If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-127-20017 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.765888,"lon":-75.109388,"icon":""}]} |
Operator Name: NEWFIELD APPALACHIA PA LLC | |
First Permit Date: 2010-05-27 | |
Last Permit Date: 2010-05-27 | |
Spud Date: 2010-06-25 | |
Unconventional: No | |
Horizontal: No | |
Violations: 1 | |
Latitude: 41.765888 | |
Longitude: -75.109388 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-0 | DRILLING FLUID WASTE | 3720.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2010-0 | DRILL CUTTINGS | 26.0 | Tons | LANDFILL | 101247 | KEYSTONE SANITARY LANDFILL | DUNMORE | PA |
2010-0 | DRILLING FLUID WASTE | 2795.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 | WASTE TREATMENT CORPORATION | WARREN | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1900332 | 2010-07-22 | No Violations Noted | UDI rig 48. 20" conductor set. Rigging up to start drilling 13 3/8" casing. Reserve pit in good condition. Freeboard = 5'. Work area is lined with plastic and perimeter around rig is bermed. Drillers log on site and up to date. Mudlogger on site to log hole fro surface to TD. | |
1912355 | 2010-09-02 | No Violations Noted | Well installation complete. Rig moved off location to Crum. Reserve pit still open and full of fluid. Freeboard ok and liner in good condition. Plan to solidify and encapsulate pit next week. | |
1912375 | 2010-09-08 | No Violations Noted | Complaint of Sulphur odor coming from site. Contractor in process of dewatering pit. Fluid transferred to frac tanks and then trucked offsite for disposal. When pumping- odor emiited through vents on tanks. Pit is going to be solidified and then encapsulated this week. | |
1926591 | 2010-11-02 | No Violations Noted | Mike O'Donnell and I conducted an inspection of this site. We recommend that the operator update the E&S plan to accurately reflect the controls as installed. | |
1966501 | 2011-04-18 | No Violations Noted | on site with WQS Ryan Klemish. Inspected site and well head. Well is shut in. Pressure gauge on well indicated 0 psi. Cellar full of water. No gas bubbling observed. Well head and cellar are protected by chain-link fence and gae with pad lock. There was no activity on site at time of inspection. no violations were observed at the time of inspection. | |
1966630 | 2011-04-18 | Violation(s) Noted | 609115 | |
1968208 | 2011-04-20 | Outstanding Violations - No Viols Req'd | Meeting with Newfield representative to discuss their response to my findings on 4/18/2011. | |
1969810 | 2011-05-02 | No Violations Noted | Followup to close out violations from 4/18/2011. No viols noted. | |
2009350 | 2011-10-06 | No Violations Noted | DEP on site at 10 am. Operator has filed for Inactive Status. Site is secured with entrance gate and chain-link fence around well head. Well is temporarily shut in. No leaks observed visually in cellar. No activity on site site during inspection. E&S controls appear to be in place and working sufficiently. DEP offsite at 10:30 | |
2099639 | 2012-08-30 | No Violations Noted | On site 11:30. Gate locked. Operator provided access. No one on site at time of inspection. Well has been plugged. Well head removed and casing cut off below grade. A time of inspection cellar was full of water from recent rains. Could not see well. Operator has provided prictures of well with welded cap that has permit number welded on it. No violations observed. | |
2101959 | 2012-09-19 | No Violations Noted | Today is the second day of the reclamation activity being conducted of this pad. Monday, 9/17/12 was the first day of earth moving activity. Tuesday, 9/18/12 was a day of rain. Plans are on site, but in a weathered condition, need to be replaced. Weather is sunny today, with the next forecasted rain event being called for on Saturday, 9/22/12. Contractor is minimizing soil disturbance to north section of pad. Contractor is operating under the assumption that the originally installed silt sock is acceptable to meeting the designed runoff reduction criteria. A review of this “existing” silt sock shows that it needs to be replaced immediately. Also, debris from the existing silt sock needs to be removed. Told Ted that he can continue to conduct earth moving activities until a rain event is eminent. Hence, it was agreed that if new silt sock is not installed by the close of business on Friday, 9/22/12, | |
2102817 | 2012-09-26 | No Violations Noted | Inspection conducted with Ted Korb of Leeward Construction, contractor for Newfield Appalachia, on 9/26/12 of the Woodland Mgt. Partners well pad. Ted had called and left message on this past Friday, 9/21/12, stating that the required silt sock had been installed. Inspection revealed that the silt sock was installed as per plan, and was installed properly. Approximately 90% of the pad has been leveled back near original contours. After final leveling, top soil pile will be distributed and leveled over site. The access road built for the pad is under one acre, and hence can stay in place if land owner so desires. | |
2155629 | 2013-04-09 | Wayne | Damascus Twp | No Violations Noted |