X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0835232816020

Well Details

Well ID: 0835232816020
Loading map...
Location: 02/16-28-083-23W5/0
Location Alias: 02/16-28-83-23 W5M
Location Alias 2: 02/16-28-083-23 W5/00
Province: Alberta
County/Municipality: Municipal District of Peace No. 135
Well Name: CANAMAX HZ 102 GRIMSHAW 16-28-83-23
Operator Name: Canamax Energy Ltd.
License Number: 0488310
License Date: 2018-02-15
License Status: Issued
Spud Date: 2018-02-22
Final Drill Date: 2018-02-26
Well Total Depth: 2356 m
Surface Hole Latitude: 56.215015
Surface Hole Longitude: -117.563673

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
22 Feb 2018 Nabors Drilling Canada Limited 21 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-02-24 526
2018-02-25 939 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-07 Multi-Stage Fracture 2293.8 2294.3 0
2018-03-07 Multi-Stage Fracture 2252.6 2253.2 0
2018-03-07 Multi-Stage Fracture 2211.4 2212 0
2018-03-07 Multi-Stage Fracture 2170.2 2170.8 0
2018-03-07 Multi-Stage Fracture 2129.1 2129.7 0
2018-03-07 Multi-Stage Fracture 2101.4 2102 0
2018-03-07 Multi-Stage Fracture 2073.8 2074.4 0
2018-03-07 Multi-Stage Fracture 2046.1 2046.7 0
2018-03-07 Multi-Stage Fracture 2018.5 2019.1 0
2018-03-07 Multi-Stage Fracture 1990.8 1991.4 0
2018-03-07 Multi-Stage Fracture 1963.1 1963.8 0
2018-03-07 Multi-Stage Fracture 1935.5 1936.1 0
2018-03-07 Multi-Stage Fracture 1907.8 1908.4 0
2018-03-07 Multi-Stage Fracture 1880.1 1880.7 0
2018-03-08 Multi-Stage Fracture 1852.4 1853 0
2018-03-08 Multi-Stage Fracture 1825 1825.6 0
2018-03-08 Multi-Stage Fracture 1797.3 1797.9 0
2018-03-08 Multi-Stage Fracture 1769.6 1770.3 0
2018-03-08 Multi-Stage Fracture 1743 1743.6 0
2018-03-08 Multi-Stage Fracture 1715.4 1716 0
2018-03-08 Multi-Stage Fracture 1690.7 1691.3 0
2018-03-08 Multi-Stage Fracture 1663.1 1663.7 0
2018-03-08 Multi-Stage Fracture 1635.4 1636 0
2018-03-08 Multi-Stage Fracture 1607.7 1608.3 0
2018-03-08 Multi-Stage Fracture 1580.1 1580.7 0
2018-03-08 Multi-Stage Fracture 1552.4 1553 0
2018-03-08 Multi-Stage Fracture 1524.8 1525.4 0
2018-03-08 Multi-Stage Fracture 1497.1 1497.7 0
2018-03-08 Multi-Stage Fracture 1469.4 1470 0
2018-03-08 Multi-Stage Fracture 1441.7 1442.3 0
2018-03-08 Multi-Stage Fracture 1414.1 1414.7 0
2018-03-08 Multi-Stage Fracture 1386.4 1387 0
2018-03-08 Multi-Stage Fracture 1358.7 1359.3 0
2018-03-08 Multi-Stage Fracture 1331.1 1331.7 0
2018-03-08 Multi-Stage Fracture 1289.8 1290.4 0
2018-03-08 Multi-Stage Fracture 1248.6 1249.2 0
2018-03-08 Multi-Stage Fracture 1207.4 1208 0
2018-03-08 Multi-Stage Fracture 1166.2 1166.8 0
2018-03-08 Multi-Stage Fracture 1124.8 1125.4 0
2018-03-08 Multi-Stage Fracture 1084.5 1085.1 0
2018-03-08 Multi-Stage Fracture 1044.3 1044.9 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
03/07/2018 03/08/2018 Methyl Alcohol 67-56-1 Activator 0.189 Step Energy Services
Polyethylene glycol 25322-68-3 Activator 0.189 Step Energy Services
Polyalkylhydroxyl Alcohol Not Available Surfactant 0.1351 Step Energy Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
3/7/2018 0 3/8/2018 0:00 Surface Water - Runoff 1631

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6717 693.4 0.0 6051.1
2019 2139 227.6 0.0 1738.5

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-27 No Incident N/A N/A
2018-03-17 No Incident N/A N/A

For data sources see[9]

References