X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31329

Well Details

Well ID: 37-005-31329
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: SNYDER BROS INC
Well Pad ID: 154284
Farm/Lease Name: NEUMANN 6H
License Status: Active
Spud Date: 07/07/2018
Permit Date: 6/26/2018
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.708864
Longitude: -79.626719

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 SNYDER BROS INC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-09 Drill Cuttings (in Tons) RWC 810 618.43 Tons LANDFILL 100585
2018-10 Produced Fluid (in Barrels) RWC 802 100.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-11 Drilling Fluid Waste (in Barrels) RWC 803 16.88 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-12 Drill Cuttings (in Tons) RWC 810 996.35 Tons LANDFILL 100585
2019-01 Drill Cuttings (in Tons) RWC 810 97.50 Tons LANDFILL 100585
2019-02 Synthetic Liner Materials (in Tons) RWC 806 5.85 Tons LANDFILL 100280

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2749893 Primary Facility 2018-07-09 Routine/Complete Inspection No Violations Noted Inspection conducted in response to electronic spud notification scheduled for 7/7/18 for well 6H.

At time of inspection, auger rig on-site. Wells 1H, 2H, 3H, 4H, 5H, and 6H have been spudded. Wells 7H and 8H to be spudded today.

2750662 Primary Facility 2018-07-11 Drilling/Alteration No Violations Noted This well was spudded on 7/8/2018. The cellar is 6'X6'. The conductor hole was drilled to 41' and has 41' of 30" pipe installed and cemented to surface. The well has been covered with a steel plate for safety until the top hole Rig arrives.
2778666 Primary Facility 2018-09-24 Drilling/Alteration No Violations Noted The Rig was drilling at 5151' at the time of this inspection. All drilling log information and all equipment on site looked ok.
2793617 Primary Facility 2018-10-24 Drilling/Alteration No Violations Noted On this return date, the Patterson Finishing Rig is moving on the well pad and setting up to resume drilling the final lateral leg of this well and the rest of the 8 wells on this pad. The drillers log and permit copies are on site and all equipment looks ok.
2802726 Primary Facility 2018-11-13 Routine/Complete Inspection No Violations Noted Present during inspection is operator rep Rod Bennett.

According to Department records, this well was spud on 7-7-18. At time of inspection drilling actively taking place on well 2H. According to Mr. Bennett, wells 3H and 4H have been drilled and cemented and drilling will begin on well 1H next week. Mr. Bennett also states that operator intends to drill this well (6H), 5H, 7H, and 8H on this pad.

2819366 Primary Facility 2018-12-27 Drilling/Alteration No Violations Noted The finishing rig was drilling down at 15338' at the time of this inspection. Multiple simops were going on and all equipment on site looked ok.

For data sources see[6]

References