X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-003-22190

Well Details

Well ID: 37-003-22190
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Harmar Township
Operator Name: MARCO DRILLING INC
Well Pad ID:
Farm/Lease Name: ERNEST B MARKITELL 1-5
License Status: Plugged OG Well
Spud Date: 01/01/1800
Permit Date: 6/23/2011
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.560819
Longitude: -79.851308

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 0.00 0.00 0.00

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1985349 Primary Facility 06/09/2011 Routine/Complete Inspection No Violations Noted On June 9th, 2011 I conducted an inspection for an OG 57 Request for waiver of distance requirement. The well site is proposed to be constructed within 100 ft. from Deer Creek. The proposed well was site located. Construction has not begun at site. Proposed E & S plan should protect stream from adverse impact during site/well development if properly implemented & maintained. If drill cuttings are to be encapsulated the bottom of the pit must be 20¿ above the seasonal high groundwater table and a property owner waiver would be necessary due to the close proximity of the building at the location.
1998293 Primary Facility 08/10/2011 Routine/Complete Inspection No Violations Noted On August 10th, 2011 I conducted a routine inspection of the above site. Drilling had started. The pit appeared to be in good condition. A site ID and E&S plan were posted on site. The access road was in good condition. The location is in the corner of an asphalt parking lot. The conductor was in place. E&S controls were constructed around the perimeter. Some tophole water was on the pad. The operator should continue to inspect the E&S controls routinely.
1998351 Primary Facility 08/10/2011 Drilling/Alteration No Violations Noted DALLAS MORRIS RIG SET UP IN A PARKING LOT.
1998352 Primary Facility 08/11/2011 Drilling/Alteration No Violations Noted DRILLER HIT A LARGE AMOUNT OF WATER AT 172'. THE WATER STREAM WAS ARTESEAN AND WAS PUMPED INTO A FIELD AND RUN THROUGH FILTER SOCKS. WHEN THE WATER BECAME TO MUCH TO CONTAIN THE DECISION WAS MADE TO PLUG THE WELL. THE WELL WAS CEMENTED TO THE SURFACE.
1998434 Primary Facility 08/11/2011 Routine/Complete Inspection Violation(s) Noted On August 11th, 2011 I conducted an inspection of the above site in response to notification of a tophole water release. Drilling was underway. During the night, tophole water coming from the well had overwhelmed the E&S controls and was unable to be contained in the pit. Water was flowing out of the well, across the ground, through the E&S controls and into Deer Creek, classified as a CWF. The operator contacted DEP when the discharge began, approximately 1:00 am. Diligent efforts were made to stop or decrease the amount of water reaching the stream. Water was being collected in a pit and frac tank. Additional E&S controls were installed (haybales). Excess water from the pit was being discharged through the use of pumps and filter bags into a well vegetated area adjacent to the site. There was no discharge into the stream at the time of my inspection at 13:00
2001792 Primary Facility 08/24/2011 Drilling/Alteration No Violations Noted DRILLING AT 1755'.
2001796 Primary Facility 08/24/2011 Drilling/Alteration No Violations Noted WELL WAS PLUGGED AFTER A LARGE AMOUNT OF MINE WATER WAS HIT AT 172'.
2002571 Primary Facility 08/18/2011 Compliance Evaluation No Violations Noted On August 18th, 2011 I conducted an inspection of the above site as a follow up to the tophole water release on 8/11/11. Drilling had been halted. The well had been plugged. The rig was moved offsite. E&S controls were adequate. The pit was still open and contained some fluids. The access was ok, a site ID and E&S plan were still posted on site.
2076980 Primary Facility 06/18/2012 Administrative/File Review Viol(s) Noted & Immediately Corrected

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1998434 618673 08/11/2011 08/25/2011 78.60B - Tophole water discharged improperly Administrative
2076980 642108 06/18/2012 06/18/2012 210C - Failure to provide 3 working days notice prior to plugging a non-coal well Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
618673 274236 NOV - Notice of Violation Superseded 09/19/2012
618673 288720 CACP - Consent Assessment of Civil Penalty Comply/Closed 09/19/2012 09/19/2012 $3,600.00 $3,600.00
642108 285130 CACP - Consent Assessment of Civil Penalty Comply/Closed 06/18/2012 06/18/2012 $500.00 $500.00

For data sources see[5]

References