Well ID: 37-005-31316
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Freeport Borough
Operator Name: XTO ENERGY INC
Well Pad ID: 155139
Farm/Lease Name: TRILOGY B 2H
License Status: Active
Spud Date: 09/17/2018
Permit Date: 3/12/2018
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.686847
Longitude: -79.681331

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 XTO ENERGY INC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-10 Drill Cuttings (in Tons) RWC 810 634.70 Tons LANDFILL 100585
2018-10 Drilling Fluid Waste (in Barrels) RWC 803 480.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019-01 Synthetic Liner Materials (in Tons) RWC 806 3.56 Tons LANDFILL 100585
2019-02 Drill Cuttings (in Tons) RWC 810 12.61 Tons LANDFILL 100585
2019-03 Drill Cuttings (in Tons) RWC 810 117.68 Tons LANDFILL 100172
2019-03 Drill Cuttings (in Tons) RWC 810 958.04 Tons LANDFILL 100585

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2778284 Primary Facility 2018-09-21 Drilling/Alteration No Violations Noted This well was spudded to 40' and had 40' of 30" pipe installed and cemented back to surface. All equipment on site looked ok.
2778803 Primary Facility 2018-09-24 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.

On this return date, the well bore hole had been deepened to 68' and the Rig had run 68' of 24" pipe, cemented it to surface and covered the well cellar with a steel plate until the next Rig returns to continue the drilling operation. The well log record and all equipment on site looked ok.

2790011 Primary Facility 2018-10-17 Drilling/Alteration No Violations Noted This well was spudded to 42' and had 42' of 40" pipe installed and cemented back to surface inside an 8'x10' cellar. All equipment on site looked ok.

On this return date, the top hole rig was on site drilling at 1383' at the time of this inspection. All well log information and equipment on site looks ok.

2821634 Primary Facility 2019-01-03 Drilling/Alteration No Violations Noted The top hole portion of this well has been drilled and the well casing is capped off waiting on the finishing rig to arrive. The well head casing and all equipment on site looks ok.
2853390 Primary Facility 2019-03-12 Drilling/Alteration No Violations Noted At the time of inspection, Patterson 579 was drilling 8 3/4" hole in the curve. Once they land the curve, they will switch to a 8 1/2" bit. The BOP was tested on 3/10. Containment appeared to be in good condition, with fuel and mud within double containment.