X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-20594

Well Details

Well ID: 37-015-20594
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Canton Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 148477
Farm/Lease Name: HARNISH 01 032 03 G 3H
License Status: Active
Spud Date: 06/23/2010
Permit Date: 1/22/2010
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.711164
Longitude: -76.838231

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2011 REPSOL OIL & GAS USA LLC 169,738.00 63 0.00 0 0.00 0
2012 REPSOL OIL & GAS USA LLC 723,741.80 316 0.00 0 0.00 0
2013 REPSOL OIL & GAS USA LLC 528,754.90 349 0.00 0 0.00 0
2014 REPSOL OIL & GAS USA LLC 379,319.10 331 0.00 0 0.00 0
2015 REPSOL OIL & GAS USA LLC 303,463.80 362 0.00 0 0.00 0
2016 REPSOL OIL & GAS USA LLC 243,360.60 364 0.00 0 0.00 0
2017 REPSOL OIL & GAS USA LLC 203,336.90 365 0.00 0 0.00 0
2018 REPSOL OIL & GAS USA LLC 178,072.30 365 0.00 0 0.00 0
2019 REPSOL OIL & GAS USA LLC 42,098.70 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-2 Drilling Fluid Waste (in Barrels) 472.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010-2 Produced Fluid (in Barrels) 106.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011-1 Drill Cuttings (in Tons) 7.00 Tons LANDFILL NY # 02S17
2011-1 Drill Cuttings (in Tons) 38.00 Tons LANDFILL NY31346244
2011-1 Drilling Fluid Waste (in Barrels) 51.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011-2 Fracing Fluid Waste (in Barrels) 4,836.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-2 Produced Fluid (in Barrels) 289.76 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011-2 Produced Fluid (in Barrels) 597.51 Bbl REUSE OTHER THAN ROAD SPREADING
2012-1 Produced Fluid (in Barrels) 43.49 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012-1 Produced Fluid (in Barrels) 63.65 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012-1 Produced Fluid (in Barrels) 21.22 Bbl INJECTION DISPOSAL WELL 34-133-20114
2012-1 Produced Fluid (in Barrels) 1,538.20 Bbl REUSE OTHER THAN ROAD SPREADING
2012-2 Produced Fluid (in Barrels) 35.15 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012-2 Produced Fluid (in Barrels) 137.42 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012-2 Produced Fluid (in Barrels) 137.42 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2012-2 Produced Fluid (in Barrels) 191.75 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012-2 Produced Fluid (in Barrels) 63.92 Bbl INJECTION DISPOSAL WELL 34-133-20114
2012-2 Produced Fluid (in Barrels) 127.83 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012-2 Produced Fluid (in Barrels) 454.12 Bbl REUSE OTHER THAN ROAD SPREADING
2013-1 Produced Fluid (in Barrels) 68.99 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013-1 Produced Fluid (in Barrels) 150.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE003
2013-1 Produced Fluid (in Barrels) 127.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2013-1 Produced Fluid (in Barrels) 362.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-2 Produced Fluid (in Barrels) 162.46 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013-2 Produced Fluid (in Barrels) 92.41 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2013-2 Produced Fluid (in Barrels) 31.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2013-2 Produced Fluid (in Barrels) 558.32 Bbl REUSE OTHER THAN ROAD SPREADING
2014-1 Produced Fluid (in Barrels) 387.38 Bbl REUSE OTHER THAN ROAD SPREADING
2014-2 Produced Fluid (in Barrels) 249.57 Bbl REUSE OTHER THAN ROAD SPREADING
2015-1 Produced Fluid (in Barrels) 30.64 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015-1 Produced Fluid (in Barrels) 234.39 Bbl REUSE OTHER THAN ROAD SPREADING
2015-2 Produced Fluid (in Barrels) 65.29 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015-2 Produced Fluid (in Barrels) 99.49 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015-2 Produced Fluid (in Barrels) 163.22 Bbl REUSE OTHER THAN ROAD SPREADING
2016-1 Produced Fluid (in Barrels) RWC 802 226.15 Bbl REUSE OTHER THAN ROAD SPREADING
2016-2 Produced Fluid (in Barrels) RWC 802 31.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016-2 Produced Fluid (in Barrels) RWC 802 162.97 Bbl REUSE OTHER THAN ROAD SPREADING
2017-01 Produced Fluid (in Barrels) RWC 802 62.22 Bbl REUSE (AT WELL PAD)
2017-03 Produced Fluid (in Barrels) RWC 802 62.19 Bbl REUSE (AT WELL PAD)
2017-05 Produced Fluid (in Barrels) RWC 802 63.87 Bbl REUSE (AT WELL PAD)
2017-07 Produced Fluid (in Barrels) RWC 802 32.83 Bbl REUSE (AT WELL PAD)
2017-09 Produced Fluid (in Barrels) RWC 802 30.02 Bbl REUSE (AT WELL PAD)
2017-10 Produced Fluid (in Barrels) RWC 802 64.40 Bbl REUSE (AT WELL PAD)
2018-01 Produced Fluid (in Barrels) RWC 802 63.56 Bbl REUSE (AT WELL PAD)
2018-04 Produced Fluid (in Barrels) RWC 802 60.04 Bbl REUSE (AT WELL PAD)
2018-06 Produced Fluid (in Barrels) RWC 802 59.35 Bbl REUSE (AT WELL PAD)
2018-09 Produced Fluid (in Barrels) RWC 802 60.59 Bbl REUSE (AT WELL PAD)
2018-12 Produced Fluid (in Barrels) RWC 802 60.10 Bbl REUSE (AT WELL PAD)
2019-01 Produced Fluid (in Barrels) RWC 802 28.36 Bbl REUSE (AT WELL PAD)
2019-03 Produced Fluid (in Barrels) RWC 802 29.63 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1920107 Primary Facility 09/14/2010 Drilling/Alteration No Violations Noted saxon rig 172 @ 4755 ft deep all ok
1920124 Primary Facility 08/31/2010 Drilling/Alteration No Violations Noted saxon rig 172 @ 2491 ft deep hammer stuck in hole .. ran 1080 ft 9 5/8 casing cemented to surface 40 bbl ret to surface.
1950110 Primary Facility 11/23/2010 Routine/Complete Inspection Violation(s) Noted
1984651 Primary Facility 06/29/2011 Routine/Complete Inspection No Violations Noted
2012399 Primary Facility 10/04/2011 Routine/Complete Inspection No Violations Noted
2356948 Primary Facility 03/30/2015 Routine/Complete Inspection No Violations Noted
2557065 Primary Facility 2017-01-31 Routine/Complete Inspection No Violations Noted Three wells in production phase. One well not hooked up for production. Four total wells drilled. Four water separators within steel containment and three water separators in use.
2680065 Primary Facility 2018-01-09 Routine/Complete Inspection No Violations Noted Inspection to assess overall site conditions. No violations cited.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1950110 604874 11/23/2010 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/26/2011 08/26/2011 6675.00 3,657,528.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Slick Water Schlumberger Acid, Iron Control Agent, Corrosion Inhibitor, Friction Reducer, Scale Inhibitor, Biocide Aliphatic acids 30.00 0.00009100
Methanol 67-56-1 40.00 0.00012200
Hydrochloric Acid 28.00 0.02
Propargyl alcohol 107-19-7 10.00 0.00003000
Trisodium phosphate 7601-54-9 5.00 0.00144900
Ethylene glycol 107-21-1 5.00 0.00144900
Aliphatic alcohols, ethoxylated #1 30.00 0.00009100
Sodium erythorbate 6381-77-7 100.00 0.00019600
Glutaraldehyde 111-30-8 25.00 0.00657800
Ammonium sulfate 7783-20-2 30.00 0.01
Sand (Proppant) Proppant Quartz 14808-60-7 100.00 14.48
Fresh Water Carrier/Base Fluid 84.90 72.26
Recycled Produced Water Carrier/Base Fluid 15.10 12.80
* Total Water Volume sources may include fresh water, produced water, and/or recycled water ** Information is based on the maximum potential for concentration and thus the total may be over 100 All component information listed was obtained from the suppli

For data sources see[7]

References