If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0765053503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.637132,"lon":-114.664506,"icon":""}]} |
Location: 00/03-35-076-05W5/0 | |
Location Alias: 00/03-35-76-05 W5M | |
Location Alias 2: 00/03-35-076-05 W5/00 | |
Province: Alberta | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: DELTASTREAM HZ MARTEN 3-35-76-5 | |
Operator Name: Deltastream Energy Corporation | |
License Number: 0486934 | |
License Date: 2017-12-07 | |
License Status: Issued | |
Spud Date: 2018-01-29 | |
Final Drill Date: 2018-02-02 | |
Well Total Depth: 2268 m | |
Surface Hole Latitude: 55.637132 | |
Surface Hole Longitude: -114.664506 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
29 Jan 2018 | Precision Drilling Corporation | 294 | N/A | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-01-30 | 214 | |
2018-01-30 | 705 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-02-02 | Open Hole/Barefoot Completion | 789 | 2268 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5585 | 194.3 | 0.0 | 410.1 |
2019 | 2159 | 80.4 | 0.0 | 30.8 |
For data sources see[6]