If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625271214002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.35577,"lon":-117.950338,"icon":""}]} |
Location: 00/14-12-062-27W5/2 | |
Location Alias: 00/14-12-62-27 W5M | |
Location Alias 2: 00/14-12-062-27 W5/02 | |
Province: Alberta | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CEQUENCE HZ SIMON 14-12-62-27 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0434251 | |
License Date: 2011-06-10 | |
License Status: Amended | |
Spud Date: 2011-08-26 | |
Final Drill Date: 2011-10-12 | |
Well Total Depth: 4588 m | |
Surface Hole Latitude: 54.35577 | |
Surface Hole Longitude: -117.950338 |
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-12 | 2094 | Horizontal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-24 | Open Hole/Barefoot Completion | 4579.5 | 4588 | 0 |
2011-10-25 | Multi-Stage Fracture | 4555.1 | 4557.7 | 0 |
2011-10-25 | Multi-Stage Fracture | 4416 | 4416.1 | 0 |
2011-10-25 | Multi-Stage Fracture | 4304.8 | 4304.9 | 0 |
2011-10-25 | Multi-Stage Fracture | 4194 | 4194.1 | 0 |
2011-10-25 | Multi-Stage Fracture | 4081.7 | 4081.8 | 0 |
2011-10-26 | Multi-Stage Fracture | 3971.2 | 3971.3 | 0 |
2011-10-26 | Multi-Stage Fracture | 3859.1 | 3859.2 | 0 |
2011-10-26 | Multi-Stage Fracture | 3760.3 | 3760.4 | 0 |
2011-10-26 | Multi-Stage Fracture | 3648.6 | 3648.7 | 0 |
2011-10-27 | Multi-Stage Fracture | 3536.4 | 3536.5 | 0 |
2011-10-27 | Multi-Stage Fracture | 3424.5 | 3424.6 | 0 |
2011-10-27 | Multi-Stage Fracture | 3312.2 | 3312.3 | 0 |
2011-10-27 | Multi-Stage Fracture | 3200 | 3200.1 | 0 |
2011-10-27 | Multi-Stage Fracture | 3074.5 | 3074.6 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1368 | 3688.4 | 0.0 | 0.0 |
2012 | 8471 | 8143.8 | 0.0 | 743.4 |
2013 | 7536 | 3241.9 | 0.0 | 674.9 |
2014 | 8735 | 3362.2 | 0.0 | 689.4 |
2015 | 5232 | 1912.6 | 0.0 | 368.2 |
2016 | 4680 | 1603.6 | 0.0 | 251.5 |
2017 | 8759 | 2056.6 | 0.0 | 309.4 |
2018 | 6336 | 1343.1 | 0.0 | 173.0 |
2019 | 912 | 137.4 | 0.0 | 21.3 |
For data sources see[5]