X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0835242516000

Well Details

Well ID: 0835242516000
Loading map...
Location: 00/16-25-083-24W5/0
Location Alias: 00/16-25-83-24 W5M
Location Alias 2: 00/16-25-083-24 W5/00
Province: Alberta
County/Municipality: Municipal District of Peace No. 135
Well Name: CANAMAX HZ ANTHONY 16-25-83-24
Operator Name: Canamax Energy Ltd.
License Number: 0481658
License Date: 2016-11-29
License Status: Amended
Spud Date: 2017-01-14
Final Drill Date: 2017-01-17
Well Total Depth: 2483 m
Surface Hole Latitude: 56.226418
Surface Hole Longitude: -117.665505

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
14 Jan 2017 Nabors Drilling Canada Limited 21 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-01-15 544
2017-01-16 1015 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-02-23 Multi-Stage Fracture 2425 2425.9 0
2017-02-23 Multi-Stage Fracture 2401.6 2402.5 0
2017-02-23 Multi-Stage Fracture 2355.6 2356.5 0
2017-02-23 Multi-Stage Fracture 2309.7 2310.6 0
2017-02-23 Multi-Stage Fracture 2263.8 2264.7 0
2017-02-23 Multi-Stage Fracture 2217.9 2218.8 0
2017-02-23 Multi-Stage Fracture 2172 2172.9 0
2017-02-23 Multi-Stage Fracture 2126 2126.9 0
2017-02-23 Multi-Stage Fracture 2080.1 2081 0
2017-02-23 Multi-Stage Fracture 2034.3 2035.2 0
2017-02-23 Multi-Stage Fracture 1999.7 2000.6 0
2017-02-23 Multi-Stage Fracture 1965.1 1966 0
2017-02-23 Multi-Stage Fracture 1930.4 1931.3 0
2017-02-23 Multi-Stage Fracture 1895.7 1896.6 0
2017-02-23 Multi-Stage Fracture 1861.2 1862.1 0
2017-02-23 Multi-Stage Fracture 1826.4 1827.3 0
2017-02-24 Multi-Stage Fracture 1791.5 1792.4 0
2017-03-18 Perforation 1010 1011 17
2017-03-19 Remedial Casing Cementing 1010 1011 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
02/23/2017 02/24/2017 Methyl Alcohol 67-56-1 Activator 0.2825 Step Energy Services
Polyethylene glycol 25322-68-3 Activator 0.2825 Step Energy Services
Alcohols. C12-14-Secondary. Ethoxylated 84133-50-6 Activator 0.2825 Step Energy Services
Methyl Alcohol 67-56-1 Activator 0.2825 Step Energy Services
Polyethylene Glycol 25322-68-3 Activator 0.2825 Step Energy Services
2-bromo-2-nitro.3-diol 52-51-7 Bactericide/Biocide 0.0274 Step Energy Services
Methyl Alcohol 67-56-1 Bactericide/Biocide 0.0274 Step Energy Services
Non-Hazardous Ingredients Not Available Bactericide/Biocide 0.0274 Step Energy Services
Persulfate compounds 7727-54-0 Breaker 0.0809 Step Energy Services
Non-Hazardous Ingredients Not Available Clay Control 0.1092 Step Energy Services
Non-Hazardous Ingredients Not Available Gelling Agent 0.6776 Step Energy Services
Proprietary Not Available Surfactant 0.1093 Step Energy Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2/20/2017 2/25/2017 0:00 Surface Water - Runoff 416

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6287 232.5 0.0 3006.9
2018 8532 354.2 0.0 6481.7
2019 2157 84.0 0.0 1711.3

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-21 Lost Circulation 2478.00 2478.00
2017-03-25 No Incident N/A N/A

For data sources see[9]

References