X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22017

Well Details

Well ID: 37-115-22017
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 152645
Farm/Lease Name: FERGUSON A 1
License Status: Active
Spud Date: 09/01/2015
Permit Date: 6/11/2015
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.741103
Longitude: -75.699092

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 2,208,561.39 108 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 4,651,361.17 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 2,425,791.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 480,185.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2016-1 Drill Cuttings (in Tons) RWC 810 1,962.68 Tons LANDFILL 101247
2016-1 Drilling Fluid Waste (in Barrels) RWC 803 121.10 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016-1 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 4.63 Tons LANDFILL THR029
2016-1 Synthetic Liner Materials (in Tons) RWC 806 18.57 Tons LANDFILL 101247
2016-2 Fracturing Fluid Waste (in Barrels) RWC 805 8,115.42 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE004
2016-2 Fracturing Fluid Waste (in Barrels) RWC 805 353.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016-2 Fracturing Fluid Waste (in Barrels) RWC 805 13,403.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016-2 Fracturing Fluid Waste (in Barrels) RWC 805 656.67 Bbl REUSE OTHER THAN ROAD SPREADING
2016-2 Other Oil & Gas Wastes (in Tons) RWC 899 0.05 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2016-2 Produced Fluid (in Barrels) RWC 802 3,021.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE004
2016-2 Produced Fluid (in Barrels) RWC 802 642.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016-2 Synthetic Liner Materials (in Tons) RWC 806 12.19 Tons LANDFILL 101247
2016-2 Waste Water Treatment Sludge (in Tons) RWC 804 30.21 Tons LANDFILL 100933
2017-01 Produced Fluid (in Barrels) RWC 802 139.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-01 Produced Fluid (in Barrels) RWC 802 253.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-02 Produced Fluid (in Barrels) RWC 802 76.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-02 Produced Fluid (in Barrels) RWC 802 211.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-02 Waste Water Treatment Sludge (in Tons) RWC 804 0.50 Tons LANDFILL 301358
2017-03 Produced Fluid (in Barrels) RWC 802 27.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-03 Produced Fluid (in Barrels) RWC 802 243.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-04 Produced Fluid (in Barrels) RWC 802 25.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-04 Produced Fluid (in Barrels) RWC 802 179.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-04 Synthetic Liner Materials (in Tons) RWC 806 0.25 Tons LANDFILL 101247
2017-05 Produced Fluid (in Barrels) RWC 802 208.97 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-06 Produced Fluid (in Barrels) RWC 802 13.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-06 Produced Fluid (in Barrels) RWC 802 149.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-07 Produced Fluid (in Barrels) RWC 802 9.82 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-07 Produced Fluid (in Barrels) RWC 802 91.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-08 Produced Fluid (in Barrels) RWC 802 110.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-08 Produced Fluid (in Barrels) RWC 802 31.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-09 Produced Fluid (in Barrels) RWC 802 142.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-10 Produced Fluid (in Barrels) RWC 802 107.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-11 Produced Fluid (in Barrels) RWC 802 125.51 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-12 Produced Fluid (in Barrels) RWC 802 87.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-12 Produced Fluid (in Barrels) RWC 802 14.64 Bbl REUSE (AT WELL PAD)
2017-12 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 0.06 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018-01 Produced Fluid (in Barrels) RWC 802 51.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-01 Produced Fluid (in Barrels) RWC 802 27.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018-01 Produced Fluid (in Barrels) RWC 802 13.79 Bbl REUSE (AT WELL PAD)
2018-02 Produced Fluid (in Barrels) RWC 802 75.82 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-03 Produced Fluid (in Barrels) RWC 802 12.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-03 Produced Fluid (in Barrels) RWC 802 25.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-03 Produced Fluid (in Barrels) RWC 802 25.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018-03 Produced Fluid (in Barrels) RWC 802 12.57 Bbl REUSE (AT WELL PAD)
2018-04 Produced Fluid (in Barrels) RWC 802 66.94 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-04 Produced Fluid (in Barrels) RWC 802 15.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-04 Produced Fluid (in Barrels) RWC 802 15.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018-05 Produced Fluid (in Barrels) RWC 802 45.96 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-05 Produced Fluid (in Barrels) RWC 802 11.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-05 Produced Fluid (in Barrels) RWC 802 4.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018-06 Produced Fluid (in Barrels) RWC 802 30.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-06 Produced Fluid (in Barrels) RWC 802 45.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-07 Produced Fluid (in Barrels) RWC 802 17.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-07 Produced Fluid (in Barrels) RWC 802 69.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-08 Produced Fluid (in Barrels) RWC 802 85.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-09 Produced Fluid (in Barrels) RWC 802 68.18 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-10 Produced Fluid (in Barrels) RWC 802 39.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-11 Produced Fluid (in Barrels) RWC 802 59.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-12 Produced Fluid (in Barrels) RWC 802 17.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-12 Produced Fluid (in Barrels) RWC 802 11.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019-01 Produced Fluid (in Barrels) RWC 802 28.21 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019-02 Produced Fluid (in Barrels) RWC 802 27.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019-03 Produced Fluid (in Barrels) RWC 802 15.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019-03 Produced Fluid (in Barrels) RWC 802 16.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2403895 Primary Facility 08/26/2015 Preoperation Inspection No Violations Noted On 8/26/15, the Department conducted a Preoperational inspection of the Cabot Ferguson A Pad located in Harford Township, Susquehanna County. The well pad is approximately 98% complete with all E&S BMP’s installed per plan to include minor red lined additions. All fill slopes rock lined, cut slopes seeded and mulched with crews actively installing erosion control blankets. No violations noted. The well permits that have been issued for the pad are: Ferguson A 1H(115-22017), 3H(115-22018), 5H(115-22019), 7H(115-22020), 9H(115-22021), and the 11H(115-22022).
2404083 Primary Facility 09/02/2015 Drilling/Alteration No Violations Noted
2412630 Primary Facility 09/15/2015 Routine/Complete Inspection No Violations Noted 6 wells on location with conductor's/mousehole's set.
2419990 Primary Facility 10/28/2015 Routine/Complete Inspection No Violations Noted
2430486 Primary Facility 12/07/2015 Routine/Complete Inspection No Violations Noted The Department conducted an inspection of the Cabot Ferguson A Pad located in Harford Township, Susquehanna County. The well permits that have been issued for the pad are: Ferguson A 1H(115-22017), 3H(115-22018), 5H(115-22019), 7H(115-22020), 9H(115-22021), and the 11H(115-22022). The Precision Drilling Rig 569 is on-site and actively drilling the 5H. E&S BMP’s still in place and appears to be functioning properly. New seeded vegetation looks good. No violations noted.
2437404 Primary Facility 2016-01-04 Drilling/Alteration No Violations Noted
2444415 Primary Facility 2016-01-26 Incident- Response to Accident or Event No Violations Noted Steve Watson, Environmental Health and Safety Specialist of Cabot Oil and Gas contacted PADEP Northeast Regional Office Emergency Response Team at 4:45 PM on 1/25/16 to report the discovery of staining on the pad surface on 1/25/16. NERO ERT contacted the Scranton District Office at 9:10 AM on 1/26/16 to report the discovery. Gene Rickard and I arrived at the site at 11:30 to conduct an inspection. There was no activity or personnel at the site as we arrived. Shortly upon arrival we observed an area of dark staining at N- 41.74130°; W- 75.69933°, on the pad surface near where Diaz roll-off containers were stored on containment. The substance had a petroleum odor to it. Andy Mehalko of Cabot indicated that Cabot had discovered the staining while in the process of removing the liner from the pad surface used during drilling operations. It is believed that the staining was a result of compromised liner integrity and consisted of a mixture of oil and water based drilling mud.
2446899 Primary Facility 2016-02-03 Routine/Complete Inspection No Violations Noted
2468429 Primary Facility 2016-03-26 Routine/Complete Inspection No Violations Noted
2489246 Primary Facility 2016-06-01 Routine/Complete Inspection No Violations Noted
2495516 Primary Facility 2016-06-23 Drilling/Alteration No Violations Noted
2496559 Primary Facility 2016-06-28 Routine/Complete Inspection No Violations Noted
2507148 Primary Facility 2016-08-02 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 9:25a.m., Pumpco Services was on site and fracturing the wells. I took a walk around the tank farm and all the tanks were on containment and the containment was in good condition. They were pumping water through a 12" plastic line from the lower pad to the upper pad. I met with company men Rafael Rodriguez, Larry Fulmer and Jim Crouch, they were fracturing stage 2 on the 9H and running a plug and perforating the 1H.

They have completed: (5 of 32 on the 1H), (5 of 32 on the 3H), (1 of 27 on the 5H), (0 of 18 on the 7H), (1 of 28 on the 9H), and (8 of 35 on the 11H). I took a walk around the location and everything looked OK. I left the site at 10:30a.m.

2527862 Primary Facility 2016-09-26 Routine/Complete Inspection No Violations Noted As I arrived at the site at 11:40, Flowback of the wells was in progress. I initially met with Eric Bronson and Nick White of Rain for Rent on the tank pad of the site. Mr. Bronson and Mr. White stated that there are (28) frac tanks in the tank farm on the tank pad containing fluid. The tanks contain flowback and frac plug drill out water from the wells on this pad. The water was pumped from the well pad to tank pad through a (12) inch HDPE line. The frac tanks are manifolded. The containment for the tank farm on the tank pad appeared to be in good condition. Conductivity was in the range of (9-10) milliSiemens/cm³ in water in the duck pond containment for one of the Rain for Rent pumps in the tank farm.

I met with Donnie Griffith, site company man and consultant of Cabot on the well pad. Mr. Griffith stated the following. "Flowback started on the 9/16/16. All wells are in the process of being flowed back with natural gas sent directly to sales. Flowback of the wells will take place for another week

2530396 Primary Facility 2016-10-19 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:20p.m., the wells were recently completed and are now in production. The cellar had water at the bottom with no bubbling noticed, the (20x13) vent pipe was open and venting into a tank, the (13x9) vent pipe was open and venting into a tank, the (9x5) vent pipe was open and venting into a tank, there was 707psi on the production casing. The well tag was on the well and correct. The production fluid was going into a 500bbl flow back tank that was on containment and the containment was in good condition. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 13:10p.m.

2531661 Primary Facility 2016-10-25 Routine/Complete Inspection No Violations Noted On 10/25/16, the Department conducted an inspection of the COG Ferguson A Pad located in Harford Township, Susquehanna County. The 6 wells associated with this pad, the 1H, 3H, 5H, 7H, 9H, and 11H have been drilled, stimulated, and recently placed into production. Most of the drilling and stimulation temporary containment has been removed from the site. 4 large roll off containers filled with what appears to be virgin frac sand is still present on the pad. All permanent production equipment has been set in place and appears to be functioning. The large top soil stock pile located on the left side of the access road is stable, with moderate vegetative growth. No violations noted.
2619654 Primary Facility 2017-07-27 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 9:00a.m.

The cellar was about half full of water with no bubbling noticed. The (20x13) annulus vent pipe was open and venting into a small plastic tank, the (13x9) annulus vent pipe was open and venting into a small plastic tank, the (9x5) annulus vent pipe was open and venting into a small plastic tank. All the annulus vent pipes were connected to one pipe going into the same tank. There was 554psi on the production casing. I took a walk around the location and there were no obvious concerns noticed. I left the site at 9:50a.m.

2672688 Primary Facility 2017-12-11 Incident- Response to Accident or Event No Violations Noted I arrived at the site at 11:11 in response to a reported spill of an estimated (5-6) gallons of production fluid to the pad surface. I was accompanied by Matt Shope, DEP O&G WQS during the inspection. The weather conditions were mostly cloudy skies, breezy and cold with snow flurries and temperatures around 32 degrees. There was no activity or Cabot personnel at the site during the inspection. There are (7) wells in production, the odd numbered wells, 1H, 3H, 5H, 7H, 9H and 11H. Shortly upon arrival, we observed a drum staged next to the steps of the containment structure for the production fluid tanks. We had suspected that this drum contained impacted material associated with the production fluid spill and the area of impact was in a close proximity to the drum and containment structure. The drum is labeled as non-hazardous waste. The date written on the lid and the label on the side of the drum is 12/8/17. Cabot subcontractor, GasSearch Drilling Services is listed as the shipper. The contents of the mater
2676350 Primary Facility 2017-12-27 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. The well pad stabilization appeared adequate. No violations noted.
2727479 Primary Facility 2018-05-08 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2740050 Primary Facility 2018-06-07 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. No E&S issues were identified. No violations noted.
2808446 Primary Facility 2018-11-29 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. The entire site has been reworked and now reflects the PCSM/Restoration Plan. The tank pad has been eliminated and both infiltration basins have been installed. All site channels are in very good condition. No violations noted.
2827982 Primary Facility 2019-01-16 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was ice 5.5' below grade in the cellar and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank. All gas checks were conducted with a MSA Altair 5X multi gas detector that was calibrated on 1/2/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2838219 Primary Facility 2019-02-06 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Interim restoration activities, to include regrading looks good. Overall the site has good stabilization. No E&S issues identified. No violations noted.

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/29/2016 09/02/2016 7645 12,096,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Petromax Carrier/Base Fluid Water 7732-18-5 100 88.3324 101,095,000.0
Plexcide 15G Chemplex Biocide Alkyl Dimethyl Benzyl Ammonium Chloride 68424-85-1 3 0.000680318 778.614
Glutaraldehyde 111-30-8 14 0.00317482 3633.53
Ethanol 64-17-5 3 0.000680318 778.614
Didecyl Dimethyl Ammonium Chloride 7173-51-5 3 0.000680318 778.614
Chemplex 4-N-1 Chemplex Combination/Iron Control Methyl Alcohol 67-56-1 10 0.000182214 208.542
Diethanolamine 111-42-2 2 0.00003644 41.708
2-Ethylhexanol 104-76-7 10 0.000182214 208.542
Alcohol Ethoxylate Surfactants Proprietary 2 0.00003644 41.708
thiourea-formaldehyde copolymer 68527-49-1 2 0.00003644 41.708
Cocamide Diethanolamine Salt 68603-42-9 2 0.00003644 41.708
n-olefins Proprietary 1 0.00001822 20.854
Propargyl Alcohol 107-19-7 1 0.00001822 20.854
Acetic Acid 64-19-7 85 0.00154882 1772.6
Plexslick 957 Chemplex Friction Reducer Poly (acrylamide-co-acrylic acid), partial sodium salt 62649-23-4 35 0.0263564 30164.5
Ammonium Chloride 12125-02-9 5 0.0037652 4309.21
Paraffinic, Naphtehenic Solvent 64742-47-8 30 0.0225912 25855.2
Nonionic Surfactants Proprietary 1.5 0.00112956 1292.76
15% HCL Reagent Acidizing Hydrochloric Acid 7647-01-0 15 0.04096 46878
Sand (Proppant) TSS Proppant Silica Substrate 14808-60-7 100 11.2706 12,899,000.0
Greenhib 679 Chemplex Friction Reducer Glycerine 56-81-5 20 0.00483782 5536.81
Proprietary Proprietary 35 0.00846618 9689.41

For data sources see[7]

References