X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22697

Well Details

Well ID: 37-019-22697
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Connoquenessing Township
Operator Name: XTO ENERGY INC
Well Pad ID: 154247
Farm/Lease Name: LESNEY UNIT 5H
License Status: Active
Spud Date: 01/24/2018
Permit Date: 11/16/2017
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.880494
Longitude: -79.978133

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 XTO ENERGY INC 346,377.24 128 0.00 0 3,085.81 122
2019 XTO ENERGY INC 456,808.04 90 0.00 0 3,164.16 90

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-02 Drill Cuttings (in Tons) RWC 810 358.35 Tons LANDFILL 100585
2018-02 Drilling Fluid Waste (in Barrels) RWC 803 1,100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018-03 Drill Cuttings (in Tons) RWC 810 849.08 Tons LANDFILL 100585
2018-04 Synthetic Liner Materials (in Tons) RWC 806 64.82 Tons LANDFILL 100434
2018-05 Other Oil & Gas Wastes (in Barrels) RWC 899 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018-05 Produced Fluid (in Barrels) RWC 802 285.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018-05 Produced Fluid (in Barrels) RWC 802 5,225.00 Bbl REUSE (AT WELL PAD)
2018-05 Unused Fracturing Fluid Waste (in Tons) RWC 805 14.49 Tons LANDFILL 100434
2018-06 Other Oil & Gas Wastes (in Barrels) RWC 899 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018-06 Produced Fluid (in Barrels) RWC 802 2,906.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018-06 Synthetic Liner Materials (in Tons) RWC 806 34.79 Tons LANDFILL 100585
2018-06 Waste Water Treatment Sludge (in Tons) RWC 804 49.64 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2018-07 Produced Fluid (in Barrels) RWC 802 13,666.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018-08 Other Oil & Gas Wastes (in Tons) RWC 899 0.04 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2018-08 Produced Fluid (in Barrels) RWC 802 791.18 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018-08 Produced Fluid (in Barrels) RWC 802 181.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2018-08 Produced Fluid (in Barrels) RWC 802 3,454.40 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018-08 Produced Fluid (in Barrels) RWC 802 4,694.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018-12 Produced Fluid (in Barrels) RWC 802 52.38 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018-12 Produced Fluid (in Barrels) RWC 802 120.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2018-12 Produced Fluid (in Barrels) RWC 802 363.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2018-12 Produced Fluid (in Barrels) RWC 802 662.80 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018-12 Produced Fluid (in Barrels) RWC 802 2,458.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019-01 Produced Fluid (in Barrels) RWC 802 381.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019-01 Produced Fluid (in Barrels) RWC 802 444.97 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019-01 Produced Fluid (in Barrels) RWC 802 1,597.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019-01 Produced Fluid (in Barrels) RWC 802 4,270.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019-02 Produced Fluid (in Barrels) RWC 802 848.50 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019-02 Produced Fluid (in Barrels) RWC 802 518.76 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019-02 Produced Fluid (in Barrels) RWC 802 1,188.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019-02 Produced Fluid (in Barrels) RWC 802 2,495.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019-03 Produced Fluid (in Barrels) RWC 802 1,149.17 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019-03 Produced Fluid (in Barrels) RWC 802 421.23 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019-03 Produced Fluid (in Barrels) RWC 802 2,091.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019-03 Produced Fluid (in Barrels) RWC 802 1,301.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2684628 Primary Facility 2018-01-22 Administrative/File Review No Violations Noted
2687369 Primary Facility 2018-01-25 Routine/Partial Inspection No Violations Noted At the time of inspection, Lightning Energy Services was onsite with a Soilmec auger rig. They were circulating in mouse holes. Cellar has been set. Well was partially covered with a steel plate while mouse hole was being set. The Pawlowicz well was surrounded with a steel cage. Emergency Response sign and permit sign is correctly posted at the lease access entrance.
2690721 Primary Facility 2018-02-05 Administrative/File Review No Violations Noted
2690857 Primary Facility 2018-02-05 Administrative/File Review No Violations Noted
2692933 Primary Facility 2018-02-05 Routine/Partial Inspection No Violations Noted At the time of inspection, rig is onsite , but has been laid down. Well was covered with a steel plate. Most of equipment remained onsite and is on containment. Toolpusher said they'll be moving rig to Ohio. Surface casing was cemented using 435 sxs Class A (94 bbls), 2% Gypsum, 2% CaCl2, 15.6 ppg, 1.22 yield. Displaced with 76 bbls water and landed plug. Floats held and 22 bbls cement returned to surface. A float shoe and collar were used with 4 centralizers.

Intermediate casing was cemented using 670 sxs Class A (146 bbls), 2% Gypsum, 2% CaCl2, 15.6 ppg, 1.22 yield. Displaced with 154 bbls water. Did not bump plug. Floats held and 25 bbls cement returned to surface. A float shoe and collar were used with 16 centralizers.

2702978 Primary Facility 2018-03-09 Administrative/File Review No Violations Noted
2706599 Primary Facility 2018-03-19 Administrative/File Review No Violations Noted
2709305 Primary Facility 2018-03-15 Drilling/Alteration No Violations Noted At the time of inspection, 5 1/2" was being unloaded from trucks. Nomac 79 was onsite drilling production hole. BOP had been tested on 3/10 and passed. Chemicals were all contained and there were no apparent rips, tears, or holes in containment.
2709543 Primary Facility 2018-03-19 Routine/Partial Inspection No Violations Noted At the time of inspection, Nomac 79 was rigging down and will be moving to the Briston pad. Production casing was cemented using a lead of 400 sxs 35:65 Poz Class H (79 bbls), 15.2 ppg, 1.1 yield and tail of 1685 sxs Class H, 35% Acid Soluble (470 bbls), 15.6 ppg, 1.57 yield. Pumped 335 bbls water and plug landed. Floats held. 10 bbls spacer to surface and top of cement estimated to be at 2165'.
2718425 Primary Facility 2018-04-16 Administrative/File Review No Violations Noted
2723389 Primary Facility 2018-04-26 Administrative/File Review No Violations Noted
2727814 Primary Facility 2018-05-09 Routine/Partial Inspection No Violations Noted On 5/9/2018, WQS Brian MacQuarrie onsite, meet with Shawn Gearhart- XTO Energy. Currently the plugs are being drilled out on the Lesney 5H. The well site consists of two wells; the Palowicz 4H-019-22583 (currently shut in) and the Lesney 5H-019-22697. Erosion and Sedimentation plan and E/S inspection reports in mailbox. Site sign maintained at entrance. Erosion and Sedimentation BMPs installed and maintained.
2737133 Primary Facility 2018-06-04 Administrative/File Review No Violations Noted
2742848 Primary Facility 2018-06-19 Administrative/File Review No Violations Noted
2748878 Primary Facility 2018-07-05 Routine/Partial Inspection No Violations Noted On 7/5/2018, WQS Brian MacQuarrie onsite. The well site consists of two wells; the Palowicz 4H-019-22583 and the Lesney 5H-019-22697 in production. Erosion and Sedimentation plan and E/S inspection reports in mailbox. Site sign maintained at entrance. Compost filter sock removed and placed in a pile on well pad. Vegetative growth established in previously disturbed areas.
2753671 Primary Facility 2018-07-19 Administrative/File Review No Violations Noted
2812617 Primary Facility 2018-12-06 Routine/Partial Inspection No Violations Noted On 12/6/2018, WQS Brian MacQuarrie onsite. Post Drilling Site Restoration report received for WellAPI 019-22697. All equipment not necessary for production removed from site. Site consists of two wells (4H-019-22583 and 5-019-22697). Tank battery consists of three 400 bbl tanks installed within secondary steel containment structure. Other production equipment includes two GPUs and TVO. Well site vegetated. Infiltration pond maintained.

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/20/2018 05/04/2018 5554 25,407,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CI-3 C&J Energy Services Acid Corrosion Inhibitors Listed Below Listed Below 0 0 0
Water XTO Energy/ExxonMobil Carrier Fluid Water 7732-18-5 100 91.252 0
BIO-CLEAR 2000 C&J Energy Services Biocides Listed Below Listed Below 0 0 0
Tar Bases, Quinoline Derivs. 68513-87-1 1 0.00001300 0
Iron Oxide 1309-37-1 0.1 0.002725 0
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) 10222-01-2 30 0.006397 0
Crystalline Silica, quartz 14808-60-7 99.9 1.47243 0
Ammonium Chloride 12125-02-9 2 0.000385 0
Crystalline Silica, quartz 14808-60-7 99.9 3.73772 0
Hydrochloric Acid 7647-01-0 7.5 0.052249 0
Methanol 67-56-1 1 0.000192 0
Iron Oxide 1309-37-1 0.1 0.003741 0
Sodium Acetate Anhydrous 127-09-3 3 0.00208 0
Cinnamaldehyde 104-55-2 15 0.000188 0
Dimethylformamide 68-12-2 20 0.000251 0
Sorbitan Monooleate 1338-43-8 2 0.001387 0
2-Propenamide as residual 79-06-1 0.1 0.00006900 0
Polyethylene glycol 25322-68-3 50 0.010662 0
Titanium Oxide 13463-67-7 0.1 0.003741 0
Ethylene Glycol 107-21-1 40 0.000501 0
1-OCTANOL 111-87-5 2.5 0.00003100 0
Water 7732-18-5 30 0.0208 0
Ethylene Glycol 107-21-1 5 0.003467 0
Titanium Oxide 13463-67-7 0.1 0.002725 0
Ethoxylated Sorbitan Monooleate 9005-65-6 1 0.000693 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 15 0.000188 0
CJENERGY-Phosphate-00040 Proprietary 6 0.001155 0
Water 7732-18-5 92.5 0.644401 0
Water 7732-18-5 28.5 0.006077 0
Alcohols, C12-15-branched and linear, ethoxylated propoxylated 120313-48-6 2 0.001387 0
Poly(oxy-1,2-ethanediyl),alpha-(4-nonylphenyl)-omega hydroxy-, branched 127087-87-0 5 0.00006300 0
Poly(oxy-1,2-ethandiyl), alpha-isodecyl-omega-hydroxy-phosphate 108818-88-8 2 0.001387 0
Aluminum Oxide 1344-28-1 1.1 0.041156 0
Aluminum Oxide 1344-28-1 1.1 0.029973 0
Titanium Oxide 13463-67-7 0.1 0.001474 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 35 0.024266 0
Isopropanol 67-63-0 2.5 0.00003100 0
2-Butoxyethanol 111-76-2 15 0.000188 0
Water 7732-18-5 30 0.000376 0
Aluminum Oxide 1344-28-1 1.1 0.016213 0
Crystalline Silica, quartz 14808-60-7 99.9 2.72211 0
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 30 0.0208 0
Water 7732-18-5 96 0.018478 0
1-DECANOL 112-30-1 5 0.00006300 0
Iron Oxide 1309-37-1 0.1 0.001474 0
Monoethanolamine hydrochloride 2002-24-6 2 0.000385 0
Triethyl Phosphate 78-40-0 2.5 0.00003100 0
Sand C&J Energy Services Sand - Bulk - Pennsylvania Listed Below Listed Below 0 0 0
FR-16 C&J Energy Services Friction Reducer Listed Below Listed Below 0 0 0
SI-6 PA-Only C&J Energy Services PA-Proprietary Listed Below Listed Below 0 0 0
HC-7.5 C&J Energy Services Bulk Acid Listed Below Listed Below 0 0 0

For data sources see[7]

References