If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615271610000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.268997,"lon":-117.945574,"icon":""}]} |
Location: 00/10-16-061-27W5/0 | |
Location Alias: 00/10-16-61-27 W5M | |
Location Alias 2: 00/10-16-061-27 W5/00 | |
Province: Alberta | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CEQUENCE 4-14 HZ WANYAN 10-16-61-27 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0447774 | |
License Date: 2012-08-15 | |
License Status: Issued | |
Spud Date: 2012-08-28 | |
Final Drill Date: 2012-09-27 | |
Well Total Depth: 5634 m | |
Surface Hole Latitude: 54.268997 | |
Surface Hole Longitude: -117.945574 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
28 Aug 2012 | Canelson Drilling Inc. | 19 | N/A | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-05 | 2805 | |
2012-09-15 | 3321 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-09 | Open Hole/Barefoot Completion | 5624.5 | 5634 | 0 |
2012-10-10 | Multi-Stage Fracture | 5559.7 | 5588.4 | 0 |
2012-10-10 | Multi-Stage Fracture | 5515.4 | 5515.5 | 0 |
2012-10-10 | Multi-Stage Fracture | 5417.8 | 5417.9 | 0 |
2012-10-11 | Multi-Stage Fracture | 5334.6 | 5334.7 | 0 |
2012-10-11 | Multi-Stage Fracture | 5250.1 | 5250.2 | 0 |
2012-10-11 | Multi-Stage Fracture | 5156.6 | 5156.7 | 0 |
2012-10-11 | Multi-Stage Fracture | 5080.1 | 5080.2 | 0 |
2012-10-11 | Multi-Stage Fracture | 5006.9 | 5007 | 0 |
2012-10-11 | Multi-Stage Fracture | 4920.3 | 4920.4 | 0 |
2012-10-12 | Multi-Stage Fracture | 4833.6 | 4833.7 | 0 |
2012-10-12 | Multi-Stage Fracture | 4747.4 | 4747.5 | 0 |
2012-10-12 | Multi-Stage Fracture | 4659.5 | 4659.6 | 0 |
2012-10-12 | Multi-Stage Fracture | 4537.6 | 4537.7 | 0 |
2012-10-13 | Multi-Stage Fracture | 4486.6 | 4486.7 | 0 |
2012-10-13 | Multi-Stage Fracture | 4399.8 | 4399.9 | 0 |
2012-10-13 | Multi-Stage Fracture | 4314.3 | 4314.4 | 0 |
2012-10-13 | Multi-Stage Fracture | 4241.9 | 4242 | 0 |
2012-11-12 | Multi-Stage Fracture | 3985.9 | 3986 | 0 |
2012-11-12 | Multi-Stage Fracture | 3812.8 | 3812.9 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1417 | 2703.7 | 0.0 | 0.0 |
2013 | 8184 | 8260.0 | 0.0 | 0.0 |
2014 | 8519 | 4904.0 | 0.0 | 0.0 |
2015 | 4704 | 3580.8 | 0.0 | 1.3 |
2016 | 8160 | 4066.6 | 0.0 | 226.8 |
2017 | 8184 | 3269.1 | 0.0 | 346.6 |
2018 | 8736 | 2777.7 | 0.0 | 347.0 |
2019 | 2135 | 599.9 | 0.0 | 82.1 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-30 | No Incident | N/A | N/A |
2012-10-24 | No Incident | N/A | N/A |
2012-11-21 | No Incident | N/A | N/A |
For data sources see[7]