X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0835233404020

Well Details

Well ID: 0835233404020
Loading map...
Location: 02/04-34-083-23W5/0
Location Alias: 02/04-34-83-23 W5M
Location Alias 2: 02/04-34-083-23 W5/00
Province: Alberta
County/Municipality: Municipal District of Peace No. 135
Well Name: CANAMAX HZ GRIMSHAW 4-34-83-23
Operator Name: Canamax Energy Ltd.
License Number: 0485679
License Date: 2017-10-04
License Status: Amended
Spud Date: 2018-03-04
Final Drill Date: 2018-03-07
Well Total Depth: 2511 m
Surface Hole Latitude: 56.236607
Surface Hole Longitude: -117.582447

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
2018-03-05 603
2018-03-06 978 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-20 Multi-Stage Fracture 2443.3 2443.9 0
2018-03-20 Multi-Stage Fracture 2402.1 2402.7 0
2018-03-20 Multi-Stage Fracture 2360.9 2361.6 0
2018-03-21 Multi-Stage Fracture 2319.8 2320.4 0
2018-03-21 Multi-Stage Fracture 2278.6 2279.2 0
2018-03-21 Multi-Stage Fracture 2237.4 2238 0
2018-03-21 Multi-Stage Fracture 2196.1 2196.7 0
2018-03-21 Multi-Stage Fracture 2154.9 2155.5 0
2018-03-21 Multi-Stage Fracture 2113.7 2114.3 0
2018-03-21 Multi-Stage Fracture 2072.6 2073.2 0
2018-03-21 Multi-Stage Fracture 2031.4 2032 0
2018-03-21 Multi-Stage Fracture 1990.2 1990.8 0
2018-03-21 Multi-Stage Fracture 1949 1949.6 0
2018-03-21 Multi-Stage Fracture 1907.8 1908.6 0
2018-03-21 Multi-Stage Fracture 1866.6 1867.2 0
2018-03-21 Multi-Stage Fracture 1826.4 1827.1 0
2018-03-21 Multi-Stage Fracture 1785.1 1785.7 0
2018-03-21 Multi-Stage Fracture 1757.4 1758 0
2018-03-21 Multi-Stage Fracture 1729.8 1730.4 0
2018-03-21 Multi-Stage Fracture 1702.1 1702.7 0
2018-03-21 Multi-Stage Fracture 1674.5 1675.1 0
2018-03-21 Multi-Stage Fracture 1646.8 1647.4 0
2018-03-21 Multi-Stage Fracture 1619.9 1620.5 0
2018-03-21 Multi-Stage Fracture 1592.3 1593 0
2018-03-21 Multi-Stage Fracture 1564.7 1565.3 0
2018-03-21 Multi-Stage Fracture 1537.1 1537.7 0
2018-03-21 Multi-Stage Fracture 1509.4 1510 0
2018-03-21 Multi-Stage Fracture 1481.7 1482.3 0
2018-03-21 Multi-Stage Fracture 1454.1 1454.7 0
2018-03-21 Multi-Stage Fracture 1426.4 1427 0
2018-03-21 Multi-Stage Fracture 1398.7 1399.3 0
2018-03-21 Multi-Stage Fracture 1371 1371.6 0
2018-03-21 Multi-Stage Fracture 1343.4 1344 0
2018-03-21 Multi-Stage Fracture 1315.7 1316.3 0
2018-03-21 Multi-Stage Fracture 1288 1288.6 0
2018-03-21 Multi-Stage Fracture 1260.3 1260.9 0
2018-03-21 Multi-Stage Fracture 1219.2 1219.8 0
2018-03-21 Multi-Stage Fracture 1177.9 1178.5 0
2018-03-21 Multi-Stage Fracture 1136.8 1137.4 0
2018-03-21 Multi-Stage Fracture 1095.6 1096.2 0
2018-03-21 Multi-Stage Fracture 1054.5 1055.1 0

For data sources see[4]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
03/20/2018 03/21/2018 Methyl Alcohol 67-56-1 Activator 0.1578 Step Energy Services
Polyethylene glycol 25322-68-3 Activator 0.1578 Step Energy Services
Polyalkylhydroxyl Alcohol Not Available Surfactant 0.1351 Step Energy Services

For data sources see[5]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6012 340.1 0.0 5891.3
2019 2147 114.9 0.0 1190.3

For data sources see[6]

References