If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616022711002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.298337,"lon":-118.202603,"icon":""}]} |
Location: 00/11-27-061-02W6/2 | |
Location Alias: 00/11-27-61-02 W6M | |
Location Alias 2: 00/11-27-061-02 W6/02 | |
Province: Alberta | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CEQUENCE RESTHA 1-27-61-2 | |
Operator Name: XTO Energy Canada | |
License Number: 0427829 | |
License Date: 2010-12-15 | |
License Status: Suspension | |
Spud Date: 2010-12-31 | |
Final Drill Date: 2011-03-02 | |
Well Total Depth: 4585 m | |
Surface Hole Latitude: 54.298337 | |
Surface Hole Longitude: -118.202603 |
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-01 | 3083 | Horizontal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-31 | Open Hole/Barefoot Completion | 4579 | 4585 | 0 |
2011-04-01 | Multi-Stage Fracture | 4434 | 4527 | 0 |
2011-04-01 | Multi-Stage Fracture | 4309 | 4434 | 0 |
2011-04-01 | Multi-Stage Fracture | 4194 | 4309 | 0 |
2011-04-01 | Multi-Stage Fracture | 4069 | 4194 | 0 |
2011-04-01 | Multi-Stage Fracture | 3955 | 4069 | 0 |
2011-04-04 | Multi-Stage Fracture | 3831 | 3955 | 0 |
2011-04-04 | Multi-Stage Fracture | 3716 | 3831 | 0 |
2011-04-04 | Multi-Stage Fracture | 3602 | 3716 | 0 |
2011-04-04 | Multi-Stage Fracture | 3477 | 3602 | 0 |
2011-04-05 | Multi-Stage Fracture | 3362 | 3477 | 0 |
2011-04-05 | Multi-Stage Fracture | 3321 | 3362 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 150 | 238.8 | 0.0 | 7.8 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-07-16 | No Incident | N/A | N/A |
For data sources see[6]