37-059-26895

Well Details

Well ID: 37-059-26895
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Dunkard Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 152180
Farm/Lease Name: HENDRICKSON 2H
License Status: Regulatory Inactive Status
Spud Date: 06/30/2015
Permit Date: 6/22/2015
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.771808
Longitude: -80.027136

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2015-2 Drill Cuttings (in Tons) 233.21 Tons LANDFILL 100172
2015-2 Drill Cuttings (in Tons) 60.67 Tons LANDFILL 100592
2015-2 Drilling Fluid Waste (in Barrels) 1,145.83 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-2 Produced Fluid (in Barrels) 50.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2393684 Primary Facility 07/07/2015 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Set conductor @ 53' ( KB ) 7/3//2015.
2407571 Primary Facility 08/31/2015 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Drilling on air @ 398' (TD). Try to set cement plugs to seal off F/W zones. After 3rd cement plugs they successfully sealed off the F/W zone. Ran casing and cemented to 91' from surface today (8/29/2015). Ran 70' of 1" PVC pipe and cemented to surface (8/30/2015.
2479108 Primary Facility 2016-04-27 Routine/Complete Inspection No Violations Noted

On 04/27/16 at approximately 0830 hours I conducted a routine complete inspection of the site. The Act 9 sign was in place and all required documents were present in the mail box.

The site overall was well vegetated. One location to the right side of the access road at the pad is recommended to receive additional seeding and mulch (see photos). There were no violations noted at the time of inspection.

2495421 Primary Facility 2016-06-15 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS, Inspection for Inactive Status,well & site looks good.

For data sources see[6]