X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615272509000

Well Details

Well ID: 0615272509000
Loading map...
Location: 00/09-25-061-27W5/0
Location Alias: 00/09-25-61-27 W5M
Location Alias 2: 00/09-25-061-27 W5/00
Province: Alberta
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE HZ WANYAN 9-25-61-27
Operator Name: Cequence Energy Ltd.
License Number: 0440347
License Date: 2011-12-05
License Status: Issued
Spud Date: 2012-01-17
Final Drill Date: 2012-02-27
Well Total Depth: 5429 m
Surface Hole Latitude: 54.293875
Surface Hole Longitude: -117.870224

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
17 Jan 2012 Canelson Drilling Inc. 20 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-28 2703 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-05 Open Hole/Barefoot Completion 5400.4 5429 0
2012-03-06 Multi-Stage Fracture 5377.3 5378.3 0
2012-03-07 Multi-Stage Fracture 5303.9 5304 0
2012-03-07 Multi-Stage Fracture 5204.1 5204.2 0
2012-03-07 Multi-Stage Fracture 5104.4 5104.5 0
2012-03-07 Multi-Stage Fracture 5004.7 5004.8 0
2012-03-07 Multi-Stage Fracture 4905.1 4905.2 0
2012-03-07 Multi-Stage Fracture 4807.1 4807.2 0
2012-03-07 Multi-Stage Fracture 4721.1 4721.2 0
2012-03-07 Multi-Stage Fracture 4622 4622.1 0
2012-03-08 Multi-Stage Fracture 4522.8 4522.9 0
2012-03-08 Multi-Stage Fracture 4409.1 4409.2 0
2012-03-08 Multi-Stage Fracture 4308.6 4308.7 0
2012-03-08 Multi-Stage Fracture 4208.1 4208.2 0
2012-03-08 Multi-Stage Fracture 4107.7 4107.8 0
2012-03-08 Multi-Stage Fracture 4008.6 4008.7 0
2012-03-08 Multi-Stage Fracture 3908.3 3908.4 0
2012-03-08 Multi-Stage Fracture 3808.6 3808.7 0
2012-03-09 Multi-Stage Fracture 3710.1 3710.2 0
2012-03-09 Multi-Stage Fracture 3609.6 3609.7 0
2012-03-09 Multi-Stage Fracture 3518.1 3518.2 0
2012-03-09 Multi-Stage Fracture 3417.9 3418 0
2012-03-09 Multi-Stage Fracture 3331 3331.1 0
2012-03-09 Multi-Stage Fracture 3218.1 3218.2 0
2012-03-09 Multi-Stage Fracture 3118.9 3119 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6456 47431.3 0.0 0.0
2013 8519 26257.8 0.0 0.0
2014 8613 13969.0 0.0 0.0
2015 5593 8601.7 0.0 0.0
2016 8520 11696.2 0.0 0.0
2017 6599 7576.0 0.0 43.4
2018 5471 6264.4 0.0 181.4
2019 816 1256.4 0.0 13.0

For data sources see[6]

References