X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-105-21865

Well Details

Well ID: 37-105-21865
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Sweden Township
Operator Name: JKLM ENERGY LLC
Well Pad ID: 153661
Farm/Lease Name: REESE HOLLOW 117 2HU
License Status: Active
Spud Date: 07/23/2016
Permit Date: 5/6/2016
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.800210
Longitude: -77.959560

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 JKLM ENERGY LLC 0.00 0 0.00 0 0.00 0
2017 JKLM ENERGY LLC 470,210.00 76 0.00 0 0.00 0
2018 JKLM ENERGY LLC 980,192.00 365 0.00 0 0.00 0
2019 JKLM ENERGY LLC 115,678.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2016-2 Drill Cuttings (in Tons) RWC 810 1,585.75 Tons LANDFILL 301358
2016-2 Drilling Fluid Waste (in Barrels) RWC 803 668.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016-2 Other Oil & Gas Wastes (in Barrels) RWC 899 2,435.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016-2 Other Oil & Gas Wastes (in Barrels) RWC 899 127.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016-2 Other Oil & Gas Wastes (in Barrels) RWC 899 380.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-2 Produced Fluid (in Barrels) RWC 802 352.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016-2 Produced Fluid (in Barrels) RWC 802 26.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-01 Drill Cuttings (in Tons) RWC 810 495.50 Tons LANDFILL 301358
2017-01 Other Oil & Gas Wastes (in Barrels) RWC 899 90.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2017-01 Other Oil & Gas Wastes (in Barrels) RWC 899 522.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-01 Other Oil & Gas Wastes (in Barrels) RWC 899 57.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-01 Synthetic Liner Materials (in Tons) RWC 806 2.50 Tons LANDFILL 301358
2017-02 Drill Cuttings (in Tons) RWC 810 74.00 Tons LANDFILL 301358
2017-02 Drilling Fluid Waste (in Barrels) RWC 803 1,456.50 Bbl REUSE (AT WELL PAD)
2017-02 Other Oil & Gas Wastes (in Barrels) RWC 899 698.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-02 Produced Fluid (in Barrels) RWC 802 220.00 Bbl REUSE (AT WELL PAD)
2017-03 Other Oil & Gas Wastes (in Barrels) RWC 899 141.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-03 Other Oil & Gas Wastes (in Barrels) RWC 899 26.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-04 Other Oil & Gas Wastes (in Barrels) RWC 899 840.00 Bbl REUSE (AT WELL PAD)
2017-04 Produced Fluid (in Barrels) RWC 802 463.00 Bbl REUSE (AT WELL PAD)
2017-05 Other Oil & Gas Wastes (in Barrels) RWC 899 973.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-05 Other Oil & Gas Wastes (in Barrels) RWC 899 33.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-05 Other Oil & Gas Wastes (in Barrels) RWC 899 341.00 Bbl REUSE (AT WELL PAD)
2017-05 Produced Fluid (in Barrels) RWC 802 447.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-05 Synthetic Liner Materials (in Tons) RWC 806 17.00 Tons LANDFILL 301358
2017-06 Produced Fluid (in Barrels) RWC 802 35.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-07 Other Oil & Gas Wastes (in Barrels) RWC 899 110.00 Bbl REUSE (AT WELL PAD)
2017-07 Produced Fluid (in Barrels) RWC 802 318.00 Bbl REUSE (AT WELL PAD)
2017-08 Other Oil & Gas Wastes (in Barrels) RWC 899 144.75 Bbl REUSE (AT WELL PAD)
2017-08 Produced Fluid (in Barrels) RWC 802 804.50 Bbl REUSE (AT WELL PAD)
2017-08 Synthetic Liner Materials (in Tons) RWC 806 17.25 Tons LANDFILL 301358
2017-09 Produced Fluid (in Barrels) RWC 802 1,517.50 Bbl REUSE (AT WELL PAD)
2017-10 Produced Fluid (in Barrels) RWC 802 7,590.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-10 Produced Fluid (in Barrels) RWC 802 15,651.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-10 Produced Fluid (in Barrels) RWC 802 846.00 Bbl REUSE (AT WELL PAD)
2017-10 Produced Fluid (in Tons) RWC 802 45.00 Tons LANDFILL 301358
2017-11 Produced Fluid (in Barrels) RWC 802 9,133.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-11 Produced Fluid (in Barrels) RWC 802 31.00 Bbl REUSE (AT WELL PAD)
2017-11 Synthetic Liner Materials (in Tons) RWC 806 1.00 Tons LANDFILL 301358
2017-12 Produced Fluid (in Barrels) RWC 802 208.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017-12 Produced Fluid (in Barrels) RWC 802 128.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-12 Produced Fluid (in Barrels) RWC 802 180.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-12 Produced Fluid (in Barrels) RWC 802 277.50 Bbl REUSE (AT WELL PAD)
2017-12 Produced Fluid (in Tons) RWC 802 11.73 Tons LANDFILL 301358
2018-01 Produced Fluid (in Barrels) RWC 802 399.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018-01 Produced Fluid (in Barrels) RWC 802 64.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018-01 Produced Fluid (in Barrels) RWC 802 56.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-01 Produced Fluid (in Barrels) RWC 802 1,639.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-01 Produced Fluid (in Barrels) RWC 802 1,903.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-01 Produced Fluid (in Barrels) RWC 802 298.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-01 Produced Fluid (in Barrels) RWC 802 228.00 Bbl REUSE (AT WELL PAD)
2018-02 Produced Fluid (in Barrels) RWC 802 2,478.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-02 Produced Fluid (in Barrels) RWC 802 804.00 Bbl REUSE (AT WELL PAD)
2018-03 Produced Fluid (in Barrels) RWC 802 156.25 Bbl REUSE (AT WELL PAD)
2018-04 Produced Fluid (in Barrels) RWC 802 75.00 Bbl REUSE (AT WELL PAD)
2018-05 Produced Fluid (in Barrels) RWC 802 491.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-05 Produced Fluid (in Barrels) RWC 802 390.00 Bbl REUSE (AT WELL PAD)
2018-05 Produced Fluid (in Tons) RWC 802 4.11 Tons LANDFILL 301358
2018-06 Other Oil & Gas Wastes (in Barrels) RWC 899 212.50 Bbl REUSE (AT WELL PAD)
2018-06 Produced Fluid (in Barrels) RWC 802 147.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-06 Produced Fluid (in Barrels) RWC 802 1,512.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-06 Produced Fluid (in Barrels) RWC 802 30.00 Bbl REUSE (AT WELL PAD)
2018-07 Produced Fluid (in Barrels) RWC 802 315.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018-07 Produced Fluid (in Barrels) RWC 802 47.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018-07 Produced Fluid (in Barrels) RWC 802 163.88 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-07 Produced Fluid (in Barrels) RWC 802 353.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-07 Produced Fluid (in Barrels) RWC 802 1,477.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-07 Produced Fluid (in Barrels) RWC 802 648.75 Bbl REUSE (AT WELL PAD)
2018-08 Other Oil & Gas Wastes (in Barrels) RWC 899 148.57 Bbl REUSE (AT WELL PAD)
2018-08 Produced Fluid (in Barrels) RWC 802 7,655.36 Bbl REUSE (AT WELL PAD)
2018-09 Other Oil & Gas Wastes (in Barrels) RWC 899 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-09 Produced Fluid (in Barrels) RWC 802 53.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-09 Produced Fluid (in Barrels) RWC 802 175.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-09 Produced Fluid (in Barrels) RWC 802 3,570.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-09 Produced Fluid (in Barrels) RWC 802 1,688.33 Bbl REUSE (AT WELL PAD)
2018-10 Produced Fluid (in Barrels) RWC 802 656.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018-10 Produced Fluid (in Barrels) RWC 802 6,050.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-11 Produced Fluid (in Barrels) RWC 802 417.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-11 Produced Fluid (in Barrels) RWC 802 2,421.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-11 Synthetic Liner Materials (in Tons) RWC 806 10.09 Tons LANDFILL 301358
2018-11 Waste Water Treatment Sludge (in Tons) RWC 804 0.02 Tons LANDFILL 301358
2018-12 Produced Fluid (in Barrels) RWC 802 1,437.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-12 Produced Fluid (in Barrels) RWC 802 690.25 Bbl REUSE (AT WELL PAD)
2018-12 Waste Water Treatment Sludge (in Tons) RWC 804 3.21 Tons LANDFILL 301358
2019-01 Produced Fluid (in Barrels) RWC 802 217.50 Bbl REUSE (AT WELL PAD)
2019-01 Waste Water Treatment Sludge (in Tons) RWC 804 8.90 Tons LANDFILL 301358
2019-02 Other Oil & Gas Wastes (in Barrels) RWC 899 55.00 Bbl REUSE (AT WELL PAD)
2019-02 Produced Fluid (in Barrels) RWC 802 345.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-02 Produced Fluid (in Barrels) RWC 802 2,502.50 Bbl REUSE (AT WELL PAD)
2019-02 Synthetic Liner Materials (in Tons) RWC 806 2.10 Tons LANDFILL 301358
2019-02 Waste Water Treatment Sludge (in Tons) RWC 804 7.45 Tons LANDFILL 301358
2019-03 Other Oil & Gas Wastes (in Barrels) RWC 899 17.06 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019-03 Other Oil & Gas Wastes (in Barrels) RWC 899 495.00 Bbl REUSE (AT WELL PAD)
2019-03 Produced Fluid (in Barrels) RWC 802 48.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019-03 Produced Fluid (in Barrels) RWC 802 177.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019-03 Produced Fluid (in Barrels) RWC 802 1,567.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-03 Produced Fluid (in Barrels) RWC 802 55.00 Bbl REUSE (AT WELL PAD)
2019-03 Waste Water Treatment Sludge (in Tons) RWC 804 4.45 Tons LANDFILL 301358

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2492244 Primary Facility 2016-06-10 Routine/Partial Inspection No Violations Noted Preconstruction meeting for the Reese Hollow 117 well site. JKLM, New Growth Resources and J.L. Watts were present. New Growth Resources will be conducting logging/chipping operations and J.L. Watts is the construction contractor. The site will consist of improvement of a 6,000' pre-existing access road, a 350' x 500' well pad and two sediment traps. Four wells have been permitted (Reese Hollow 117 1HU - 4HU). Logging operations are anticipated to begin in the near term. TLT
2504107 Primary Facility 2016-07-22 Preoperation Inspection No Violations Noted Pre-spud inspection. Drainage controls in place. Soil temporarily stabilized.
2509726 Primary Facility 2016-08-08 Routine/Complete Inspection No Violations Noted
2513827 Primary Facility 2016-08-25 Routine/Complete Inspection No Violations Noted
2535544 Primary Facility 2016-11-02 Routine/Complete Inspection No Violations Noted
2537921 Primary Facility 2016-10-11 Routine/Complete Inspection No Violations Noted
2548297 Primary Facility 2016-12-29 Routine/Partial Inspection No Violations Noted Partial inspection. Site was snow covered. The H&P 500 rig was drilling the 1HU well and will move onto the 4HU well next. The 2HU and 3HU wells have been drilled to total depth. Equipment and materials were staged on containment. Housekeeping appeared to be good. No violations noted during the inspection. TLT
2561590 Primary Facility 2017-02-14 Routine/Complete Inspection No Violations Noted
2601559 Primary Facility 2017-05-17 Routine/Complete Inspection No Violations Noted
2613299 Primary Facility 2017-06-06 Routine/Complete Inspection No Violations Noted
2613334 Primary Facility 2017-06-20 Routine/Complete Inspection No Violations Noted
2626406 Primary Facility 2017-08-10 Routine/Complete Inspection No Violations Noted
2633250 Primary Facility 2017-08-22 Routine/Complete Inspection No Violations Noted 20x13 vented/conductor x surface = 0 LEL and 0 METHANE/volume

13x9 vented/ intermediate x surface = 0 LEL and 0 METHANE/ volume

9x5 vented / intermediate x production = 0 LEL and 0 METHANE/ volume.

At the time of this inspection bubbling was observed around the bottom wellhead assembly flange. This was determined to be a welded bead break where the flange was connected to the surface casing. This has been corrected and the bubbling is no longer present

2705637 Primary Facility 2018-03-08 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. All annulus vents , flow lines, and fittings were tested for gas . Results of this testing was that no gas was detected on the wellhead assembly or the well area.
2721152 Primary Facility 2018-04-19 Routine/Complete Inspection No Violations Noted Minimal activity on site when I arrived. I met Sean Bacha, production consultant for JKLM. AST present on the site, filled to within 8-10' of the top. Secondary tank contained little to no water. Puddles on the pad and around the tank showed conductance from .19-.38 mS/cm. Puddles immediately in front of the offloading area for the tank were slightly higher (.85-2.15 mS/cm). A bank of Baker tanks was also present on the site; Sean informed me that the produced water from the pad had been going to SWEPI, but at present they are not taking any. Overall, site looked good; however, I was unable to locate any well tags on the wells. I recommend that tags be affixed ASAP, or if they were present, that they be made more visible and obvious.
2742327 Primary Facility 2018-06-14 Routine/Complete Inspection No Violations Noted The DEP conducted a ROUTINE inspection of the JKLM – Reese Hollow 117 on 6/14/2018 @1245 hours. The weather was 70 degrees, 38% humidity, winds WNW 20 mph. The well site is currently in production.

The site was last inspected by company personnel on 6/14/2018 with the comment “elevated conductivity readings recorded in two areas outside of containment.”

A puddle was observed along the edge of containment in front of the AST load/offload area. The puddle had a field measured conductivity of 2.9 -3.5 mS/cm (see photo #2). Fluid inside the larger containment was measured at 9.04 mS/cm (photo #3) and “Or” in the smaller duck pond containment (photo #4 and #5). A smaller duck pond containment was laying adjacent to the AST with a field measured conductivity of “Or” or over range (photo #7).

A puddle was observed on the pad surface in front of the tank battery with a field measured conductivity of 3.73mS/cm (photo #9 and #10). A vac truck driver was located onsite. I informed him of the areas with elevated cond

2746426 Primary Facility 2018-06-27 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. No violations were noted at the time of this inspection.
2765855 Primary Facility 2018-08-20 Routine/Complete Inspection No Violations Noted I arrived on the site and met Sean Bacha, consultant for JKLM. Little activity was occurring on the pad. Puddles around the offloading area for the MASS showed low conductance (.53-.75 mS/cm); water in the containment itself was slightly higher (.87 mS/cm), and was within 2-3" of the top of the berm. A vac truck was already on location, and Sean informed me that it would be vaccing this containment. The MASS was fairly full, with approximately 3-3 1/2' of freeboard, and the secondary containment had no standing water. On the remainder of the pad, all puddles showed low conductance (.33-.68 mS/cm).
2768261 Primary Facility 2018-08-28 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. A digital gauge on the 3" production line leaving the well head assembly and going to the production equipment read 1185 psi (pounds per square inch) at this inspection. No violations noted at this inspection.
2803152 Primary Facility 2018-11-14 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. There are four (4) annulus vents openly venting on this well. Annulus vent surface x intermediate (20" x 13 3/8") was noted venting 100% LEL (lower explosion limit) and 94% METHANE and annulus vent intermediate two (2) x intermediate one (1) (13 3/8" x 9 5/8" ) was noted venting 100% LEL (lower explosion limit) and 5% METHNE combustible gas at this inspection. Combustible gas detected at these annuli indicates potential defective cement. JKLM should monitor both annulus vents on a monthly basis and report any significant changes to the Department as soon as possible. The Department will continue to monitor all annulus vents at this well during future inspections. No other annulus vents were noted venting at this inspection. No violations noted at the time of this inspection.

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/30/2017 07/11/2017 11099 18,321,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HydroProp (Proppant) Keane Proppant Ceramic materials and wares, chemicals 66402-68-4 100 61.3347 248,289,000.0
KFR-23 Keane Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0182941 74056.5
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.000813073 3291.4
oleic acid diethanolamide 93-83-4 2 0.000813073 3291.4
copolymer of 2-propenamide Proprietary 10 0.00406537 16457
Hydrochloric Acid (7.5%) Keane Acid Inhibitor Hydrochloric Acid 7647-01-0 7.5 0.0208579 84434.7
Water 7732-18-5 92.5 0.257247 1,041,360.0
Other Chemical(s) Listed Above See Trade Name(s) List prop-2-yn-1-ol 107-19-7 5 0.00002975 120.418
Citric acid 77-92-9 40 0.00048331 1956.48
isoproyl alcohol 67-63-0 5 0.00002975 120.418
oleic acid diethanolamide 93-83-4 2 0.000813073 3291.4
copolymer of 2-propenamide Proprietary 10 0.00406537 16457
ethylbenzene 100-41-4 1 0.00000595 24.084
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00002975 120.418
Fatty imidazoline 61790-69-0 5 0.00002975 120.418
Water 7732-18-5 92.5 0.257247 1,041,360.0
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.000813073 3291.4
xylene 1330-20-7 5 0.00002975 120.418
KFEAC-30 Keane Iron Control acetic acid 64-19-7 60 0.000724964 2934.73
Citric acid 77-92-9 40 0.00048331 1956.48
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 37.768 152,889,000.0
KAI-12 Keane Acid Inhibitor Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00002975 120.418
Fatty imidazoline 61790-69-0 5 0.00002975 120.418
isoproyl alcohol 67-63-0 5 0.00002975 120.418
prop-2-yn-1-ol 107-19-7 5 0.00002975 120.418
ethylbenzene 100-41-4 1 0.00000595 24.084
xylene 1330-20-7 5 0.00002975 120.418
Methanol 67-56-1 90 0.000535444 2167.53
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 0.576764 2,334,800.0

For data sources see[7]

References