37-105-21389

Well Details

Well ID: 37-105-21389
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Ulysses Township
Operator Name: SUSQUEHANNA ENERGIES INC
Well Pad ID:
Farm/Lease Name: HOOPES 57
License Status: Active
Spud Date: 06/26/2008
Permit Date: 8/23/2007
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.884860
Longitude: -77.758622

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 0.00 0.00 0.00
2008 NORTH EAST GAS & OIL CO 1,418.00 105 0.00 0.00
2009 NORTH EAST GAS & OIL CO 3,704.00 258 0.00 0.00
2010 NORTH EAST GAS & OIL CO 3,746.00 292 0.00 0.00
2011 NORTH EAST GAS & OIL CO 3,653.00 281 0.00 0.00
2012 NORTH EAST GAS & OIL CO 2,574.00 329 0.00 0.00
2013 NORTH EAST GAS & OIL CO 2,722.00 358 0.00 0.00
2014 SUSQUEHANNA ENERGIES INC 1,613.00 365 0.00 0.00
2015 SUSQUEHANNA ENERGIES INC 2,035.00 365 0.00 0.00
2016 SUSQUEHANNA ENERGIES INC 1,731.00 365 0.00 0.00
2017 SUSQUEHANNA ENERGIES INC 1,816.00 365 0.00 0.00
2018 SUSQUEHANNA ENERGIES INC 1,264.00 365 0.00 0.00

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2008-0 Brine 36.00 Bbl Brine or Industrial Waste Treatment Plt PA0102784
2008-0 Fracking Fluid 100.00 Bbl Brine or Industrial Waste Treatment Plt PA0102784
2009-0 Brine 14.00 Bbl Brine or Industrial Waste Treatment Plt PA0102784
2009-0 Brine 26.00 Bbl Road Spreading M05909
2010-0 Produced Fluid (in Barrels) 41.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2010-0 Produced Fluid (in Barrels) 83.00 Bbl ROAD SPREADING
2011-0 Produced Fluid (in Barrels) 48.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011-0 Produced Fluid (in Barrels) 59.00 Bbl ROAD SPREADING
2012-0 Produced Fluid (in Barrels) 22.00 Bbl ROAD SPREADING
2013-0 Produced Fluid (in Barrels) 62.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2013-0 Produced Fluid (in Barrels) 48.00 Bbl ROAD SPREADING
2014-0 Produced Fluid (in Barrels) 105.00 Bbl ROAD SPREADING
2017-0 Produced Fluid (in Barrels) RWC 802 61.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2018-0 Produced Fluid (in Barrels) RWC 802 51.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2132964 Primary Facility 01/23/2013 Routine/Partial Inspection No Violations Noted On January 23, 2013 an inspection was conducted of the Hoopes 57 well site in Ulysses Township, Potter County. No issues were evident at the time of this inspection and no violations were cited.
2501395 Primary Facility 2016-05-29 Routine/Complete Inspection No Violations Noted
2592237 Primary Facility 2017-05-04 Routine/Complete Inspection No Violations Noted
2682421 Primary Facility 2018-01-12 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. The wellhead assembly all fittings and flow lines were tested for gas. The results of this testing was no gas was detected on the wellhead assembly or the well area.
2817088 Primary Facility 2018-12-18 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. The wellhead assembly is a approximate 10" casing out of the ground threaded to an approximate 7"x2"x2" tee/ hammer style fitting. Out of one side of the tee style fitting is an approximate 2" valve that is shut and has a plug in the end of the valve. On the other side of the tee style fitting is an approximate 2" valve that is open and connected to an approximate 2" production line. The approximately 2" production line then flows to a separator type production equipment tank then into a meter and then into the ground. No violations noted at the time of this Inspection.

For data sources see[6]