If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0574213110000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.972448,"lon":-113.109131,"icon":""}]} |
Location: 00/10-31-057-21W4/0 | |
Location Alias: 00/10-31-57-21 W4M | |
Location Alias 2: 00/10-31-057-21 W4/00 | |
Province: Alberta | |
County/Municipality: Sturgeon County | |
Well Name: BREVIA007 REDWATER 10-31-57-21 | |
Operator Name: | |
License Number: B0002888 | |
License Date: 1949-05-21 | |
License Status: Abandoned | |
Spud Date: 1949-06-11 | |
Final Drill Date: 1949-06-25 | |
Well Total Depth: 971.7 m | |
Surface Hole Latitude: 53.972448 | |
Surface Hole Longitude: -113.109131 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-06-25 | Open Hole/Barefoot Completion | 937 | 971.7 | 0 |
1949-06-25 | Acid Wash | 937 | 971.7 | 0 |
1991-11-04 | Perforation | 933.9 | 936 | 13 |
1991-11-05 | Acid Treatment | 933.9 | 936 | 0 |
2005-09-28 | Packing Device Capped w/Cement | 918 | 926 | 0 |
2005-09-30 | Perforation | 470 | 472 | 20 |
2005-09-30 | Perforation | 323 | 325 | 20 |
2005-10-03 | Remedial Casing Cementing | 470 | 472 | 0 |
2005-10-03 | Packing Device Capped w/Cement | 447.7 | 465 | 0 |
2005-10-03 | Remedial Casing Cementing | 323 | 325 | 0 |
2005-10-06 | Packing Device Capped w/Cement | 310 | 340 | 0 |
2005-10-06 | Perforation | 293 | 295 | 20 |
2005-10-06 | Remedial Casing Cementing | 293 | 295 | 0 |
2005-10-06 | Cement Plug | 289 | 295 | 0 |
2005-10-07 | Perforation | 230 | 232 | 20 |
2005-10-11 | Cement Plug | 232 | 289 | 0 |
2005-10-11 | Remedial Casing Cementing | 230 | 232 | 0 |
2005-10-11 | Cement Plug | 153.2 | 232 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 1618.3 | 0.0 | 94.0 |
1962 | 0 | 130.9 | 0.0 | 0.0 |
1963 | 0 | 118.2 | 0.0 | 0.0 |
1964 | 0 | 119.6 | 0.0 | 0.0 |
1965 | 0 | 119.9 | 0.0 | 133.6 |
1966 | 0 | 157.2 | 0.0 | 2169.6 |
1967 | 6178 | 179.9 | 0.0 | 4047.3 |
1968 | 5624 | 336.8 | 0.0 | 0.0 |
1969 | 7353 | 457.1 | 0.0 | 0.0 |
1970 | 6908 | 511.5 | 0.0 | 443.6 |
1971 | 6451 | 641.2 | 0.0 | 269.6 |
1972 | 7014 | 693.9 | 0.0 | 238.8 |
1973 | 8036 | 456.0 | 0.0 | 3463.1 |
1974 | 6755 | 131.3 | 0.0 | 7006.1 |
1980 | 1865 | 5.2 | 0.0 | 1996.5 |
1981 | 8270 | 80.1 | 0.0 | 85798.5 |
1982 | 7418 | 86.9 | 0.0 | 123568.0 |
1983 | 8453 | 66.8 | 0.0 | 146881.3 |
1984 | 8087 | 77.8 | 0.0 | 130460.3 |
1985 | 7230 | 31.3 | 0.0 | 108618.3 |
1994 | 2266 | 29.4 | 0.0 | 57455.8 |
1995 | 8566 | 50.8 | 0.0 | 216084.4 |
1996 | 8653 | 46.1 | 0.0 | 230664.0 |
1997 | 8333 | 32.3 | 0.0 | 203366.5 |
1998 | 7583 | 26.7 | 0.0 | 182603.0 |
1999 | 8398 | 17.7 | 0.0 | 207407.0 |
2000 | 8733 | 19.7 | 0.0 | 209485.7 |
2001 | 3085 | 7.9 | 0.0 | 74911.3 |
For data sources see[4]