X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-007-20559

Well Details

Well ID: 37-007-20559
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: Independence Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 154732
Farm/Lease Name: JODIKINOS CAROL 11380 10H
License Status: Active
Spud Date: 10/27/2018
Permit Date: 12/14/2017
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.518158
Longitude: -80.354336

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-11 Drill Cuttings (in Tons) RWC 810 68.07 Tons LANDFILL 06-08438
2018-11 Drill Cuttings (in Tons) RWC 810 74.38 Tons LANDFILL 100172
2018-11 Drill Cuttings (in Tons) RWC 810 44.82 Tons LANDFILL 100620
2018-11 Other Oil & Gas Wastes (in Barrels) RWC 899 260.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW030
2018-11 Other Oil & Gas Wastes (in Barrels) RWC 899 260.00 Bbl REUSE (AT WELL PAD)
2018-12 Drill Cuttings (in Tons) RWC 810 166.33 Tons LANDFILL 100172
2018-12 Drill Cuttings (in Tons) RWC 810 21.62 Tons LANDFILL 100620
2019-01 Drill Cuttings (in Tons) RWC 810 231.40 Tons LANDFILL 06-08438
2019-01 Drill Cuttings (in Tons) RWC 810 427.11 Tons LANDFILL 100172
2019-01 Drill Cuttings (in Tons) RWC 810 357.66 Tons LANDFILL 100620
2019-01 Drilling Fluid Waste (in Barrels) RWC 803 274.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019-01 Drilling Fluid Waste (in Barrels) RWC 803 340.00 Bbl REUSE (AT WELL PAD)
2019-01 Other Oil & Gas Wastes (in Barrels) RWC 899 184.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019-03 Drilling Fluid Waste (in Tons) RWC 803 10.48 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019-03 Synthetic Liner Materials (in Tons) RWC 806 3.13 Tons LANDFILL 100620

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2773498 Primary Facility 2018-09-11 Routine/Complete Inspection No Violations Noted At the time of inspection the well was not not drilled. The site is under construction.
2794432 Primary Facility 2018-10-25 Drilling/Alteration No Violations Noted A Lightning Energy auger rig is on the pad to install conductor casing. The rig is drilling a 30" hole to 40' then setting 26" conductor casing then cementing . The pad is in good condition.
2802045 Primary Facility 2018-11-13 Drilling/Alteration No Violations Noted A Lightning Energy auger rig has drilled a 30" hole and set and cemented 40' of 26" conductor casing.
2810411 Primary Facility 2018-12-05 Drilling/Alteration No Violations Noted Falcon 27 drilled top hole to a depth of 4,350'.
2824773 Primary Facility 2019-01-10 Drilling/Alteration No Violations Noted Pioneer 76 is drilling the bottom section of this well. The rig is drilling at 8,865' with a 8.5" bit.
2830363 Primary Facility 2019-01-23 Drilling/Alteration No Violations Noted Pioneer 76 has installed 17,776' of 5.5" casing. The rig has moved.

For data sources see[6]

References