{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.547372,"lon":-80.111608,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Ohio Township | |
Operator Name: AMER NATURAL RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: GROVE/GRAMBO UNIT 1 | |
License Status: Active | |
Spud Date: 05/20/2011 | |
Permit Date: 3/14/2011 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 40.547372 | |
Longitude: -80.111608 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | 0.00 | 0.00 | 0.00 | ||||
2012 | 0.00 | 0.00 | 0.00 | ||||
2013 | 0.00 | 0.00 | 0.00 | ||||
2014 | 0.00 | 0.00 | 0.00 | ||||
2015 | 0.00 | 0.00 | 0.00 | ||||
2016 | 0.00 | 0.00 | 0.00 | ||||
2017 | 0.00 | 0.00 | 0.00 | ||||
2018 | 0.00 | 0.00 | 0.00 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2011-0 | Drilling Fluid Waste (in Barrels) | 420.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011-0 | Fracing Fluid Waste (in Barrels) | 577.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011-0 | Produced Fluid (in Barrels) | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012-0 | Drilling Fluid Waste (in Barrels) | 55.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1961885 | Primary Facility | 03/24/2011 | Routine/Complete Inspection | No Violations Noted | On March 24th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. Pit was constructed. The culverts outlets needed riprapped and some corrections were needed to the silt fence installation. The operator was contacted. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1976571 | Primary Facility | 04/25/2011 | Drilling/Alteration | No Violations Noted | DRILLING PAD IS VERY SMALL. PIT IS ALSO SMALL. |
1983149 | Primary Facility | 05/27/2011 | Drilling/Alteration | No Violations Noted | RUNNING DRILL RODS AFTER 7" CEMENT TIME. |
1983151 | Primary Facility | 05/25/2011 | Drilling/Alteration | No Violations Noted | USE 5 DRILLING AT 660'. |
1984287 | Primary Facility | 05/26/2011 | Routine/Complete Inspection | No Violations Noted | On May 26th, 2011 I conducted a routine inspection of the above site. Drilling has started. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit apeared to be in good condition. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1984523 | Primary Facility | 06/01/2011 | Routine/Complete Inspection | No Violations Noted | On June 1st, 2011 I conducted a routine inspection of the above site. Drilling was completed. Equipment had moved offsite. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit apeared to be in good condition and was filled mainly with cuttings.. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1993768 | Primary Facility | 07/21/2011 | Drilling/Alteration | No Violations Noted | NO ACTIVITY AT THIS SITE SINCE MAY 2011. PITS ARE OPEN. |
2022421 | Primary Facility | 11/18/2011 | Routine/Complete Inspection | No Violations Noted | Checked unit. Some E&S issues. |
2028130 | Primary Facility | 12/08/2011 | Routine/Complete Inspection | No Violations Noted | A crew from American Natural Resources was beginning to work on the site at inspection so that limited what I could look at. I did remind the crew that the entrance to the access road did require additional rock. |
2051764 | Primary Facility | 03/20/2012 | Administrative/File Review | No Violations Noted | On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Grove/Grambo Unit #1. The well reached total depth on 5/31/11 and restoration should have been done by 2/31/12. |
2052603 | Primary Facility | 02/15/2012 | Drilling/Alteration | No Violations Noted | ACCESS HAS NEW STONE. PUMP JACK IS SET, AND STORAGE TANKS ARE IN PLACE. |
2143114 | Primary Facility | 02/11/2013 | Routine/Complete Inspection | No Violations Noted | WELL COMPLETE AND JACK HOOKED UP. SITE IS OK. |
2247417 | Primary Facility | 01/22/2014 | Routine/Complete Inspection | No Violations Noted | WELL WAS DRILLED BUT NOT PRODUCED. ANR PLANS TO PLUG. |
2727981 | Primary Facility | 2018-05-04 | Routine/Complete Inspection | Violation(s) Noted | Well drilled. Well tag present. No accelerated erosion or sedimentation observed in relation the well site or access road. Brine tanks located on site not appear to be equipped for storage. The brine tanks appear to be in sound condition and placed in an earthen berm. The Department recommends the Operator remove the brine tanks. The Department also observed temporary E&S BMP silt sox installed. The Department nots that the site appears to be restored. The Department recommends the a Operator removed the silt sox. |
2742779 | Primary Facility | 2018-06-19 | Compliance Evaluation | No Violations Noted | Compliance evaluation inspection related to violations issued on 5/4/2018, see inspection 2727981. The well appears to be drilled and equipped for production. The temporary E&S silt fence has been removed. No observation of accelerated erosion or sedimentation. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2727981 | 816158 | 2018-05-04 | 2018-06-19 | 102.11(a)1 | Environmental Health & Safety | Failure to removed temporary E&S BMPs |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
816158 | 364468 | NOV - Notice of Violation |