X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-29428

Well Details

Well ID: 37-005-29428
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: North Buffalo Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID: 146708
Farm/Lease Name: MICHAEL J LORD ETUX 1-5
License Status: Active
Spud Date: 08/15/2007
Permit Date: 8/10/2007
Unconventional Well: Y
Configuration: Vertical Well
Latitude: 40.774114
Longitude: -79.568856

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 0.00 0.00 0.00
2010 MDS ENERGY LTD 0.00 0 0.00 0 0.00 0
2011 MDS ENERGY LTD 37,032.00 194 0.00 0 0.00 0
2012 MDS ENERGY LTD 39,038.00 360 0.00 0 0.00 0
2013 MDS ENERGY LTD 24,798.00 338 0.00 0 0.00 0
2014 MDS ENERGY LTD 21,836.00 345 0.00 0 0.00 0
2015 MDS ENERGY LTD 16,585.00 356 0.00 0 0.00 0
2016 MDS ENERGY DEV LLC 14,516.00 323 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 17,354.00 356 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 15,800.00 348 0.00 0 0.00 0
2019 MDS ENERGY DEV LLC 2,993.00 89 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
15OCTU Produced Fluid (in Barrels) 105.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2011-1 Fracing Fluid Waste (in Barrels) 3,015.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011-1 Produced Fluid (in Barrels) 305.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 2403
2011-2 Produced Fluid (in Barrels) 95.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2011-2 Produced Fluid (in Barrels) 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012-1 Produced Fluid (in Barrels) 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2012-2 Produced Fluid (in Barrels) 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2013-1 Produced Fluid (in Barrels) 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2013-2 Produced Fluid (in Barrels) 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW006
2015-10 Produced Fluid (in Barrels) 105.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1648252 Primary Facility 08/22/2007 Drilling/Alteration No Violations Noted WELL SPUDDED 8/15/07. PIT LINED, FREEBOARD OK, E&S OK.
1949807 Primary Facility 02/02/2011 Routine/Complete Inspection No Violations Noted This is a Drill Deeper.
1950772 Primary Facility 02/15/2011 Drilling/Alteration No Violations Noted Rig moved off location.
2008547 Primary Facility 10/04/2011 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2009569 Primary Facility 10/06/2011 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been regraded, and the vegetation had begun to grow. There were sever areas noted where it appeared seepage that had a sheen attributable to iron bacteria was preventing vegetation from beginning to grow. Spoke with operator representative Randy Morris via phone while onsite and he stated that he will evaluate these areas and take whatever action to alleviate the problem and allow the vegetation to begin to take hold.
2069986 Primary Facility 05/22/2012 Site Restoration No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus and brine tanks located onsite appear to be in sound working condition. The site had recently been seeded and mulch but does not meet the minimum vegetative standard at the time of inspection. The Department recommends that the Operator continue to monitor the site to ensure 70% uniform vegetative coverage criteria is met. No accelerated erosion and sedimentation observed is relation to the well pad area or the access road.
2178226 Primary Facility 06/26/2013 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and it appeared to be in sound condition. Well-site ahd been appropriately restored and the was no evidence observed of accelerated erosion or sedimentation in relation to the site or access road.
2393690 Primary Facility 07/29/2015 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. There was no observed accelrated erosion or sedimentation in relation to the site or access road. Brine tanks located onsite and they appeared to be in sound condition.
2623606 Primary Facility 2017-08-09 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the access road.

For data sources see[6]

References