If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20997 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.829483,"lon":-75.714536,"icon":""}]} |
County: Susquehanna | |
Municipality: New Milford Township | |
Operator Name: SOUTHWESTERN ENERGY PROD CO | |
Well Pad ID: | |
Farm/Lease Name: RACINE 3H | |
First Permit Date: 2012-09-28 | |
Last Permit Date: 2012-09-28 | |
Spud Date: | |
Unconventional: Yes | |
Configuration: Horizontal | |
Well Status: | |
Violations: 0 | |
Latitude: 41.829483 | |
Longitude: -75.714536 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
2198321 | 2013-07-12 | No Violations Noted | On 7/12/2013, Ryan Klemish conducted an inspection of this location. Crews were finishing up the final application of stone to the access road and pad. Perimeter BMPs have been installed and appear to be functioning as intended. The following BMPs were observed; Culverts, Wood Chip FIlter Berms, Rock Construction Entrance, Slope Stabilization, Drainage Swales/Road Side Ditches, Stabilized access road and well pad and Temporary stabilization.
This shall serve as the pre-operations inspection as required by section 3258 of the oil and gas act of 2012(Act 13). No violations noted at this time. |
|||
2236214 | 2014-01-14 | No Violations Noted |
For data sources see[1]