If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21195 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.655542,"lon":-75.960333,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149374 | |
Farm/Lease Name: STONE UNIT 5H | |
License Status: Active | |
Spud Date: 04/04/2013 | |
Permit Date: 3/25/2013 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.655542 | |
Longitude: -75.960333 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | 1,212,185.00 | 122 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 1,630,857.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 793,586.94 | 346 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 529,218.59 | 273 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 517,496.12 | 361 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 176,493.76 | 297 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 30,992.59 | 82 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2013-1 | Drill Cuttings (in Tons) | 724.41 Tons | LANDFILL | 100933 |
2013-1 | Drilling Fluid Waste (in Barrels) | 889.10 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC006 |
2013-2 | Fracing Fluid Waste (in Barrels) | 2,534.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2013-2 | Fracing Fluid Waste (in Barrels) | 2,473.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-2 | Produced Fluid (in Barrels) | 280.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-1 | Produced Fluid (in Barrels) | 294.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-2 | Drill Cuttings (in Tons) | 79.26 Tons | LANDFILL | 100933 |
2015-1 | Produced Fluid (in Barrels) | 90.36 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-2 | Produced Fluid (in Barrels) | 211.01 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-1 | Drill Cuttings (in Tons) RWC 810 | 19.44 Tons | LANDFILL | 100933 |
2016-1 | Drill Cuttings (in Tons) RWC 810 | 10.21 Tons | LANDFILL | 301358 |
2016-1 | Produced Fluid (in Barrels) RWC 802 | 184.16 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-2 | Produced Fluid (in Barrels) RWC 802 | 270.54 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017-02 | Produced Fluid (in Barrels) RWC 802 | 21.98 Bbl | REUSE (AT WELL PAD) | |
2017-05 | Produced Fluid (in Barrels) RWC 802 | 32.06 Bbl | REUSE (AT WELL PAD) | |
2017-11 | Produced Fluid (in Barrels) RWC 802 | 23.16 Bbl | REUSE (AT WELL PAD) | |
2018-01 | Produced Fluid (in Barrels) RWC 802 | 6.20 Bbl | REUSE (AT WELL PAD) | |
2018-05 | Produced Fluid (in Barrels) RWC 802 | 11.27 Bbl | REUSE (AT WELL PAD) | |
2018-07 | Produced Fluid (in Barrels) RWC 802 | 60.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018-07 | Produced Fluid (in Barrels) RWC 802 | 231.73 Bbl | REUSE (AT WELL PAD) | |
2018-10 | Produced Fluid (in Barrels) RWC 802 | 50.12 Bbl | REUSE (AT WELL PAD) | |
2018-11 | Produced Fluid (in Barrels) RWC 802 | 31.31 Bbl | REUSE (AT WELL PAD) | |
2019-01 | Produced Fluid (in Barrels) RWC 802 | 59.06 Bbl | REUSE (AT WELL PAD) | |
2019-03 | Produced Fluid (in Barrels) RWC 802 | 39.82 Bbl | REUSE (AT WELL PAD) |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2164537 | Primary Facility | 05/06/2013 | Drilling/Alteration | No Violations Noted | Cinductor set - rec'd spud notification 4/4/13. Skidding rig over for re-entry on or approx 5/7/13 |
2219338 | Primary Facility | 11/06/2013 | Routine/Complete Inspection | No Violations Noted | Well drilled/fract and flowing |
2318008 | Primary Facility | 10/28/2014 | Drilling/Alteration | No Violations Noted | |
2441779 | Primary Facility | 2016-01-16 | Routine/Complete Inspection | No Violations Noted | Inspection of the Stone Unit Pad for current or potential E&S issues due to a recent drilling permit application for the #3H well. The site is less than 5 acres. The site is stable, vegetation coverage around the pad and access is stable, and no erosion issues were observed. The PCMS controls appear to be installed according to the 2010 E&S and restoration plans. They basically consist of a drainage channel around the pad that drains on both sides to a sediment basin and appear to be functioning properly. The access road is in good condition and the PCSMs (drainage channel and culverts, and etc) are in place according to the plans referenced above with no apparent problems. |
2485158 | Primary Facility | 2016-05-11 | Routine/Complete Inspection | No Violations Noted | |
2491273 | Primary Facility | 2016-06-02 | Follow-up Inspection | No Violations Noted | I conducted an inspection of the site accompanied by Scott Kuchta, DEP O&G WQS. A coiled tubing unit is on the location. Shortly after our arrival at 10:30, wet met with Gilbert Blevins, site company man, consultant of Chief. Mr. Blevins stated the following information. "We just finished drilling out frac plugs on the 3H well. We started to drill out the plugs yesterday. There were (12) frac plugs drilled out. The plugs were drilled out at a rate of (15) barrels an hour, (3) barrels in 3.25 hours. The Rain for Rent frac tanks contain water from the frac plug drill out process and water used during the frac. The frac job was completed last week. All of the wells are currently shut in."
Chief submitted a stimulation notification to the Department on 5-18-16. The notification indicated stimulation of the Stone Unit 3H would commence on 5/24/16 at 6:00 AM. According to our records, there are (8) wells drilled on the pad. The 2H, 1V, 5H and 4H wells were in production. The 6H, 7H and 8H have been |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/25/2013 | 07/27/2013 | 7504 | 4,315,000.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | BA-40L | Halliburton | Buffering Agent | Potassium Carbonate | 584-08-7 | 60 | 0.001 | 0 |
Water | Provided by Customer | Base Fluid | Fresh Water | 0000-00-0 | 100 | 99.9 | 0 | |
FR-66 | Halliburton | Friction Reducer | Hydrotreated Light Petroleum Distillate | 64742-47-8 | 30 | 0.03 | 0 | |
Hydrochloric Acid 10-30% | Halliburton | Acid | Hydrochloric Acid | 7647-01-0 | 30 | 0.08 | 0 | |
Gyptron T-390 | Champion Technologies | Scale Inhibitor | Methanol | 67-56-1 | 10 | 0.001 | 0 | |
Bactron K-139 | Champion Technologies | Biocide | Glutaraldehyde | 111-30-8 | 5 | 0.002 | 0 | |
Quaternary ammonium compounds, benzyl-C-12-16 alkyldimethyl, chlorides | 68424-85-1 | 10 | 0.004 | 0 | ||||
Ethanol | 64-17-5 | 5 | 0.002 | 0 |
For data sources see[7]