X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-20442

Well Details

Well ID: 37-015-20442
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Columbia Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 149490
Farm/Lease Name: VANBLARCOM 03 004 03 R 3H
License Status: Active
Spud Date: 11/18/2009
Permit Date: 9/22/2009
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.857694
Longitude: -76.834294

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 0.00 0.00 0.00
2010 REPSOL OIL & GAS USA LLC 399,172.40 98 0.00 0 0.00 0
2011 REPSOL OIL & GAS USA LLC 876,530.00 354 0.00 0 0.00 0
2012 REPSOL OIL & GAS USA LLC 535,315.20 354 0.00 0 0.00 0
2013 REPSOL OIL & GAS USA LLC 378,843.20 361 0.00 0 0.00 0
2014 REPSOL OIL & GAS USA LLC 278,002.30 358 0.00 0 0.00 0
2015 REPSOL OIL & GAS USA LLC 212,631.80 358 0.00 0 0.00 0
2016 REPSOL OIL & GAS USA LLC 173,415.80 362 0.00 0 0.00 0
2017 REPSOL OIL & GAS USA LLC 125,032.70 365 0.00 0 0.00 0
2018 REPSOL OIL & GAS USA LLC 141,366.60 365 0.00 0 0.00 0
2019 REPSOL OIL & GAS USA LLC 34,445.50 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-2 Drilling Fluid Waste (in Barrels) 266.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010-2 Produced Fluid (in Barrels) 4,996.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011-1 Drill Cuttings (in Tons) 1.00 Tons LANDFILL NY # 02S17
2011-1 Fracing Fluid Waste (in Barrels) 852.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011-1 Produced Fluid (in Barrels) 155.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011-2 Produced Fluid (in Barrels) 613.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011-2 Produced Fluid (in Barrels) 113.19 Bbl REUSE OTHER THAN ROAD SPREADING
2012-1 Produced Fluid (in Barrels) 19.79 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012-1 Produced Fluid (in Barrels) 33.65 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012-1 Produced Fluid (in Barrels) 32.42 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2012-1 Produced Fluid (in Barrels) 17.99 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012-1 Produced Fluid (in Barrels) 1,076.01 Bbl REUSE OTHER THAN ROAD SPREADING
2012-2 Produced Fluid (in Barrels) 17.78 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012-2 Produced Fluid (in Barrels) 101.36 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012-2 Produced Fluid (in Barrels) 85.36 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2012-2 Produced Fluid (in Barrels) 72.91 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012-2 Produced Fluid (in Barrels) 17.78 Bbl INJECTION DISPOSAL WELL 34-133-20114
2012-2 Produced Fluid (in Barrels) 71.13 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012-2 Produced Fluid (in Barrels) 275.46 Bbl REUSE OTHER THAN ROAD SPREADING
2013-1 Produced Fluid (in Barrels) 50.64 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013-1 Produced Fluid (in Barrels) 118.32 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE003
2013-1 Produced Fluid (in Barrels) 17.46 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2013-1 Produced Fluid (in Barrels) 242.82 Bbl REUSE OTHER THAN ROAD SPREADING
2013-2 Produced Fluid (in Barrels) 52.91 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013-2 Produced Fluid (in Barrels) 17.23 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2013-2 Produced Fluid (in Barrels) 1.94 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2013-2 Produced Fluid (in Barrels) 280.69 Bbl REUSE OTHER THAN ROAD SPREADING
2014-1 Produced Fluid (in Barrels) 0.85 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014-1 Produced Fluid (in Barrels) 218.74 Bbl REUSE OTHER THAN ROAD SPREADING
2014-2 Produced Fluid (in Barrels) 1.84 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014-2 Produced Fluid (in Barrels) 215.60 Bbl REUSE OTHER THAN ROAD SPREADING
2015-1 Produced Fluid (in Barrels) 241.31 Bbl REUSE OTHER THAN ROAD SPREADING
2015-2 Produced Fluid (in Barrels) 45.12 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015-2 Produced Fluid (in Barrels) 50.77 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015-2 Produced Fluid (in Barrels) 34.65 Bbl REUSE OTHER THAN ROAD SPREADING
2016-1 Produced Fluid (in Barrels) RWC 802 16.06 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016-1 Produced Fluid (in Barrels) RWC 802 87.52 Bbl REUSE OTHER THAN ROAD SPREADING
2016-2 Produced Fluid (in Barrels) RWC 802 115.06 Bbl REUSE OTHER THAN ROAD SPREADING
2017-01 Produced Fluid (in Barrels) RWC 802 19.63 Bbl REUSE (AT WELL PAD)
2017-02 Produced Fluid (in Barrels) RWC 802 21.88 Bbl REUSE (AT WELL PAD)
2017-03 Produced Fluid (in Barrels) RWC 802 13.46 Bbl REUSE (AT WELL PAD)
2017-06 Produced Fluid (in Barrels) RWC 802 40.89 Bbl REUSE (AT WELL PAD)
2017-07 Produced Fluid (in Barrels) RWC 802 19.59 Bbl REUSE (AT WELL PAD)
2017-11 Produced Fluid (in Barrels) RWC 802 19.45 Bbl REUSE (AT WELL PAD)
2017-12 Produced Fluid (in Barrels) RWC 802 52.07 Bbl REUSE (AT WELL PAD)
2018-01 Produced Fluid (in Barrels) RWC 802 17.62 Bbl REUSE (AT WELL PAD)
2018-05 Produced Fluid (in Barrels) RWC 802 60.93 Bbl REUSE (AT WELL PAD)
2018-06 Produced Fluid (in Barrels) RWC 802 19.14 Bbl REUSE (AT WELL PAD)
2018-09 Produced Fluid (in Barrels) RWC 802 64.09 Bbl REUSE (AT WELL PAD)
2019-01 Produced Fluid (in Barrels) RWC 802 42.08 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2020600 Primary Facility 11/02/2011 Routine/Complete Inspection No Violations Noted
2129470 Primary Facility 01/11/2013 Routine/Complete Inspection No Violations Noted
2250154 Primary Facility 02/28/2014 Routine/Partial Inspection No Violations Noted 5 Marcellus gas wells in production.
2593684 Primary Facility 2017-04-21 Routine/Complete Inspection No Violations Noted Inspection to assess overall site conditions. I arrived on site at 13:40 hrs. No violations cited.
2706379 Primary Facility 2018-03-16 Routine/Complete Inspection No Violations Noted Inspection to assess overall site conditions. No violations cited.
2779844 Primary Facility 2018-09-25 Routine/Complete Inspection No Violations Noted The DEP conducted a RESTORATION inspection of the Repsol Oil & Gas VanBlarcom (03-004) R well pad in Columbia Twp, Bradford County on 9/25/2018 at 1115 hours. The weather was raining, 59 degrees, and 87% humidity.

The inspection was conducted in response to a Well-Site Restoration Report received by the DEP for API #015-20441. The site appears to be very well vegetated and stabilized. No temporary E&S BMPs were observed and no erosional issues were noted. All PCSM BMPs were in place and appeared to be functioning properly.

This well-site restoration reported is accepted at this time. Due to the site meeting stabilization requirements, I would also recommend terminating this site's ESCGP.

No violations noted. I departed the site at 1150.

For data sources see[6]

References