X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-27400

Well Details

Well ID: 37-059-27400
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Franklin Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 149768
Farm/Lease Name: COSGRAY 3
License Status: Active
Spud Date: 12/30/2017
Permit Date: 8/11/2017
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.903889
Longitude: -80.170067

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2019 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2017-12 Drilling Fluid Waste (in Barrels) RWC 803 16.25 Bbl REUSE (AT WELL PAD)
2018-02 Drill Cuttings (in Tons) RWC 810 172.61 Tons LANDFILL 100172
2018-02 Drill Cuttings (in Tons) RWC 810 455.60 Tons LANDFILL 100419
2018-02 Other Oil & Gas Wastes (in Barrels) RWC 899 45.00 Bbl REUSE (AT WELL PAD)
2018-03 Other Oil & Gas Wastes (in Barrels) RWC 899 17.50 Bbl REUSE (AT WELL PAD)
2018-04 Other Oil & Gas Wastes (in Barrels) RWC 899 13.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-04 Other Oil & Gas Wastes (in Barrels) RWC 899 21.88 Bbl REUSE (AT WELL PAD)
2018-05 Other Oil & Gas Wastes (in Barrels) RWC 899 6.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-05 Other Oil & Gas Wastes (in Barrels) RWC 899 13.75 Bbl REUSE (AT WELL PAD)
2018-06 Other Oil & Gas Wastes (in Barrels) RWC 899 7.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-06 Other Oil & Gas Wastes (in Barrels) RWC 899 6.25 Bbl REUSE (AT WELL PAD)
2018-07 Other Oil & Gas Wastes (in Barrels) RWC 899 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-07 Other Oil & Gas Wastes (in Barrels) RWC 899 13.75 Bbl REUSE (AT WELL PAD)
2018-08 Other Oil & Gas Wastes (in Barrels) RWC 899 31.25 Bbl REUSE (AT WELL PAD)
2018-09 Other Oil & Gas Wastes (in Barrels) RWC 899 36.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-09 Other Oil & Gas Wastes (in Barrels) RWC 899 3.75 Bbl REUSE (AT WELL PAD)
2018-10 Other Oil & Gas Wastes (in Barrels) RWC 899 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-10 Other Oil & Gas Wastes (in Barrels) RWC 899 6.88 Bbl REUSE (AT WELL PAD)
2018-11 Other Oil & Gas Wastes (in Barrels) RWC 899 251.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-11 Other Oil & Gas Wastes (in Barrels) RWC 899 13.75 Bbl REUSE (AT WELL PAD)
2018-12 Other Oil & Gas Wastes (in Barrels) RWC 899 3.13 Bbl REUSE (AT WELL PAD)
2019-01 Other Oil & Gas Wastes (in Barrels) RWC 899 31.25 Bbl REUSE (AT WELL PAD)
2019-02 Other Oil & Gas Wastes (in Barrels) RWC 899 45.00 Bbl REUSE (AT WELL PAD)
2019-03 Other Oil & Gas Wastes (in Barrels) RWC 899 15.00 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2672616 Primary Facility 2017-12-11 Routine/Partial Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed.

A meeting was requested by EQT to discuss adding a berm to the well pad. The intention of the berm is to prevent potential spills from leaving the well pad during drilling. Due to the impact the berm would have on stormwater control, this WQS advised EQT to contact Department environmental engineering staff.

2678575 Primary Facility 2018-01-04 Drilling/Alteration No Violations Noted Setting 26" conductor @ 40' and cementing to surface.Cellar Tech installing cellar @ 8'.
2697031 Primary Facility 2018-02-09 Drilling/Alteration No Violations Noted Setting water protection casing and cementing to- night (2/8/2818).
2697053 Primary Facility 2018-02-10 Drilling/Alteration No Violations Noted Setting Coal - Protection Casing and cementing today.Job went as planned.
2697065 Primary Facility 2018-02-13 Drilling/Alteration No Violations Noted Have set Intermediate Casing and in process of cementing now.

For data sources see[6]

References