 |
2011-11-08 | Multi-Stage Fracture | 3446 | 3446.8 | 0 |
2011-11-08 | Multi-Stage Fracture | 3343.2 | 3344 | 0 |
2011-11-08 | Multi-Stage Fracture | 3254.7 | 3255.5 | 0 |
2011-11-14 | Multi-Stage Fracture | 2948.2 | 2949 | 0 |
2011-11-14 | Multi-Stage Fracture | 2844.9 | 2845.7 | 0 |
2011-11-14 | Multi-Stage Fracture | 2755.5 | 2756.3 | 0 |
2011-11-14 | Multi-Stage Fracture | 2651.9 | 2652.7 | 0 |
2011-11-14 | Multi-Stage Fracture | 2548.5 | 2549.3 | 0 |
2011-11-15 | Multi-Stage Fracture | 2445.2 | 2446 | 0 |
2011-11-15 | Multi-Stage Fracture | 2343.4 | 2344.2 | 0 |
2011-11-15 | Multi-Stage Fracture | 2253.8 | 2254.6 | 0 |
2011-11-15 | Multi-Stage Fracture | 2150.3 | 2151.1 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 82 | 451.1 | 0.0 | 264.5 |
2012 | 6503 | 22809.3 | 0.0 | 0.0 |
2013 | 8231 | 11369.0 | 0.0 | 247.1 |
2014 | 8304 | 7525.2 | 0.0 | 394.2 |
2015 | 8729 | 5314.3 | 0.0 | 121.6 |
2016 | 7815 | 4136.4 | 0.0 | 47.8 |
2017 | 6766 | 2947.2 | 0.0 | 68.9 |
2018 | 1584 | 674.7 | 0.0 | 92.2 |
For data sources see[5]