37-105-21856

Well Details

Well ID: 37-105-21856
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Summit Township
Operator Name: JKLM ENERGY LLC
Well Pad ID: 153187
Farm/Lease Name: SWEDEN VALLEY 101 4HU
License Status: Active
Spud Date: 02/19/2016
Permit Date: 12/21/2015
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.713289
Longitude: -77.912694

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 JKLM ENERGY LLC 134,355.59 24 0.00 0 0.00 0
2017 JKLM ENERGY LLC 2,522,183.18 359 0.00 0 0.00 0
2018 JKLM ENERGY LLC 1,112,346.00 365 0.00 0 0.00 0
2019 JKLM ENERGY LLC 225,854.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2016-1 Drill Cuttings (in Tons) RWC 810 2,723.66 Tons LANDFILL 301358
2016-1 Drilling Fluid Waste (in Barrels) RWC 803 82.42 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2016-1 Drilling Fluid Waste (in Barrels) RWC 803 2,206.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016-2 Drill Cuttings (in Tons) RWC 810 295.67 Tons LANDFILL 301358
2016-2 Drilling Fluid Waste (in Barrels) RWC 803 488.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016-2 Other Oil & Gas Wastes (in Barrels) RWC 899 206.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-2 Produced Fluid (in Barrels) RWC 802 843.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016-2 Produced Fluid (in Barrels) RWC 802 11,300.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016-2 Synthetic Liner Materials (in Tons) RWC 806 16.33 Tons LANDFILL 301358
2016-2 Waste Water Treatment Sludge (in Tons) RWC 804 38.67 Tons LANDFILL 301358
2017-01 Drilling Fluid Waste (in Barrels) RWC 803 133.33 Bbl REUSE (AT WELL PAD)
2017-01 Other Oil & Gas Wastes (in Barrels) RWC 899 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-01 Other Oil & Gas Wastes (in Barrels) RWC 899 30.00 Bbl REUSE (AT WELL PAD)
2017-01 Produced Fluid (in Barrels) RWC 802 2,124.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-01 Produced Fluid (in Barrels) RWC 802 2,415.00 Bbl REUSE (AT WELL PAD)
2017-02 Basic Sediment (in Barrels) RWC 807 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-02 Drilling Fluid Waste (in Barrels) RWC 803 615.33 Bbl REUSE (AT WELL PAD)
2017-02 Other Oil & Gas Wastes (in Barrels) RWC 899 1,089.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-02 Other Oil & Gas Wastes (in Barrels) RWC 899 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-02 Produced Fluid (in Barrels) RWC 802 761.67 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017-02 Produced Fluid (in Barrels) RWC 802 41.67 Bbl INJECTION DISPOSAL WELL 34-133-20114
2017-02 Produced Fluid (in Barrels) RWC 802 36.67 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017-02 Produced Fluid (in Barrels) RWC 802 75.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017-02 Produced Fluid (in Barrels) RWC 802 2,289.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-02 Produced Fluid (in Barrels) RWC 802 263.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-02 Produced Fluid (in Barrels) RWC 802 4,985.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-02 Produced Fluid (in Barrels) RWC 802 361.67 Bbl REUSE (AT WELL PAD)
2017-03 Other Oil & Gas Wastes (in Barrels) RWC 899 721.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-03 Other Oil & Gas Wastes (in Barrels) RWC 899 42.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-03 Produced Fluid (in Barrels) RWC 802 117.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017-03 Produced Fluid (in Barrels) RWC 802 538.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-03 Produced Fluid (in Barrels) RWC 802 4,308.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-03 Produced Fluid (in Barrels) RWC 802 250.00 Bbl REUSE (AT WELL PAD)
2017-04 Other Oil & Gas Wastes (in Barrels) RWC 899 72.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-04 Other Oil & Gas Wastes (in Barrels) RWC 899 175.00 Bbl REUSE (AT WELL PAD)
2017-04 Produced Fluid (in Barrels) RWC 802 437.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-04 Produced Fluid (in Barrels) RWC 802 2,295.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-04 Produced Fluid (in Barrels) RWC 802 123.00 Bbl REUSE (AT WELL PAD)
2017-05 Other Oil & Gas Wastes (in Barrels) RWC 899 117.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-05 Other Oil & Gas Wastes (in Barrels) RWC 899 42.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-05 Other Oil & Gas Wastes (in Barrels) RWC 899 253.00 Bbl REUSE (AT WELL PAD)
2017-05 Produced Fluid (in Barrels) RWC 802 2,919.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-05 Produced Fluid (in Barrels) RWC 802 2,563.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-05 Synthetic Liner Materials (in Tons) RWC 806 4.00 Tons LANDFILL 301358
2017-05 Waste Water Treatment Sludge (in Tons) RWC 804 7.00 Tons LANDFILL 301358
2017-06 Other Oil & Gas Wastes (in Barrels) RWC 899 68.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-06 Other Oil & Gas Wastes (in Barrels) RWC 899 518.00 Bbl REUSE (AT WELL PAD)
2017-06 Produced Fluid (in Barrels) RWC 802 902.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-06 Produced Fluid (in Barrels) RWC 802 290.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-06 Produced Fluid (in Barrels) RWC 802 270.00 Bbl REUSE (AT WELL PAD)
2017-07 Other Oil & Gas Wastes (in Barrels) RWC 899 865.00 Bbl REUSE (AT WELL PAD)
2017-07 Produced Fluid (in Barrels) RWC 802 450.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-07 Produced Fluid (in Barrels) RWC 802 783.00 Bbl REUSE (AT WELL PAD)
2017-08 Other Oil & Gas Wastes (in Barrels) RWC 899 73.33 Bbl REUSE (AT WELL PAD)
2017-08 Produced Fluid (in Barrels) RWC 802 2,503.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-08 Produced Fluid (in Barrels) RWC 802 791.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-08 Produced Fluid (in Barrels) RWC 802 206.67 Bbl REUSE (AT WELL PAD)
2017-09 Produced Fluid (in Barrels) RWC 802 1,756.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-09 Produced Fluid (in Barrels) RWC 802 913.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-09 Produced Fluid (in Barrels) RWC 802 80.00 Bbl REUSE (AT WELL PAD)
2017-10 Produced Fluid (in Barrels) RWC 802 907.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-10 Produced Fluid (in Barrels) RWC 802 2,830.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-10 Produced Fluid (in Barrels) RWC 802 36.00 Bbl REUSE (AT WELL PAD)
2017-11 Produced Fluid (in Barrels) RWC 802 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-11 Produced Fluid (in Barrels) RWC 802 1,054.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-11 Produced Fluid (in Barrels) RWC 802 43.00 Bbl REUSE (AT WELL PAD)
2017-11 Synthetic Liner Materials (in Tons) RWC 806 2.00 Tons LANDFILL 301358
2017-12 Other Oil & Gas Wastes (in Barrels) RWC 899 36.67 Bbl REUSE (AT WELL PAD)
2017-12 Produced Fluid (in Barrels) RWC 802 248.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-12 Produced Fluid (in Barrels) RWC 802 449.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-12 Produced Fluid (in Barrels) RWC 802 160.00 Bbl REUSE (AT WELL PAD)
2018-01 Other Oil & Gas Wastes (in Barrels) RWC 899 209.00 Bbl REUSE (AT WELL PAD)
2018-01 Produced Fluid (in Barrels) RWC 802 337.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018-01 Produced Fluid (in Barrels) RWC 802 409.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2018-01 Produced Fluid (in Barrels) RWC 802 1,341.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-01 Produced Fluid (in Barrels) RWC 802 83.00 Bbl REUSE (AT WELL PAD)
2018-02 Produced Fluid (in Barrels) RWC 802 163.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-02 Produced Fluid (in Barrels) RWC 802 245.00 Bbl REUSE (AT WELL PAD)
2018-02 Synthetic Liner Materials (in Tons) RWC 806 0.93 Tons LANDFILL 301358
2018-03 Produced Fluid (in Barrels) RWC 802 283.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-03 Produced Fluid (in Barrels) RWC 802 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-03 Produced Fluid (in Barrels) RWC 802 123.33 Bbl REUSE (AT WELL PAD)
2018-04 Other Oil & Gas Wastes (in Barrels) RWC 899 93.33 Bbl REUSE (AT WELL PAD)
2018-04 Produced Fluid (in Barrels) RWC 802 358.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-04 Produced Fluid (in Barrels) RWC 802 166.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-04 Produced Fluid (in Barrels) RWC 802 583.33 Bbl REUSE (AT WELL PAD)
2018-05 Other Oil & Gas Wastes (in Barrels) RWC 899 11.90 Bbl REUSE (AT WELL PAD)
2018-05 Produced Fluid (in Barrels) RWC 802 83.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-05 Produced Fluid (in Barrels) RWC 802 741.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-05 Produced Fluid (in Barrels) RWC 802 208.33 Bbl REUSE (AT WELL PAD)
2018-06 Other Oil & Gas Wastes (in Barrels) RWC 899 90.00 Bbl REUSE (AT WELL PAD)
2018-06 Produced Fluid (in Barrels) RWC 802 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-06 Produced Fluid (in Barrels) RWC 802 371.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-06 Produced Fluid (in Barrels) RWC 802 490.00 Bbl REUSE (AT WELL PAD)
2018-07 Other Oil & Gas Wastes (in Barrels) RWC 899 23.33 Bbl REUSE (AT WELL PAD)
2018-07 Produced Fluid (in Barrels) RWC 802 41.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-07 Produced Fluid (in Barrels) RWC 802 382.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-07 Produced Fluid (in Barrels) RWC 802 998.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-07 Produced Fluid (in Barrels) RWC 802 40.00 Bbl REUSE (AT WELL PAD)
2018-08 Produced Fluid (in Barrels) RWC 802 279.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-08 Produced Fluid (in Barrels) RWC 802 346.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-08 Produced Fluid (in Barrels) RWC 802 40.00 Bbl REUSE (AT WELL PAD)
2018-09 Other Oil & Gas Wastes (in Barrels) RWC 899 66.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-09 Produced Fluid (in Barrels) RWC 802 125.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018-09 Produced Fluid (in Barrels) RWC 802 568.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018-09 Produced Fluid (in Barrels) RWC 802 227.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-09 Produced Fluid (in Barrels) RWC 802 767.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-09 Produced Fluid (in Barrels) RWC 802 380.00 Bbl REUSE (AT WELL PAD)
2018-10 Produced Fluid (in Barrels) RWC 802 1,723.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018-10 Produced Fluid (in Barrels) RWC 802 80.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-11 Produced Fluid (in Barrels) RWC 802 286.67 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018-11 Produced Fluid (in Barrels) RWC 802 513.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018-11 Produced Fluid (in Barrels) RWC 802 480.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-12 Produced Fluid (in Barrels) RWC 802 83.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-02 Produced Fluid (in Barrels) RWC 802 366.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-02 Produced Fluid (in Barrels) RWC 802 8.33 Bbl REUSE (AT WELL PAD)
2019-03 Produced Fluid (in Barrels) RWC 802 160.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019-03 Produced Fluid (in Barrels) RWC 802 1,041.67 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019-03 Produced Fluid (in Barrels) RWC 802 72.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019-03 Produced Fluid (in Barrels) RWC 802 496.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-03 Produced Fluid (in Barrels) RWC 802 41.67 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2438036 Primary Facility 2016-01-05 Routine/Partial Inspection No Violations Noted Preconstruction meeting for the Sweden Valley 101 well pad. Logging operations to begin on 1/6/15. Site construction anticipated to begin after logging operations completed and will take approximately 3 weeks. TLT
2452375 Primary Facility 2016-02-18 Preoperation Inspection No Violations Noted Preoperational inspection. Spud notices for the 2HU - 5HU wells were received on 2/17/16 with an anticipated spud date of 2/19/16. Site has been constructed and stabilized. Perimeter E&S controls have been installed. TLT
2472656 Primary Facility 2016-04-05 Routine/Complete Inspection No Violations Noted
2472923 Primary Facility 2016-04-08 Routine/Complete Inspection No Violations Noted
2495009 Primary Facility 2016-06-20 Routine/Complete Inspection No Violations Noted
2546839 Primary Facility 2016-12-16 Routine/Complete Inspection No Violations Noted Routine inspection. The 2HU - 4HU wells have been drilled and stimulated. Production equipment has been installed at the site. The site was snow covered and frozen, therefore vegetative cover and E&S controls were not observed. TLT
2551296 Primary Facility 2017-01-09 Routine/Complete Inspection No Violations Noted
2564748 Primary Facility 2017-02-24 Routine/Complete Inspection No Violations Noted
2606490 Primary Facility 2017-05-18 Routine/Complete Inspection No Violations Noted
2609680 Primary Facility 2017-06-22 Routine/Partial Inspection No Violations Noted On 6/22/17 at 1345 hrs I conducted a routine inspection at the Sweden Valley 101 well site. It was overcast and 82 degrees F. Sean Bacha, Oil and Gas Consultant, was present at the site during the inspection.

The 2HU - 4HU wells were drilled in 2016 and are equipped for production. The 5HU well was spud, however, then plugged in December 2016. A new well permit application for the 6V well (105-21900) was received on 6/5/17.

I observed the E&S controls, production equipment and other materials staged on site. Grass is becoming well established on the topsoil stockpile and around the sediment traps; however, vegetative cover on the well pad fill slopes remains sparse. The sediment traps were observed (Photo #1). ST-1 (southern trap) held a minimal amount of water and had a field measured specific conductance of 209 micro Siemens/cm. The filter fabric had come off the rock filter and should be restaked (Photo #2). ST-2 (northern trap) was approximately half full and had a specific conductance of 73 micro Sie

2691252 Primary Facility 2018-01-25 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. The wellhead assembly, all fittings, flow lines and vented annulus were tested for gas. Results of this testing was that gas was detected on the 13 3/8" x 9 5/8" vented annulus. No other gas was detected on or near the well area.
2691266 Primary Facility 2018-02-05 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. This is a follow up inspection from 1-25-18. This well was found to have measurable gas on the 13 3/8" x 9 5/8" vented annulus on the prior inspection and on this inspection as well. SGS Oil and Gas Chemicals Services gathered samples of this gas on 1-31-18. Results of this sampling were not known at the time of this inspection. No other gas was detected on the well or well area.
2706607 Primary Facility 2018-03-12 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was being shut in for monitoring to watch and record well casing pressure build up. The well annulus 13 3/8"x 9 5/8" and 9 5/8" x 5 1/2" were being vented. The wellhead assembly,fittings,flow lines and annulus vents were tested for combustable gas. Results of this testing was that the 13 3/8" x 9 5/8" had 100% LEL (lower explosion limit) and 29% Methane measured on it with the gas meter. The 9 5/8" x 5 1/2" annulus vent tested no combustable gas. No other gas was detected on the wellhead assembly or the well area.
2707922 Primary Facility 2018-03-16 Routine/Complete Inspection No Violations Noted The purpose of this inspection was to observe isotopic sampling from the Intermediate #1 x Intermediate #2 annulus following a 4-dat shut-in test. The pad and surrounding are were covered in approximately 6 inches of snow at the time of the inspection. Rob Bowens and Sean Bacca (JKLM) were on location during the inspection. Prior to opening the vent for sample collection, 60 psi was observed on pressure gauge. A stainless steel tube was used to collect the sample by JKLM's consultant, SGS. No split samples were collected by the department. The annulus vent was left open following sample collection.
2715619 Primary Facility 2018-04-06 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was being monitored every three(3) to four (4) days for a pressure reading on the 13 3/8" x 9 5/8" annulus vent. This vent was shut in during this time and then opened and pressure recorded. This will be an ongoing practice until a determination of a course of action is decide. Rob Bowens (production supervisor) was at this inspection.
2767307 Primary Facility 2018-08-24 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. Combustible gas was detected on the 13 3/8" x 9 5/8" annulus vent. Water was present in the cellar with no noted bubbling. This well had been monitored with periodic 72 hour shut in tests. At the time of this inspection it is not known if the shut in tests or monitoring is still ongoing. No violations were noted at this inspection.
2768967 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of the JKLM Sweden Valley 101 Well Pad ESG29-105-15-0003 on 8/23/2018 @1130 hours. The weather was 70 degrees sunny, 58% humidity and winds WNW 13 mph.

The 2HU-4HU wells were drilled in 2016 and are currently in production. The 5HU well was spud, then plugged in December 2016.

The access road, well pad and associated controls were inspected. A compressor unit appears to have been installed on the SE corner of the well pad. Large puddles were observed on the pad surface from recent heavy rains. All puddles on teh pad surface measured <300mS/cm(Photo#3). The fluid in teh duck pond containment had a field measured conductivity of 300uS/cm. JKLM representatives were contact and a vac truck was dispatched to the site. The elevated conductivity fluid was removed.

A violation of 25 Pa Code 78a.56(a) is cited as IMMEDIATELY CORRECTED against the 2HU well API#105-21855 due to the remediation of the elevated conductivity fluid by a vac truck during the inspection.

I departe

2804689 Primary Facility 2018-11-19 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. There are two (2) annulus vents openly venting on this well. Annulus vent intermediate x intermediate 2 (13 3/8"x 9 5/8") was venting 100% LEL (lower explosion limit) and 29% METHANE combustible gas. Although the Intermediate 2 casing string was not cemented to surface under an approved alternate method, combustible gas detected at this annulus indicates potential defective cement. JKLM should monitor combustible gas levels at this annulus on a monthly basis and report any significant changes to the Department as soon as possible. No other annulus vents were noted venting at this inspection. No violations noted at the time of this inspection.
2822376 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection conducted a routine inspection of the JKLM Sweden Valley 101 Well Pad located in Summit Twp, Potter Co. on 1/2/2019 @1115 hours. The weather 32 degrees, cloudy, 78% humidity winds, S @5mph. The site appears to be set up for production.

Empty production tanks appear to be stored around the perimeter of the site. Puddles observed on the pad surface were field screened for conductivity and found to be within normal range. No violations are noted at this time. We departed the site at 1200 hours.

2845851 Primary Facility 2019-02-27 Routine/Complete Inspection No Violations Noted At the time of this inspection this well as in production. A digital gauge was indicating a psi (pounds per square inch) of 1081. There are two annulus vents that are vented to surface and were tested for combustible gas with an Altair 5 x Multi Gas Meter. This gas meter was calibrated on 2-20-19. Results of this testing were 100% LEL ( lower explosion limit) and 4% Methane on the 13 3/8" x 9 5/8" vent and 0% LEL and 0% Methane on the 9 5/8" x 5 1/2" vent. No violations noted at this inspection.

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/28/2016 09/06/2016 11586 10,440,300.0 0
2 08/12/2016 08/20/2016 11535 10,775,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid Inhibitor, KAI-13 Keane Acid Inhibitor propan-2-ol 67-63-0 5 0.000159394 151.231
Cinnamaldehyde 104-55-2 10 0.000318789 302.462
formic acid 64-18-6 10 0.000318789 302.462
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000637578 604.924
ethanediol 107-21-1 40 0.00127516 1209.85
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.000318789 302.462
Ethoxylated alcohol Proprietary 10 0.000318789 302.462
Ceramic Proppant, Econoprop Keane Proppant Ceramic materials and wares, chemicals 66402-68-4 100 5.21178 4,944,860.0
Water JKLM Energy Carrier/Base Fluid Water 7732-18-5 100 91.8271 87,124,100.0
Friction Reducer, KFR-23 Keane Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 20 0.018812 17848.6
Water 7732-18-5 50 0.0470301 44621.4
copolymer of 2-propenamide Proprietary 20 0.018812 17848.6
alcohols, C12-16, ethoxylated 68551-12-2 2 0.0018812 1784.86
oleic acid diethanolamide 93-83-4 2 0.0018812 1784.86
Iron Control, KFEAC-30 Keane Iron Control acetic acid 64-19-7 60 0.0026908 2552.98
Citric acid 77-92-9 40 0.00179386 1701.99
Hydrochloric Acid (7.5%) Keane Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0582533 55269.8
Water 7732-18-5 92.5 0.718457 681661
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 2.0827 1,976,030.0
2 Friction Reducer, KFR-23 Keane Friction Reducer Water 7732-18-5 50 0.0459821 47212.5
oleic acid diethanolamide 93-83-4 2 0.00183928 1888.5
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0183928 18885
alcohols, C12-16, ethoxylated 68551-12-2 2 0.00183928 1888.5
copolymer of 2-propenamide Proprietary 20 0.0183928 18885
Acid Inhibitor, KAI-13 Keane Acid Inhibitor Cinnamaldehyde 104-55-2 10 0.000348134 357.45
propan-2-ol 67-63-0 5 0.000174067 178.725
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.000348134 357.45
ethanediol 107-21-1 40 0.00139254 1429.8
Ethoxylated alcohol Proprietary 10 0.000348134 357.45
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000696268 714.899
formic acid 64-18-6 10 0.000348134 357.45
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.4729 11,779,900.0
Iron Control, KFEAC-30 Keane Iron Control Citric acid 77-92-9 40 0.00195899 2011.41
acetic acid 64-19-7 60 0.00293849 3017.12
Water JKLM Energy Carrier/Base Fluid Water 7732-18-5 100 87.5786 89,922,100.0
Hydrochloric Acid (7.5%) Keane Acidizing Water 7732-18-5 92.5 0.784545 805539
Hydrochloric Acid 7647-01-0 7.5 0.0636118 65313.9

For data sources see[7]

References