X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-27774

Well Details

Well ID: 37-059-27774
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Center Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 152379
Farm/Lease Name: WILEY ROG2H108
License Status: Active
Spud Date: 01/05/2019
Permit Date: 12/21/2018
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.934597
Longitude: -80.354725

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2019-01 Drill Cuttings (in Tons) RWC 810 859.83 Tons LANDFILL 100419
2019-01 Drilling Fluid Waste (in Barrels) RWC 803 1,985.00 Bbl REUSE (AT WELL PAD)
2019-01 Other Oil & Gas Wastes (in Barrels) RWC 899 38.46 Bbl REUSE (AT WELL PAD)
2019-01 Other Oil & Gas Wastes (in Tons) RWC 899 11.52 Tons LANDFILL 100419
2019-02 Drill Cuttings (in Tons) RWC 810 17.54 Tons INJECTION DISPOSAL WELL 34-009-23823
2019-02 Other Oil & Gas Wastes (in Barrels) RWC 899 76.54 Bbl INJECTION DISPOSAL WELL 2D0859721
2019-02 Other Oil & Gas Wastes (in Barrels) RWC 899 11.92 Bbl REUSE (AT WELL PAD)
2019-02 Other Oil & Gas Wastes (in Barrels) RWC 899 0.77 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019-03 Other Oil & Gas Wastes (in Barrels) RWC 899 9.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019-03 Other Oil & Gas Wastes (in Barrels) RWC 899 111.54 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2826920 Primary Facility 2019-01-15 Drilling/Alteration No Violations Noted The well was spud on 1/5/2019. Falcon 25 began drilling 24-inch surface borehole section on 1/15/19. Drilling ahead 271'.

For data sources see[6]

References