37-015-23366

Well Details

Well ID: 37-015-23366
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Overton Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 145497
Farm/Lease Name: LIGHTCAP NORTH UNIT 1H
License Status: Active
Spud Date: 09/18/2017
Permit Date: 8/8/2017
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.571652
Longitude: -76.590901

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 3,844,145.18 291 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 802,886.82 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2017-09 Drill Cuttings (in Tons) RWC 810 14.43 Tons LANDFILL 301358
2017-12 Drill Cuttings (in Tons) RWC 810 1,399.16 Tons LANDFILL 301358
2017-12 Drilling Fluid Waste (in Barrels) RWC 803 778.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-01 Drill Cuttings (in Tons) RWC 810 415.14 Tons LANDFILL 301358
2018-01 Produced Fluid (in Barrels) RWC 802 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-02 Drill Cuttings (in Tons) RWC 810 14.37 Tons LANDFILL 301358
2018-03 Produced Fluid (in Barrels) RWC 802 1,320.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-03 Produced Fluid (in Barrels) RWC 802 5,184.51 Bbl REUSE (AT WELL PAD)
2018-04 Produced Fluid (in Barrels) RWC 802 240.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-04 Produced Fluid (in Barrels) RWC 802 2,055.15 Bbl REUSE (AT WELL PAD)
2018-05 Produced Fluid (in Barrels) RWC 802 991.15 Bbl REUSE (AT WELL PAD)
2018-05 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 67.21 Tons LANDFILL 301358
2018-06 Produced Fluid (in Barrels) RWC 802 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-06 Produced Fluid (in Barrels) RWC 802 1,991.93 Bbl REUSE (AT WELL PAD)
2018-07 Produced Fluid (in Barrels) RWC 802 1,590.28 Bbl REUSE (AT WELL PAD)
2018-08 Produced Fluid (in Barrels) RWC 802 44.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-08 Produced Fluid (in Barrels) RWC 802 1,338.09 Bbl REUSE (AT WELL PAD)
2018-09 Produced Fluid (in Barrels) RWC 802 1,080.08 Bbl REUSE (AT WELL PAD)
2018-10 Produced Fluid (in Barrels) RWC 802 1,852.85 Bbl REUSE (AT WELL PAD)
2018-11 Produced Fluid (in Barrels) RWC 802 767.81 Bbl REUSE (AT WELL PAD)
2018-12 Produced Fluid (in Barrels) RWC 802 459.80 Bbl REUSE (AT WELL PAD)
2019-01 Produced Fluid (in Barrels) RWC 802 664.65 Bbl REUSE (AT WELL PAD)
2019-02 Produced Fluid (in Barrels) RWC 802 552.79 Bbl REUSE (AT WELL PAD)
2019-03 Produced Fluid (in Barrels) RWC 802 1,107.20 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2647301 Primary Facility 2017-10-13 Routine/Complete Inspection No Violations Noted Conductor only.
2660023 Primary Facility 2017-11-09 Routine/Complete Inspection No Violations Noted I met Jeremy Boyd when I arrived. Precision rig 569 on location, just finishing drilling the 12 1/4" section of the Hart North 5H. Containment was in fairly good shape, although I pointed out 2 areas to Jeremy where the liner was torn on the berms. Jeremy told me he would address it. Overall, site appeared to be clean and well maintained.
2702018 Primary Facility 2018-02-14 Routine/Complete Inspection No Violations Noted Chief Oil and Gas representative on site: Chris Marsh

Universal conducting the frack. PPC site specific plan on site. The operator reported approximately 200 gallons of fracking fluid escaped at high pressure from an iron fitting attached to the well head. The high pressure fluid cut through the primary containment. The iron fitting was replaced and the containment was repaired. No clean-up under containment. A Vac truck was used were free liquid could be removed. Spilled material appears to have stayed on pad surface. Clean-up to begin after the frack is completed. Violations noted. No samples collected.

2707081 Primary Facility 2018-03-15 Routine/Complete Inspection No Violations Noted Site was very active when I arrived; company man Gibb Blevins was not at the site when I arrived. Frac was finished, and crews were setting up temporary separators and dehy units, as well as breaking down Baker tank containments. Many puddles were present on the pad surface, with conductance ranging from .56 to 1.3 mS/cm for the most part. Some small puddles (.5-2 gallons) were present near one of the Baker tank batteries that had slightly higher conductance (2-2.5 mS/cm); other puddles in the immediate area were in the range of .8-1.1 mS/cm. I was unable to access the center of the pad due to activity and truck traffic.
2733696 Primary Facility 2018-05-22 Routine/Complete Inspection No Violations Noted Arrrived at 12:00. Weather: rain. There were 5 producing wells on location. Frac operations appear to have been recently completed. There were 5 sand separators and two banks of tanks on site, liner was still in place. Cellars were water-filled with the exception of the Hart N 3H. It is worth remarking that there were numerous signs of ineffective sediment control on the access road (see photos).

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/18/2018 02/24/2018 8171 12,607,300.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Chif Oil & Gas Carrier/Base Fluid Listed Below
Unislick CST-LA Chemplex, Solvay Group Friction Reducer Listed Below
Water 7732-18-5 50 0.03317 40564
Water 7732-18-5 85 0.12174 148863
Copolymer of 2-Propenamide 79-06-1 20 0.01327 16226
Diethylene glycol mono-n-butyl ether 112-34-5 60 0.00007000 89
Glutaraldehyde 111-30-8 5 0.00117 1434
Distillate, petroleum, hydrotreated, light 64742-47-8 20 0.01327 16226
Quaternary ammonium compound 68424-85-1 10 0.00235 2869
Water 7732-18-5 40 0.00938 11475
Crystallilne silica 14808-60-7 100 13.7197 16,775,700.0
Methanol 67-56-1 5 0.00001000 7
Ethanol, 2,2',2"-nitrilotris-, tris(dihydrogen phosphate) (ester), sodium salt 68171-29-9 30 0.0016 1955
Hydrochloric acid 7647-01-0 15 0.02148 26270
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00133 1623
Formaldehyde 50-00-0 1 0.00001000 1
Ethylene glycol 107-21-1 30 0.0016 1955
Water 7732-18-5 40 0.00213 2607
Methanol 67-56-1 45 0.01056 12909
Thiourea 62-56-6 1 0.00001000 1
Ethoxylated (C10-16) alcohols 68002-97-1 35 0.00004000 52
Water 7732-18-5 100 86.0419 105,208,000.0
Oleic acid diethanolamide 93-83-4 2 0.00133 1623
Acetophenone 98-86-2 1 0.00001000 1
Unihib G GeoSafe Acid Inhibitor Listed Below
SCAL16486A Nalco Champion Scale Inhibitor Listed Below
BIOC11219A Nalco Champion Biocide Listed Below
Sand Sergant/Unimin Proppant Listed Below
Hydrochloric Acid PVS Acidizing Listed Below

For data sources see[7]