X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776132516030

Well Details

Well ID: 0776132516030
Loading map...
Location: 03/16-25-077-13W6/0
Location Alias: 03/16-25-77-13 W6M
Location Alias 2: 03/16-25-077-13 W6/00
Province: Alberta
County/Municipality: Saddle Hills County
Well Name: KELT EXP 103 HZ PCOUPES 16-25-77-13
Operator Name: Kelt Exploration Ltd.
License Number: 0482045
License Date: 2016-12-20
License Status: Issued
Spud Date: 2016-12-28
Final Drill Date: 2017-01-14
Well Total Depth: 5399 m
Surface Hole Latitude: 55.679124
Surface Hole Longitude: -119.866091

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
28 Dec 2016 Horizon Drilling Inc. 45 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-01-03 2055
2017-01-06 2441 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-15 Open Hole/Barefoot Completion 5378.8 5399 0
2017-02-18 Multi-Stage Fracture 5353.8 5353.9 0
2017-02-18 Multi-Stage Fracture 5319 5319.1 0
2017-02-18 Multi-Stage Fracture 5277.3 5277.4 0
2017-02-18 Multi-Stage Fracture 5236.2 5236.3 0
2017-02-18 Multi-Stage Fracture 5165.9 5166 0
2017-02-19 Multi-Stage Fracture 5111.7 5111.8 0
2017-02-19 Multi-Stage Fracture 5042.1 5042.2 0
2017-02-19 Multi-Stage Fracture 4988.3 4988.4 0
2017-02-19 Multi-Stage Fracture 4919.3 4919.4 0
2017-02-19 Multi-Stage Fracture 4862.6 4862.7 0
2017-02-19 Multi-Stage Fracture 4787.4 4787.5 0
2017-02-19 Multi-Stage Fracture 4719 4719.1 0
2017-02-19 Multi-Stage Fracture 4651 4651.1 0
2017-02-19 Multi-Stage Fracture 4582.5 4582.6 0
2017-02-20 Multi-Stage Fracture 4514.3 4514.4 0
2017-02-20 Multi-Stage Fracture 4445.5 4445.6 0
2017-02-20 Multi-Stage Fracture 4378.2 4378.3 0
2017-02-20 Multi-Stage Fracture 4323.4 4323.5 0
2017-02-20 Multi-Stage Fracture 4256.6 4256.7 0
2017-02-20 Multi-Stage Fracture 4190.3 4190.4 0
2017-02-20 Multi-Stage Fracture 4126.4 4126.5 0
2017-02-20 Multi-Stage Fracture 4055.9 4056 0
2017-02-20 Multi-Stage Fracture 3986.1 3986.2 0
2017-02-21 Multi-Stage Fracture 3918.6 3918.7 0
2017-02-21 Multi-Stage Fracture 3850 3850.1 0
2017-02-21 Multi-Stage Fracture 3769.4 3769.5 0
2017-02-21 Multi-Stage Fracture 3714.5 3714.6 0
2017-02-21 Multi-Stage Fracture 3646.2 3646.3 0
2017-02-21 Multi-Stage Fracture 3577.6 3577.7 0
2017-02-21 Multi-Stage Fracture 3510.7 3510.8 0
2017-02-21 Multi-Stage Fracture 3442.3 3442.4 0
2017-02-21 Multi-Stage Fracture 3375.5 3375.6 0
2017-02-22 Multi-Stage Fracture 3307.5 3307.6 0
2017-02-22 Multi-Stage Fracture 3239.9 3240 0
2017-02-22 Multi-Stage Fracture 3170.1 3170.2 0
2017-02-22 Multi-Stage Fracture 3099.2 3099.3 0
2017-02-22 Multi-Stage Fracture 3028.4 3028.5 0
2017-02-22 Multi-Stage Fracture 2957.6 2957.7 0
2017-02-22 Multi-Stage Fracture 2886.8 2886.9 0
2017-02-22 Multi-Stage Fracture 2816.2 2816.3 0
2017-02-22 Multi-Stage Fracture 2745.3 2745.4 0
2017-02-22 Multi-Stage Fracture 2674.4 2674.5 0
2017-02-23 Multi-Stage Fracture 2603.8 2603.9 0
2017-02-23 Multi-Stage Fracture 2533.1 2533.2 0
2017-02-23 Multi-Stage Fracture 2462.3 2462.4 0
2017-02-23 Multi-Stage Fracture 2429.3 2429.4 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
02/18/2017 02/23/2017 Poly(oxyethelyne. oxypropylene) copolymer. liquids 11/6/9003 Demulsifier 0.0405 Canyon Technical Services
Iron Oxide 1309-37-1 2.6983 Canyon Technical Services
Crystalline silica. quartz 14808-60-7 13.4372 Canyon Technical Services
Iron Oxide 1309-37-1 13.4372 Canyon Technical Services
Titanium Oxide 13463-67-7 13.4371 Canyon Technical Services
Aluminum Oxide 1344-28-1 2.6983 Canyon Technical Services
Crystalline silica. quartz 14808-60-7 2.6983 Canyon Technical Services
Iron Oxide 1309-37-1 2.6983 Canyon Technical Services
Titanium Oxide 13463-67-7 2.6982 Canyon Technical Services
Phosphate Salt Not Available Bactericide/Biocide 0.0248 Canyon Technical Services
Water 7732-18-5 Bactericide/Biocide 0.0248 Canyon Technical Services
No hazardous ingredients Not Available Clay Control 0.0556 Canyon Technical Services
1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues 68609-68-7 Demulsifier 0.0405 Canyon Technical Services
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) 26836-07-7 Demulsifier 0.0405 Canyon Technical Services
Methanol 67-56-1 Demulsifier 0.0405 Canyon Technical Services
Poly(oxyethelyne. oxypropylene) copolymer. liquids 9003-11-06 Demulsifier 0.0405 Canyon Technical Services
Water 7732-18-5 Demulsifier 0.0405 Canyon Technical Services
No hazardous ingredients Not Available Gelling Agent 0.0571 Canyon Technical Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2/18/2017 2/23/2017 0:00 Recycled Fracturing Water (treated at well site) 1534
2/18/2017 2/23/2017 0:00 Surface Water - Runoff 10707

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 4101 54369.5 0.0 0.0
2018 7926 86764.2 0.0 2326.0
2019 2017 15824.6 0.0 441.4

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-17 No Incident N/A N/A
2017-03-09 No Incident N/A N/A

For data sources see[9]

References