37-005-30447

Well Details

Well ID: 37-005-30447
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Bend Township
Operator Name: DAKOTA OIL & GAS CO
Well Pad ID:
Farm/Lease Name: G TOY 1
License Status: Active
Spud Date: 09/21/2010
Permit Date: 12/15/2009
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.625345
Longitude: -79.362336

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 0.00 0.00 0.00
2010 0.00 0.00 0.00
2011 PENNECO OIL CO INC 4,332.00 334 0.00 0.00
2012 PENNECO OIL CO INC 3,504.00 366 0.00 0.00
2013 PENNECO OIL CO INC 2,254.00 365 0.00 0.00
2014 PENNECO OIL CO INC 1,473.00 365 0.00 0.00
2015 DAKOTA OIL & GAS CO 1,446.95 365 0.00 0.00
2016 DAKOTA OIL & GAS CO 1,616.91 366 0.00 0.00
2017 DAKOTA OIL & GAS CO 1,144.00 365 0.00 0.00
2018 DAKOTA OIL & GAS CO 1,240.64 365 0.00 0.00

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-0 Drilling Fluid Waste (in Barrels) 1,310.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011-0 Produced Fluid (in Barrels) 15.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2012-0 Produced Fluid (in Barrels) 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2014-0 Produced Fluid (in Barrels) 25.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2016-0 Produced Fluid (in Barrels) RWC 802 40.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1847093 Primary Facility 11/16/2009 Routine/Complete Inspection No Violations Noted Site inspection and E&S plan review found issues with the utilization of encaspulation and below grade drill pits and the depth to the seasonal high groundwater table. A revised E&S plan was submitted addressing those issues through land farming and elevated drill pits, and additional contingency options should during site construction it be discovered that landfarming and or pits will not be able to be utilized, steel tanks will be utilized and the cuttings will be hauled to a landfill. The remainder of the E&S plan, as compiled, should effectively minimize accelerated erosion & sedimentation, provided the plan is implemented and maintained properly.
1918551 Primary Facility 09/24/2010 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan. Silt fencing and haybales required replacement. Spoke with operator representative Robert Carnahan onsite and silt sox will be installed on 09/27/10. No accelerated erosion & sedimentation was observed in relation to the well-site or access road. Below grade pit onsite and it had more than the required two feet of lined freeboard. Operator should endeavor to reclaim the site and close the pit upon completion of drilling and any stimulation activities and implement BMP's as necessary to insure erosion & sedimentation is minimized through the fall and winter months.
1918553 Primary Facility 10/07/2010 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed at the time of the inspection. Silt fencing has been replaced with silt sox for erosion control. No accelerated erosion & sedimentation was observed in relation to the access road or well-site. Below grade drill pit located onsite and it had more than the required two feet of lined freeboard.
1920400 Primary Facility 09/24/2010 Drilling/Alteration No Violations Noted drilling - 798ft/E&S ok/ID&pit ok
1961082 Primary Facility 03/25/2011 Routine/Complete Inspection No Violations Noted Drilling complete/. Well equipped for production.Site graded and mulched. No open pits.
2125186 Primary Facility 12/21/2012 Routine/Complete Inspection No Violations Noted ell appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2440524 Primary Facility 2016-01-13 Routine/Complete Inspection No Violations Noted Well tagged-in production. Annulus open. Well head casing-meter set-100 bbl tank-equipment ok.
2686896 Primary Facility 2018-01-26 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, equipment and grounded 100 bbl fiberglass tank look ok.

For data sources see[6]

References