X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31318

Well Details

Well ID: 37-005-31318
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Freeport Borough
Operator Name: XTO ENERGY INC
Well Pad ID: 155139
Farm/Lease Name: TRILOGY C 4H
License Status: Active
Spud Date: 09/17/2018
Permit Date: 3/12/2018
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.686867
Longitude: -79.681397

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 XTO ENERGY INC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-10 Drill Cuttings (in Tons) RWC 810 14.77 Tons LANDFILL 100434
2018-10 Drill Cuttings (in Tons) RWC 810 206.71 Tons LANDFILL 100585
2018-10 Drilling Fluid Waste (in Barrels) RWC 803 370.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018-11 Drill Cuttings (in Tons) RWC 810 512.38 Tons LANDFILL 100585
2018-11 Drilling Fluid Waste (in Barrels) RWC 803 600.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018-12 Drilling Fluid Waste (in Barrels) RWC 803 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019-01 Synthetic Liner Materials (in Tons) RWC 806 3.56 Tons LANDFILL 100585

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2775897 Primary Facility 2018-09-17 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.
2778793 Primary Facility 2018-09-24 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.

On this return date, the well bore hole had been deepened to 68' and the Rig had run 68' of 24" pipe, cemented it to surface and covered the well cellar with a steel plate until the next Rig returns to continue the drilling operation. The well log record and all equipment on site looked ok.

2800614 Primary Facility 2018-11-08 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.

On this return date, the well bore hole had been deepened to 68' and the Rig had run 68' of 24" pipe, cemented it to surface and covered the well cellar with a steel plate until the next Rig returns to continue the drilling operation. The well log record and all equipment on site looked ok.

On this date the rig had finished their top hole portion of this well and had TD'd at 6278' and was moving equipment off the well. All paperwork and equipment on site looked ok.

2821638 Primary Facility 2019-01-03 Drilling/Alteration No Violations Noted The top hole portion of this well has been drilled and the well casing is capped off waiting on the finishing rig to arrive. The well head casing and all equipment on site looks ok.

For data sources see[6]

References