If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22411 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.962961,"lon":-79.849375,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Concord Township | |
Operator Name: EM ENERGY PA LLC | |
Well Pad ID: 151118 | |
Farm/Lease Name: LYNX 11BH | |
License Status: Regulatory Inactive Status | |
Spud Date: 03/25/2015 | |
Permit Date: 2/17/2015 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.962961 | |
Longitude: -79.849375 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | EM ENERGY PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | EM ENERGY PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | EM ENERGY PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | EM ENERGY PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2015-1 | Drill Cuttings (in Tons) | 257.39 Tons | LANDFILL | SWF 1025 |
2015-1 | Drilling Fluid Waste (in Barrels) | 500.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015-2 | Drill Cuttings (in Tons) | 604.26 Tons | LANDFILL | 100585 |
2015-2 | Drilling Fluid Waste (in Barrels) | 2,718.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015-2 | Drilling Fluid Waste (in Barrels) | 1,956.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016-2 | Filter Socks (in Tons) RWC 812 | 0.07 Tons | LANDFILL | 100620 |
2016-2 | Other Oil & Gas Wastes (in Tons) RWC 899 | 0.11 Tons | LANDFILL | 100585 |
2016-2 | Synthetic Liner Materials (in Tons) RWC 806 | 1.58 Tons | LANDFILL | 100585 |
2017-02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 3.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 7.65 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-03 | Produced Fluid (in Barrels) RWC 802 | 46.58 Bbl | REUSE (AT WELL PAD) | |
2017-03 | Waste Water Treatment Sludge (in Tons) RWC 804 | 5.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017-04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 3.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017-04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 3.33 Bbl | REUSE (AT WELL PAD) | |
2018-04 | Synthetic Liner Materials (in Tons) RWC 806 | 2.95 Tons | LANDFILL | 100585 |
2018-09 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 1.17 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2356717 | Primary Facility | 03/31/2015 | Routine/Partial Inspection | No Violations Noted | |
2366308 | Primary Facility | 04/30/2015 | Routine/Partial Inspection | No Violations Noted | |
2386671 | Primary Facility | 07/09/2015 | Drilling/Alteration | No Violations Noted | |
2387076 | Primary Facility | 07/13/2015 | Drilling/Alteration | No Violations Noted | |
2420872 | Primary Facility | 10/29/2015 | Routine/Partial Inspection | No Violations Noted | |
2548517 | Primary Facility | 2016-12-20 | Routine/Partial Inspection | No Violations Noted | |
2692615 | Primary Facility | 2018-02-08 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
Post stimulation operations underway. All wells on location have been drilled, completed, and are in production. Well tags in place. Production equipment installed with containment for the production tanks. A gathering pipeline is connected to well pad, with a pipeline header installed on well pad. The pad is fenced. There are several roll-off dumpsters on location containing pad liner and other refuse from stimulation operations. These are awaiting removal. All temporary storage tanks from stimulation operations have been removed. |
For data sources see[6]