X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-003-22222

Well Details

Well ID: 37-003-22222
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Frazer Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 149247
Farm/Lease Name: SCHILLER GERALD UNIT 1H
License Status: Active
Spud Date: 07/01/2012
Permit Date: 5/4/2012
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.616081
Longitude: -79.786542

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 RANGE RESOURCES APPALACHIA LLC 1,170,948.18 286 0.00 0 0.00 0
2014 RANGE RESOURCES APPALACHIA LLC 728,696.60 359 0.00 0 0.00 0
2015 RANGE RESOURCES APPALACHIA LLC 513,895.32 365 0.00 0 0.00 0
2016 RANGE RESOURCES APPALACHIA LLC 385,780.57 360 0.00 0 0.00 0
2017 RANGE RESOURCES APPALACHIA LLC 274,558.90 356 0.00 0 0.00 0
2018 RANGE RESOURCES APPALACHIA LLC 247,185.98 291 0.00 0 0.00 0
2019 RANGE RESOURCES APPALACHIA LLC 55,832.21 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-2 Drill Cuttings (in Tons) 122.31 Tons LANDFILL 100172
2012-2 Drill Cuttings (in Tons) 205.43 Tons LANDFILL 100280
2012-2 Drill Cuttings (in Tons) 669.43 Tons LANDFILL 100434
2012-2 Drilling Fluid Waste (in Barrels) 425.05 Bbl REUSE OTHER THAN ROAD SPREADING
2013-1 Drilling Fluid Waste (in Barrels) 23.81 Bbl REUSE OTHER THAN ROAD SPREADING
2013-1 Fracing Fluid Waste (in Barrels) 9,194.95 Bbl REUSE OTHER THAN ROAD SPREADING
2013-1 Fracturing Fluid Waste (in Tons) 11.18 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2013-1 Produced Fluid (in Barrels) 5,082.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-2 Produced Fluid (in Barrels) 3,676.57 Bbl REUSE OTHER THAN ROAD SPREADING
2014-1 Fracturing Fluid Waste (in Tons) 1.18 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2014-1 Produced Fluid (in Barrels) 317.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2014-1 Produced Fluid (in Barrels) 1,398.43 Bbl REUSE OTHER THAN ROAD SPREADING
2014-2 Fracing Fluid Waste (in Barrels) 6.43 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2014-2 Produced Fluid (in Barrels) 136.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2014-2 Produced Fluid (in Barrels) 952.31 Bbl REUSE OTHER THAN ROAD SPREADING
2015-1 Produced Fluid (in Barrels) 525.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2015-1 Produced Fluid (in Barrels) 566.21 Bbl REUSE OTHER THAN ROAD SPREADING
2015-2 Produced Fluid (in Barrels) 332.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2015-2 Produced Fluid (in Barrels) 22.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2015-2 Produced Fluid (in Barrels) 555.76 Bbl REUSE OTHER THAN ROAD SPREADING
2016-1 Produced Fluid (in Barrels) RWC 802 51.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-1 Produced Fluid (in Barrels) RWC 802 541.80 Bbl REUSE OTHER THAN ROAD SPREADING
2016-2 Produced Fluid (in Barrels) RWC 802 204.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-2 Produced Fluid (in Barrels) RWC 802 46.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016-2 Produced Fluid (in Barrels) RWC 802 390.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017-01 Other Oil & Gas Wastes (in Barrels) RWC 899 7.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-01 Produced Fluid (in Barrels) RWC 802 41.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-01 Produced Fluid (in Barrels) RWC 802 24.00 Bbl REUSE (AT WELL PAD)
2017-02 Produced Fluid (in Barrels) RWC 802 24.91 Bbl REUSE (AT WELL PAD)
2017-03 Other Oil & Gas Wastes (in Barrels) RWC 899 22.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-03 Produced Fluid (in Barrels) RWC 802 23.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-03 Produced Fluid (in Barrels) RWC 802 23.15 Bbl REUSE (AT WELL PAD)
2017-04 Other Oil & Gas Wastes (in Barrels) RWC 899 12.40 Bbl REUSE (AT WELL PAD)
2017-04 Produced Fluid (in Barrels) RWC 802 23.78 Bbl REUSE (AT WELL PAD)
2017-05 Other Oil & Gas Wastes (in Barrels) RWC 899 7.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-05 Produced Fluid (in Barrels) RWC 802 22.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-05 Produced Fluid (in Barrels) RWC 802 22.21 Bbl REUSE (AT WELL PAD)
2017-06 Other Oil & Gas Wastes (in Barrels) RWC 899 22.00 Bbl REUSE (AT WELL PAD)
2017-06 Produced Fluid (in Barrels) RWC 802 14.70 Bbl REUSE (AT WELL PAD)
2017-07 Other Oil & Gas Wastes (in Barrels) RWC 899 8.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017-07 Produced Fluid (in Barrels) RWC 802 15.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017-07 Produced Fluid (in Barrels) RWC 802 24.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-07 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017-08 Other Oil & Gas Wastes (in Barrels) RWC 899 5.80 Bbl REUSE (AT WELL PAD)
2017-08 Produced Fluid (in Barrels) RWC 802 16.67 Bbl REUSE (AT WELL PAD)
2017-09 Produced Fluid (in Barrels) RWC 802 45.19 Bbl REUSE (AT WELL PAD)
2017-10 Produced Fluid (in Barrels) RWC 802 22.48 Bbl REUSE (AT WELL PAD)
2017-11 Other Oil & Gas Wastes (in Barrels) RWC 899 10.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-11 Other Oil & Gas Wastes (in Barrels) RWC 899 15.36 Bbl REUSE (AT WELL PAD)
2017-11 Produced Fluid (in Barrels) RWC 802 37.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-11 Produced Fluid (in Barrels) RWC 802 35.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-11 Produced Fluid (in Barrels) RWC 802 6.75 Bbl REUSE (AT WELL PAD)
2017-12 Produced Fluid (in Barrels) RWC 802 23.38 Bbl REUSE (AT WELL PAD)
2018-01 Other Oil & Gas Wastes (in Barrels) RWC 899 12.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-01 Produced Fluid (in Barrels) RWC 802 22.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-01 Produced Fluid (in Barrels) RWC 802 66.06 Bbl REUSE (AT WELL PAD)
2018-02 Other Oil & Gas Wastes (in Barrels) RWC 899 20.00 Bbl REUSE (AT WELL PAD)
2018-02 Produced Fluid (in Barrels) RWC 802 4.29 Bbl REUSE (AT WELL PAD)
2018-03 Other Oil & Gas Wastes (in Barrels) RWC 899 7.57 Bbl REUSE (AT WELL PAD)
2018-03 Produced Fluid (in Barrels) RWC 802 14.43 Bbl REUSE (AT WELL PAD)
2018-04 Other Oil & Gas Wastes (in Barrels) RWC 899 7.01 Bbl REUSE (AT WELL PAD)
2018-04 Produced Fluid (in Barrels) RWC 802 14.70 Bbl REUSE (AT WELL PAD)
2018-05 Other Oil & Gas Wastes (in Barrels) RWC 899 3.57 Bbl REUSE (AT WELL PAD)
2018-05 Produced Fluid (in Barrels) RWC 802 42.25 Bbl REUSE (AT WELL PAD)
2018-06 Other Oil & Gas Wastes (in Barrels) RWC 899 0.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-06 Other Oil & Gas Wastes (in Barrels) RWC 899 33.73 Bbl REUSE (AT WELL PAD)
2018-06 Produced Fluid (in Barrels) RWC 802 22.00 Bbl REUSE (AT WELL PAD)
2018-07 Other Oil & Gas Wastes (in Barrels) RWC 899 6.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-07 Other Oil & Gas Wastes (in Barrels) RWC 899 7.62 Bbl REUSE (AT WELL PAD)
2018-07 Produced Fluid (in Barrels) RWC 802 39.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-07 Produced Fluid (in Barrels) RWC 802 38.38 Bbl REUSE (AT WELL PAD)
2018-08 Produced Fluid (in Barrels) RWC 802 49.38 Bbl REUSE (AT WELL PAD)
2018-09 Other Oil & Gas Wastes (in Barrels) RWC 899 22.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-09 Other Oil & Gas Wastes (in Barrels) RWC 899 27.67 Bbl REUSE (AT WELL PAD)
2018-09 Produced Fluid (in Barrels) RWC 802 16.33 Bbl REUSE (AT WELL PAD)
2018-10 Produced Fluid (in Barrels) RWC 802 15.80 Bbl REUSE (AT WELL PAD)
2018-11 Other Oil & Gas Wastes (in Barrels) RWC 899 37.06 Bbl REUSE (AT WELL PAD)
2018-11 Produced Fluid (in Barrels) RWC 802 42.84 Bbl REUSE (AT WELL PAD)
2018-12 Other Oil & Gas Wastes (in Barrels) RWC 899 7.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-12 Other Oil & Gas Wastes (in Barrels) RWC 899 5.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW030
2018-12 Other Oil & Gas Wastes (in Barrels) RWC 899 5.03 Bbl REUSE (AT WELL PAD)
2018-12 Produced Fluid (in Barrels) RWC 802 22.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-12 Produced Fluid (in Barrels) RWC 802 16.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW030
2018-12 Produced Fluid (in Barrels) RWC 802 29.39 Bbl REUSE (AT WELL PAD)
2019-01 Produced Fluid (in Barrels) RWC 802 42.71 Bbl REUSE (AT WELL PAD)
2019-02 Other Oil & Gas Wastes (in Barrels) RWC 899 4.90 Bbl REUSE (AT WELL PAD)
2019-02 Produced Fluid (in Barrels) RWC 802 21.88 Bbl REUSE (AT WELL PAD)
2019-03 Other Oil & Gas Wastes (in Barrels) RWC 899 8.00 Bbl REUSE (AT WELL PAD)
2019-03 Produced Fluid (in Barrels) RWC 802 42.26 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2074460 Primary Facility 05/31/2012 Drilling/Alteration No Violations Noted THE SITE FOR THIS WELL IS UNDER CONSTRUCTION. E&S CONTROLS ARE IN PLACE.
2075945 Primary Facility 06/14/2012 Routine/Complete Inspection No Violations Noted John Ley, Water Quality Specialist, SWRO was on site to conduct an inspection. the site sign was in place and showed the proper permitting information. the E&S controls and BMP's were in place and constructed according to plan. The access road berms and soil stock pile had been stabilized. The pad was still under construction. The only issue was that the ICT drainage ditches at the bottom of the site slopes were filling up with soil boulders that had rolled down the slope as the pad was being constructed. These runoff ditches should be cleared.
2078633 Primary Facility 06/25/2012 Routine/Complete Inspection No Violations Noted John Ley, Water Quality Specialist, SWRO was on site to conduct a pre-operational inspection. The site sign was in place and showed the proper permitting information. The E&S controls and BMP's were in place and constructed according to plan. The access road berms had been stabilized. Additional work was taking place on the soil pile. The pad was still under construction.
2085898 Primary Facility 07/12/2012 Drilling/Alteration No Violations Noted TRIPPING IN HOLE TO RESUME DRILLING @ 1671'.
2085912 Primary Facility 07/19/2012 Drilling/Alteration No Violations Noted TOP HOLE COMPLETE AT 6793'.
2085940 Primary Facility 07/06/2012 Drilling/Alteration No Violations Noted CREW PREPARING TO CEMENT MINE STRING.
2096727 Primary Facility 08/28/2012 Drilling/Alteration No Violations Noted TOP HOLE IS COMPLETE AND A KOP HAS BEEN SET.
2097427 Primary Facility 08/31/2012 Drilling/Alteration No Violations Noted LARGE ABOVE GROUND TANKS ARE BEING BUILT TO HOLD FRAC WATER. SITE IS IN GOOD CONDITION.
2097726 Primary Facility 09/05/2012 Routine/Complete Inspection No Violations Noted John Ley, WQS, SWRO was on site to conduct a routine inspection. At the time of the inspection, the well sign, E&S plan, and well permit were on site. BMP's installed were functioning according to the E&S plan. Hillsides were temporarily stabilized and had good growth on them. No accelerated erosion or sedimentation issues were observed on site or on the gated access road. Silt sock in the lower field will be removed to allow for mowing of the field.
2106808 Primary Facility 10/10/2012 Drilling/Alteration No Violations Noted TOP HOLE IS COMPLETE. THE PAD IS BEING USED FOR FRESH WATER STORAGE.
2116890 Primary Facility 11/06/2012 Drilling/Alteration No Violations Noted PAD GETTING PREP FOR BOTTOM HOLE RIG.
2124773 Primary Facility 12/04/2012 Drilling/Alteration No Violations Noted TOP HOLE TD AT 6,793'. THE SITE IS IN GOOD CONDITION.
2130149 Primary Facility 01/10/2013 Routine/Complete Inspection No Violations Noted John Ley WQS, SWRO was on site to conduct a routine inspection. At the time of this inspection, the well sign, E&S plan, and the PPC plan were onsite. The site was gated for security. The wells were drilled and equipment had been removed. The ground around the site was snow covered but there did not appear to be any accelerated erosion or sedimentation issues.
2131212 Primary Facility 01/08/2013 Drilling/Alteration No Violations Noted BOTTOM HOLE DRILLING COMPLETE. WELL NOT FRACED. RIG IS GONE.
2143082 Primary Facility 02/25/2013 Drilling/Alteration No Violations Noted DRILLING COMPLETE AND READY TO FRAC.SITE IS GOOD
2146658 Primary Facility 03/06/2013 Drilling/Alteration No Violations Noted ALL FIVE WELLS ON THIS PAD ARE BEING FRACED.
2156464 Primary Facility 04/02/2013 Drilling/Alteration No Violations Noted THIS WELL IS BEING SET UP FOR FLOWBACK. THE SITE IS OK.
2165006 Primary Facility 04/18/2013 Drilling/Alteration No Violations Noted WELL IS FRACED. EQUIPTMENT SET FOR PRODUCTION. SITE IS OK.
2172750 Primary Facility 05/30/2013 Drilling/Alteration No Violations Noted WELL IS PRODUCING. EQUIPTMENT IS IN GOOD CONDITION.
2173329 Primary Facility 05/20/2013 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0003 Schiller 1-6H Well Site, Site 759251 (inspection record 2173310). Temporary stabilization appeared adequate. No erosion or sedimentation issues were apparent. Production fluids were contained and no leaks to the environment were evident.
2195558 Primary Facility 08/13/2013 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0003 Schiller 1-6H Well Site, Site 759251 (inspection record 2195548). Temporary stabilization appeared adequate. No erosion or sedimentation issues were apparent. Production fluids were contained and no leaks to the environment were evident. Site restoration extension has been granted until September 28, 2015.
2231268 Primary Facility 12/19/2013 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0003 Schiller 1-6H Well Site, Site 759251 (inspection record 2231267). Site was snow covered at time of inspection. No erosion or sedimentation issues were apparent. Production fluids were contained; no leaks to the environment were evident. Site restoration extension was previously granted an extension until September 28, 2015.
2255699 Primary Facility 03/10/2014 Drilling/Alteration No Violations Noted WELL IS HOOKED UP AND PRODUCING. PAD AND EQUIPTMENT IS WELL MAINTAINED.
2287597 Primary Facility 06/25/2014 Drilling/Alteration No Violations Noted THE WELL WAS PREPARED TO RUN TUBING IN, BUT THE RIG WAS DELAYED.
2289161 Primary Facility 07/10/2014 Drilling/Alteration No Violations Noted THERE IS TUBING STACKED ON RACKS TO RUN INTO THE WELL.
2310014 Primary Facility 10/03/2014 Routine/Complete Inspection No Violations Noted This site's restoration date was previously extended to September 28, 2015. No E&S issues were noted. No leaks to the environment were evident. Concurrently inspected site and its associated wells.
2395481 Primary Facility 07/28/2015 Complaint Inspection No Violations Noted On 7/28/15 water samples were taken from basement tap for 946 analyses in response to complaint 313700.
2401524 Primary Facility 08/07/2015 Routine/Complete Inspection No Violations Noted On 8/7/15, I inspected the Schiller site as a routine inspection and made the following observations:
2419273 Primary Facility 10/23/2015 Administrative/File Review No Violations Noted Administrative review of lab results on 10/23/15 indicates that water supply does not appear to have been impacted by oil & gas activity. Results and documentation forwarded for final determination
2483946 Primary Facility 2016-05-10 Routine/Complete Inspection No Violations Noted THIS GAS WELL AND IT'S PRODUCTION EQUIPTMENT HAVE BEEN WELL MAINTAINED.

THE SITE IS IN GOOD CONDITION.

2657151 Primary Facility 2017-11-06 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus appears to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road.
2691319 Primary Facility 2018-02-06 Routine/Complete Inspection No Violations Noted Act 9 site identification sign installed. Well drilled and equipped for production. Well tag present. Well apparatus,brine tanks and gas production unit appears to be in sound condition.
2729077 Primary Facility 2018-05-11 Routine/Complete Inspection No Violations Noted Multi-well pad. At time of inspection, all five wells on this pad are drilled and appear equipped for production.

Manned security booth on-site.

The ESCGP for this site was terminated on 2/6/2018.

2758450 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted This well and equipment are in good condition.

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/23/2013 03/03/2013 6702 4,816,640.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 37% HCL FracTech Cleans Perforation HCL 7647-01-0 37 0.02575 0
MC B-8520 Multichem Antibacterial Agent 3,4,4-Trimethyloxazolodine 75673-43-7 5 0.00091 0
Formaldehyde Amine 56652-26-7 0.5 0.00009000 0
4,4-Dimethyloxazolidine 51200-87-4 78 0.01418 0
2-Amino-2-methyl-1-propanol 124-68-5 1 0.00018 0
CI-100 FracTech Corrosion Inhibitor Methanol 67-56-1 95 0.00054 0
Propargyl Alcohol 107-19-7 5 0.00003000 0
MC B-8650 Multichem Antibacterial Agent Methanol 67-56-1 0.5 0.00004000 0
Glutaraldehyde 111-30-8 50 0.00398 0

For data sources see[7]

References