If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0806033010003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.965374,"lon":-118.453958,"icon":""}]} |
Location: 00/10-30-080-03W6/3 | |
Location Alias: 00/10-30-80-03 W6M | |
Location Alias 2: 00/10-30-080-03 W6/03 | |
Province: Alberta | |
County/Municipality: Municipal District of Fairview No. 136 | |
Well Name: CNRL ET AL DUNVEG 10-30-80-3 | |
Operator Name: | |
License Number: 0043584 | |
License Date: 1972-09-18 | |
License Status: Issued | |
Spud Date: 1972-10-04 | |
Final Drill Date: 1972-10-18 | |
Well Total Depth: 1645.9 m | |
Surface Hole Latitude: 55.965374 | |
Surface Hole Longitude: -118.453958 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1972-11-10 | Perforation | 1462.4 | 1464.9 | 3 |
1972-11-10 | Perforation | 1458.8 | 1460.9 | 3 |
1972-11-10 | Acid Wash | 1458.8 | 1464.9 | 0 |
1972-11-13 | Fracture | 1458.8 | 1464.9 | 0 |
1972-11-14 | Perforation | 1437.7 | 1439.9 | 3 |
1972-11-15 | Acid Wash | 1437.7 | 1439.9 | 0 |
1972-11-15 | Acid Treatment | 1437.7 | 1439.9 | 0 |
1972-11-15 | Fracture | 1437.7 | 1439.9 | 0 |
1978-07-13 | Perforation | 379.5 | 381 | 7 |
1978-07-13 | Cement Squeeze | 379.5 | 381 | 0 |
1978-07-17 | Perforation | 379.5 | 381 | 7 |
1978-07-17 | Acid Treatment | 379.5 | 381 | 0 |
1978-07-18 | Cement Squeeze | 379.5 | 381 | 0 |
1989-09-06 | Perforation | 1437.1 | 1439.6 | 13 |
1989-09-06 | Perforation | 1440.8 | 1445.7 | 13 |
1989-09-13 | Fracture | 1437.1 | 1445.7 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1973 | 4766 | 13147.6 | 0.0 | 16.0 |
1974 | 6134 | 12358.5 | 0.0 | 20.6 |
1975 | 727 | 5235.7 | 0.0 | 5.9 |
1978 | 2416 | 360.7 | 0.0 | 0.4 |
1979 | 7676 | 1164.2 | 0.0 | 10.3 |
1980 | 3742 | 628.0 | 0.0 | 35.1 |
1981 | 4889 | 791.6 | 0.0 | 2.0 |
1982 | 5057 | 637.3 | 0.0 | 8.0 |
1983 | 2875 | 422.1 | 0.0 | 3.5 |
1984 | 2426 | 426.3 | 0.0 | 0.8 |
1985 | 6988 | 255.4 | 0.0 | 3.0 |
1986 | 4104 | 310.5 | 0.0 | 0.6 |
1987 | 7320 | 707.9 | 0.0 | 1.2 |
1988 | 7784 | 740.6 | 0.0 | 17.5 |
1989 | 6610 | 1918.1 | 0.0 | 6.0 |
1990 | 6077 | 6541.0 | 0.0 | 100.3 |
1991 | 4462 | 4847.2 | 0.0 | 100.0 |
1992 | 8126 | 8402.8 | 0.0 | 129.3 |
1993 | 8118 | 6350.5 | 0.0 | 84.9 |
1994 | 8567 | 5826.4 | 0.0 | 95.6 |
1995 | 8488 | 5106.1 | 0.0 | 106.8 |
1996 | 8382 | 4633.2 | 0.0 | 147.0 |
1997 | 8435 | 4337.9 | 0.0 | 90.9 |
1998 | 8253 | 4018.2 | 0.0 | 372.4 |
1999 | 6701 | 1337.6 | 0.0 | 262.3 |
For data sources see[4]