If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31329 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.708864,"lon":-79.626719,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: South Buffalo Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 154284 | |
Farm/Lease Name: NEUMANN 6H | |
License Status: Active | |
Spud Date: 07/07/2018 | |
Permit Date: 6/26/2018 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.708864 | |
Longitude: -79.626719 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | SNYDER BROS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2018-09 | Drill Cuttings (in Tons) RWC 810 | 618.43 Tons | LANDFILL | 100585 |
2018-10 | Produced Fluid (in Barrels) RWC 802 | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018-11 | Drilling Fluid Waste (in Barrels) RWC 803 | 16.88 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018-12 | Drill Cuttings (in Tons) RWC 810 | 996.35 Tons | LANDFILL | 100585 |
2019-01 | Drill Cuttings (in Tons) RWC 810 | 97.50 Tons | LANDFILL | 100585 |
2019-02 | Synthetic Liner Materials (in Tons) RWC 806 | 5.85 Tons | LANDFILL | 100280 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2749893 | Primary Facility | 2018-07-09 | Routine/Complete Inspection | No Violations Noted | Inspection conducted in response to electronic spud notification scheduled for 7/7/18 for well 6H.
At time of inspection, auger rig on-site. Wells 1H, 2H, 3H, 4H, 5H, and 6H have been spudded. Wells 7H and 8H to be spudded today. |
2750662 | Primary Facility | 2018-07-11 | Drilling/Alteration | No Violations Noted | This well was spudded on 7/8/2018. The cellar is 6'X6'. The conductor hole was drilled to 41' and has 41' of 30" pipe installed and cemented to surface. The well has been covered with a steel plate for safety until the top hole Rig arrives. |
2778666 | Primary Facility | 2018-09-24 | Drilling/Alteration | No Violations Noted | The Rig was drilling at 5151' at the time of this inspection. All drilling log information and all equipment on site looked ok. |
2793617 | Primary Facility | 2018-10-24 | Drilling/Alteration | No Violations Noted | On this return date, the Patterson Finishing Rig is moving on the well pad and setting up to resume drilling the final lateral leg of this well and the rest of the 8 wells on this pad. The drillers log and permit copies are on site and all equipment looks ok. |
2802726 | Primary Facility | 2018-11-13 | Routine/Complete Inspection | No Violations Noted | Present during inspection is operator rep Rod Bennett.
According to Department records, this well was spud on 7-7-18. At time of inspection drilling actively taking place on well 2H. According to Mr. Bennett, wells 3H and 4H have been drilled and cemented and drilling will begin on well 1H next week. Mr. Bennett also states that operator intends to drill this well (6H), 5H, 7H, and 8H on this pad. |
2819366 | Primary Facility | 2018-12-27 | Drilling/Alteration | No Violations Noted | The finishing rig was drilling down at 15338' at the time of this inspection. Multiple simops were going on and all equipment on site looked ok. |
For data sources see[6]