X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-25598

Well Details

Well ID: 37-059-25598
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Center Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 146848
Farm/Lease Name: GROVE 1V
License Status: Plugged OG Well
Spud Date: 12/08/2010
Permit Date: 11/4/2010
Unconventional Well: Y
Configuration: Vertical Well
Latitude: 39.847261
Longitude: -80.296467

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ALPHA SHALE RES LP 0.00 0 0.00 0 0.00 0
2011 ALPHA SHALE RES LP 0.00 0 0.00 0 0.00 0
2012 ALPHA SHALE RES LP 0.00 0 0.00 0 0.00 0
2013 ALPHA SHALE RES LP 0.00 0 0.00 0 0.00 0
2014 ALPHA SHALE RES LP 0.00 0 0.00 0 0.00 0
2015 ALPHA SHALE RES LP 0.00 0 0.00 0 0.00 0
2016 ALPHA SHALE RES LP 81,197.61 31 0.00 0 0.00 0
2017 ALPHA SHALE RES LP 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-2 Basic Sediment (in Barrels) 85.70 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-2 Drill Cuttings (in Tons) 274.10 Tons LANDFILL
2010-2 Drilling Fluid Waste (in Barrels) 1,487.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-1 Basic Sediment (in Barrels) 226.40 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-1 Drill Cuttings (in Tons) 149.22 Tons LANDFILL 100172
2011-1 Drilling Fluid Waste (in Barrels) 987.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2014-2 Produced Fluid (in Barrels) 110.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014-2 Produced Fluid (in Barrels) 330.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015-1 Produced Fluid (in Barrels) 56.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015-1 Produced Fluid (in Barrels) 301.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-1 Produced Fluid (in Barrels) RWC 802 128.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016-1 Produced Fluid (in Barrels) RWC 802 355.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-2 Other Oil & Gas Wastes (in Barrels) RWC 899 483.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-2 Produced Fluid (in Barrels) RWC 802 90.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017-01 Other Oil & Gas Wastes (in Barrels) RWC 899 37.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-01 Other Oil & Gas Wastes (in Barrels) RWC 899 14.00 Bbl REUSE (AT WELL PAD)
2017-03 Other Oil & Gas Wastes (in Barrels) RWC 899 110.00 Bbl REUSE (AT WELL PAD)
2017-06 Drilling Fluid Waste (in Tons) RWC 803 10.68 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017-08 Drilling Fluid Waste (in Tons) RWC 803 71.51 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017-08 Other Oil & Gas Wastes (in Barrels) RWC 899 409.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-08 Other Oil & Gas Wastes (in Barrels) RWC 899 55.00 Bbl REUSE (AT WELL PAD)
2017-08 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 0.35 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017-10 Drilling Fluid Waste (in Tons) RWC 803 12.62 Tons LANDFILL 06-08438
2017-10 Drilling Fluid Waste (in Tons) RWC 803 60.44 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2017-11 Drilling Fluid Waste (in Tons) RWC 803 211.81 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2017-11 Produced Fluid (in Barrels) RWC 802 545.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-11 Produced Fluid (in Barrels) RWC 802 110.00 Bbl REUSE (AT WELL PAD)
2017-11 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 55.27 Tons RESIDUAL WASTE PROCESSING FACILITY
2017-11 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 56.92 Tons RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2017-12 Drill Cuttings (in Tons) RWC 810 114.31 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017-12 Produced Fluid (in Barrels) RWC 802 50.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-12 Produced Fluid (in Barrels) RWC 802 100.00 Bbl REUSE (AT WELL PAD)
2018-01 Other Oil & Gas Wastes (in Barrels) RWC 899 50.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1962070 Primary Facility 12/21/2010 Routine/Complete Inspection No Violations Noted The Department was at the above referenced well to conduct an inspection after being notified of a water spill. Two Operators are currently drilling wells on this pad. Both Rice Energy and Coal Gas Recovery are drilling wells on this pad. The Department observed drilling water spilled across the pad during the inspection. The water did not get off site. The soapy water did reach the sediment trap. Rice Energy is in charge of the cleanup. Rice will pump out the sediment trap and excavate any impacted soil and take it to the landfill. The Department spoke with both companies on site to discuss the cleanup. The department will conduct a follow-up inspection to insure the cleanup has been successful.
2629466 Primary Facility 2017-08-05 Plugging(Includes Plugged/Mined Through) No Violations Noted Operator milling production casing. 4 ½” production casing has been milled to 486’.
2629467 Primary Facility 2017-06-29 Plugging(Includes Plugged/Mined Through) No Violations Noted Coastal Rig 713 on site. Well has been plugged back to 1,371’. Cement plugs have been set from 8,053’ to 1,371’. Bond log was run on 4 ½” production casing prior to cement plugs being set. Operator preparing to mill 4 ½” casing to 200’ feet below coal seam.
2629468 Primary Facility 2017-06-22 Plugging(Includes Plugged/Mined Through) No Violations Noted Coastal Rig 713 on site. Operator checked total depth. Total Depth 8,053’. Operator circulated borehole.

For data sources see[6]

References