X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786090109000

Well Details

Well ID: 0786090109000
Loading map...
Location: 00/09-01-078-09W6/0
Location Alias: 00/09-01-78-09 W6M
Location Alias 2: 00/09-01-078-09 W6/00
Province: Alberta
County/Municipality: Saddle Hills County
Well Name: KELT EXP HZ PROGRESS 9-1-78-9
Operator Name: Kelt Exploration Ltd.
License Number: 0481652
License Date: 2016-11-29
License Status: Issued
Spud Date: 2017-01-05
Final Drill Date: 2017-01-22
Well Total Depth: 4630 m
Surface Hole Latitude: 55.733668
Surface Hole Longitude: -119.281874

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
05 Jan 2017 Precision Drilling Corporation 225 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-01-09 688
2017-01-13 2122 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-23 Open Hole/Barefoot Completion 4615 4630 0
2017-03-03 Multi-Stage Fracture 4590 4590.1 0
2017-03-03 Multi-Stage Fracture 4555.2 4555.3 0
2017-03-03 Multi-Stage Fracture 4498.9 4499 0
2017-03-03 Multi-Stage Fracture 4456 4456.1 0
2017-03-03 Multi-Stage Fracture 4399.6 4399.7 0
2017-03-03 Multi-Stage Fracture 4343.2 4343.3 0
2017-03-03 Multi-Stage Fracture 4287.8 4287.9 0
2017-03-03 Multi-Stage Fracture 4231.4 4231.5 0
2017-03-03 Multi-Stage Fracture 4176.1 4176.2 0
2017-03-03 Multi-Stage Fracture 4121.7 4121.8 0
2017-03-03 Multi-Stage Fracture 4065.3 4065.4 0
2017-03-04 Multi-Stage Fracture 4008.9 4009 0
2017-03-04 Multi-Stage Fracture 3952.5 3952.6 0
2017-03-04 Multi-Stage Fracture 3896.1 3896.2 0
2017-03-04 Multi-Stage Fracture 3840.7 3840.8 0
2017-03-04 Multi-Stage Fracture 3784.3 3784.4 0
2017-03-04 Multi-Stage Fracture 3729.1 3729.2 0
2017-03-04 Multi-Stage Fracture 3675.3 3675.4 0
2017-03-04 Multi-Stage Fracture 3621.3 3621.4 0
2017-03-04 Multi-Stage Fracture 3568.1 3568.2 0
2017-03-04 Multi-Stage Fracture 3511.7 3511.8 0
2017-03-04 Multi-Stage Fracture 3469 3469.1 0
2017-03-04 Multi-Stage Fracture 3412.6 3412.7 0
2017-03-04 Multi-Stage Fracture 3356.2 3356.3 0
2017-03-04 Multi-Stage Fracture 3300.1 3300.2 0
2017-03-04 Multi-Stage Fracture 3243.8 3243.9 0
2017-03-05 Multi-Stage Fracture 3187.4 3187.5 0
2017-03-05 Multi-Stage Fracture 3131 3131.1 0
2017-03-05 Multi-Stage Fracture 3074.6 3074.7 0
2017-03-05 Multi-Stage Fracture 3018.2 3018.3 0
2017-03-05 Multi-Stage Fracture 2962.6 2962.7 0
2017-03-05 Multi-Stage Fracture 2906.7 2906.8 0
2017-03-05 Multi-Stage Fracture 2850.3 2850.4 0
2017-03-05 Multi-Stage Fracture 2807.4 2807.5 0
2017-03-05 Multi-Stage Fracture 2743.7 2743.8 0
2017-03-05 Multi-Stage Fracture 2685.2 2685.3 0
2017-03-05 Multi-Stage Fracture 2626.5 2626.6 0
2017-03-05 Multi-Stage Fracture 2567.8 2567.9 0
2017-03-06 Multi-Stage Fracture 2510.7 2510.8 0
2017-03-06 Multi-Stage Fracture 2453.7 2453.8 0
2017-03-06 Multi-Stage Fracture 2395.1 2395.2 0
2017-03-06 Multi-Stage Fracture 2336.4 2336.5 0
2017-03-06 Multi-Stage Fracture 2265.8 2265.9 0
2017-03-06 Multi-Stage Fracture 2207.1 2207.2 0
2017-03-06 Multi-Stage Fracture 2148.7 2148.8 0
2017-03-06 Multi-Stage Fracture 2116 2116.1 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
03/03/2017 03/06/2017 Poly(oxyethelyne. oxypropylene) copolymer. liquids 11/6/9003 Demulsifier 0.0407 Canyon Technical Services
Iron Oxide 1309-37-1 3.4468 Canyon Technical Services
Crystalline silica. quartz 14808-60-7 12.6383 Canyon Technical Services
Iron Oxide 1309-37-1 12.6383 Canyon Technical Services
Titanium Oxide 13463-67-7 12.6382 Canyon Technical Services
Aluminum Oxide 1344-28-1 3.4468 Canyon Technical Services
Crystalline silica. quartz 14808-60-7 3.4468 Canyon Technical Services
Iron Oxide 1309-37-1 3.4468 Canyon Technical Services
Titanium Oxide 13463-67-7 3.4467 Canyon Technical Services
Phosphate Salt Not Available Bactericide/Biocide 0.0126 Canyon Technical Services
Water 7732-18-5 Bactericide/Biocide 0.0126 Canyon Technical Services
No hazardous ingredients Not Available Clay Control 0.0558 Canyon Technical Services
1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues 68609-68-7 Demulsifier 0.0407 Canyon Technical Services
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) 26836-07-7 Demulsifier 0.0407 Canyon Technical Services
Methanol 67-56-1 Demulsifier 0.0407 Canyon Technical Services
Poly(oxyethelyne. oxypropylene) copolymer. liquids 9003-11-06 Demulsifier 0.0407 Canyon Technical Services
Water 7732-18-5 Demulsifier 0.0407 Canyon Technical Services
No hazardous ingredients Not Available Gelling Agent 0.0576 Canyon Technical Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2/25/2017 3/6/2017 0:00 Recycled Fracturing Water (treated at well site) 1012
3/3/2017 0 3/6/2017 0:00 Surface Water - Runoff 7386

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 3185 1643.3 0.0 0.0
2018 3345 3389.5 0.0 15705.8

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-24 No Incident N/A N/A
2017-03-19 No Incident N/A N/A

For data sources see[9]

References