If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0574213015000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.961652,"lon":-113.109076,"icon":""}]} |
| Location: 00/15-30-057-21W4/0 | |
| Location Alias: 00/15-30-57-21 W4M | |
| Location Alias 2: 00/15-30-057-21 W4/00 | |
| Province: Alberta | |
| County/Municipality: Redwater | |
| Well Name: IMP REDWATER15-30-57-21 | |
| Operator Name: | |
| License Number: B0002671 | |
| License Date: 1949-03-02 | |
| License Status: RecCertified | |
| Spud Date: 1949-03-18 | |
| Final Drill Date: 1949-04-08 | |
| Well Total Depth: 992.1 m | |
| Surface Hole Latitude: 53.961652 | |
| Surface Hole Longitude: -113.109076 |
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1949-04-08 | Open Hole/Barefoot Completion | 964.4 | 992.1 | 0 |
| 1983-11-04 | Acid Treatment | 964.4 | 972.9 | 0 |
| 1987-12-10 | Cement Plug | 976.6 | 992.1 | 0 |
| 1987-12-10 | Open Hole/Barefoot Completion | 964.4 | 976.6 | 0 |
| 1987-12-10 | Perforation | 969.9 | 970.5 | 13 |
| 1987-12-10 | Perforation | 972.3 | 975.4 | 13 |
| 1991-11-22 | Cement Plug | 974.9 | 976.6 | 0 |
| 1991-11-22 | Open Hole/Barefoot Completion | 964.4 | 974.9 | 0 |
| 1992-01-10 | Cement Plug | 973.9 | 974.9 | 0 |
| 1992-01-11 | Open Hole/Barefoot Completion | 964.4 | 973.9 | 0 |
| 1996-03-15 | Packing Device Capped w/Cement | 947 | 955 | 0 |
| 1996-03-15 | Perforation | 220 | 221 | 13 |
| 1996-06-03 | Remedial Casing Cementing | 220 | 221 | 0 |
For data sources see[3]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 1220.8 | 0.0 | 164.1 |
| 1962 | 0 | 85.1 | 0.0 | 0.0 |
| 1963 | 0 | 85.9 | 0.0 | 0.0 |
| 1964 | 0 | 73.1 | 0.0 | 0.0 |
| 1965 | 0 | 41.2 | 0.0 | 0.0 |
| 1974 | 7770 | 252.9 | 0.0 | 5527.1 |
| 1975 | 6127 | 209.4 | 0.0 | 5103.3 |
| 1976 | 8428 | 131.4 | 0.0 | 16097.8 |
| 1977 | 8144 | 125.9 | 0.0 | 17610.7 |
| 1978 | 8365 | 122.9 | 0.0 | 20072.1 |
| 1979 | 8524 | 74.7 | 0.0 | 14661.7 |
| 1980 | 8442 | 18.2 | 0.0 | 13965.2 |
| 1981 | 8522 | 20.0 | 0.0 | 12711.2 |
| 1982 | 7745 | 58.4 | 0.0 | 12275.0 |
| 1983 | 8545 | 78.0 | 0.0 | 11633.4 |
| 1984 | 8437 | 42.8 | 0.0 | 25856.5 |
| 1985 | 8165 | 35.2 | 0.0 | 10043.2 |
| 1986 | 8458 | 25.5 | 0.0 | 6568.0 |
| 1987 | 8392 | 26.3 | 0.0 | 5976.2 |
| 1988 | 8171 | 15.4 | 0.0 | 17190.2 |
| 1989 | 8506 | 106.2 | 0.0 | 85138.1 |
| 1990 | 7736 | 89.6 | 0.0 | 129051.8 |
| 1991 | 7487 | 55.1 | 0.0 | 113244.1 |
| 1992 | 1456 | 0.2 | 0.0 | 2873.4 |
| 1994 | 1056 | 0.0 | 0.0 | 1177.9 |
For data sources see[4]