37-115-22054

Well Details

Well ID: 37-115-22054
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Jackson Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 145294
Farm/Lease Name: GAYLORD 4H
License Status: Active
Spud Date: 07/26/2016
Permit Date: 9/15/2015
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.864772
Longitude: -75.636592

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 SWN PROD CO LLC 0.00 0 0.00 0 0.00 0
2017 SWN PROD CO LLC 2,062,742.00 213 0.00 0 0.00 0
2018 SWN PROD CO LLC 1,798,559.00 353 0.00 0 0.00 0
2019 SWN PROD CO LLC 388,380.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
16AUGU Drill Cuttings (in Tons) RWC 810 16.62 Tons LANDFILL 101247
16DECU Drill Cuttings (in Tons) RWC 810 406.63 Tons LANDFILL 101247
16DECU Drilling Fluid Waste (in Barrels) RWC 803 445.00 Bbl REUSE OTHER THAN ROAD SPREADING
16DECU Produced Fluid (in Barrels) RWC 802 47.00 Bbl REUSE OTHER THAN ROAD SPREADING
16JULU Drill Cuttings (in Tons) RWC 810 56.04 Tons LANDFILL 101247
16NOVU Drill Cuttings (in Tons) RWC 810 14.71 Tons LANDFILL 101247
16OCTU Drill Cuttings (in Tons) RWC 810 371.87 Tons LANDFILL 101247
16OCTU Fracturing Fluid Waste (in Barrels) RWC 805 440.00 Bbl REUSE OTHER THAN ROAD SPREADING
16OCTU Other Oil & Gas Wastes (in Barrels) RWC 899 50.00 Bbl REUSE OTHER THAN ROAD SPREADING
16OCTU Produced Fluid (in Barrels) RWC 802 17.50 Bbl REUSE OTHER THAN ROAD SPREADING
16SEPU Drill Cuttings (in Tons) RWC 810 29.66 Tons LANDFILL 101247
2016-07 Drill Cuttings (in Tons) RWC 810 56.04 Tons LANDFILL 101247
2016-08 Drill Cuttings (in Tons) RWC 810 16.62 Tons LANDFILL 101247
2016-09 Drill Cuttings (in Tons) RWC 810 29.66 Tons LANDFILL 101247
2016-10 Drill Cuttings (in Tons) RWC 810 371.87 Tons LANDFILL 101247
2016-10 Fracturing Fluid Waste (in Barrels) RWC 805 440.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-10 Other Oil & Gas Wastes (in Barrels) RWC 899 50.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-10 Produced Fluid (in Barrels) RWC 802 17.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016-11 Drill Cuttings (in Tons) RWC 810 14.71 Tons LANDFILL 101247
2016-12 Drill Cuttings (in Tons) RWC 810 406.63 Tons LANDFILL 101247
2016-12 Drilling Fluid Waste (in Barrels) RWC 803 445.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-12 Produced Fluid (in Barrels) RWC 802 47.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017-01 Drilling Fluid Waste (in Barrels) RWC 803 1,500.00 Bbl REUSE (AT WELL PAD)
2017-01 Other Oil & Gas Wastes (in Barrels) RWC 899 3.50 Bbl REUSE (AT WELL PAD)
2017-01 Produced Fluid (in Barrels) RWC 802 110.00 Bbl SURFACE IMPOUNDMENT 826342
2017-01 Servicing Fluid (in Barrels) RWC 808 24.00 Bbl REUSE (AT WELL PAD)
2017-05 Produced Fluid (in Barrels) RWC 802 7,744.33 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-05 Unused Fracturing Fluid Waste (in Barrels) RWC 805 11.38 Bbl LANDFILL THR029
2017-06 Produced Fluid (in Barrels) RWC 802 5,451.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-07 Other Oil & Gas Wastes (in Barrels) RWC 899 49.33 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-07 Produced Fluid (in Barrels) RWC 802 4.17 Bbl REUSE (AT WELL PAD)
2017-07 Produced Fluid (in Barrels) RWC 802 1,643.83 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-07 Synthetic Liner Materials (in Tons) RWC 806 0.63 Tons LANDFILL 100933
2017-08 Produced Fluid (in Barrels) RWC 802 843.17 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-08 Synthetic Liner Materials (in Tons) RWC 806 1.19 Tons LANDFILL 100933
2017-09 Produced Fluid (in Barrels) RWC 802 16.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017-09 Produced Fluid (in Barrels) RWC 802 562.83 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-10 Produced Fluid (in Barrels) RWC 802 6.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017-10 Produced Fluid (in Barrels) RWC 802 387.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-11 Other Oil & Gas Wastes (in Barrels) RWC 899 13.33 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-11 Produced Fluid (in Barrels) RWC 802 264.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017-12 Produced Fluid (in Barrels) RWC 802 261.33 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-01 Other Oil & Gas Wastes (in Barrels) RWC 899 17.33 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-01 Produced Fluid (in Barrels) RWC 802 2,564.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-02 Other Oil & Gas Wastes (in Barrels) RWC 899 21.73 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-02 Produced Fluid (in Barrels) RWC 802 264.83 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-03 Produced Fluid (in Barrels) RWC 802 58.17 Bbl SURFACE IMPOUNDMENT 826342
2018-03 Produced Fluid (in Barrels) RWC 802 149.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-04 Produced Fluid (in Barrels) RWC 802 162.00 Bbl SURFACE IMPOUNDMENT 826342
2018-05 Other Oil & Gas Wastes (in Barrels) RWC 899 18.33 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-05 Produced Fluid (in Barrels) RWC 802 76.00 Bbl SURFACE IMPOUNDMENT 826342
2018-05 Produced Fluid (in Barrels) RWC 802 80.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-06 Produced Fluid (in Barrels) RWC 802 74.00 Bbl REUSE (AT WELL PAD)
2018-06 Produced Fluid (in Barrels) RWC 802 79.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-07 Produced Fluid (in Barrels) RWC 802 116.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-08 Other Oil & Gas Wastes (in Barrels) RWC 899 117.44 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-08 Produced Fluid (in Barrels) RWC 802 19.17 Bbl SURFACE IMPOUNDMENT 826342
2018-08 Produced Fluid (in Barrels) RWC 802 113.33 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-09 Other Oil & Gas Wastes (in Tons) RWC 899 18.33 Tons SURFACE IMPOUNDMENT 95-16-65420-013
2018-09 Produced Fluid (in Barrels) RWC 802 40.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-10 Other Oil & Gas Wastes (in Barrels) RWC 899 9.17 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-10 Produced Fluid (in Barrels) RWC 802 18.33 Bbl REUSE (AT WELL PAD)
2018-10 Produced Fluid (in Barrels) RWC 802 21.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-11 Other Oil & Gas Wastes (in Barrels) RWC 899 18.33 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-11 Produced Fluid (in Barrels) RWC 802 55.67 Bbl REUSE (AT WELL PAD)
2018-12 Produced Fluid (in Barrels) RWC 802 19.00 Bbl REUSE (AT WELL PAD)
2018-12 Produced Fluid (in Barrels) RWC 802 111.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019-01 Other Oil & Gas Wastes (in Barrels) RWC 899 3.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019-01 Produced Fluid (in Barrels) RWC 802 95.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019-02 Produced Fluid (in Barrels) RWC 802 75.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019-03 Produced Fluid (in Barrels) RWC 802 59.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2505103 Primary Facility 2016-07-21 Routine/Partial Inspection No Violations Noted
2528652 Primary Facility 2016-10-17 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 9:45a.m., I met with company man Tony Anthony, Falcon Rig 23 was on site and drilling the vertical section of the well to kick off. I took a walk around the location and there were no obvious concerns noticed.

Depth at time of inspection was 3669'. Projected TD for the top hole section is 5748'. I left the site at 10:40a.m.

2531800 Primary Facility 2016-10-17 Routine/Complete Inspection No Violations Noted Falcon Drilling Rig #23 is currently on the location in the process of drilling the Gaylord 4H well. SWN submitted a drilling resumption After Break of 30 days or more notification to the Department on 10-11-16. The comments in the notice indicate that Falcon 23 will skid 20 feet from the Gaylord 2H to Gaylord 4H on 10-12-16 at 3:30 PM. SWN submitted a casing notification to the Department on 10/11/16. The notice indicated that Falcon 23 will be setting 664' 13-3/8" H-40 48# STC casing and cementing back to surface with Schlumberger services on 10/13/16 at 6:00 AM. I met with Tony Anthony, site company man, consultant of SWN. The current drilling depth is (3,931) feet. Mr. Anthony stated the following. The intermediate casing on the 4H was set at (1,644) feet. The 4H will be drilled to (5,748) feet which is the kickoff point. The well will be loaded with oil based mud once it is drilled to kickoff point (100) feet above kickoff point. The 1H and 2H wells have been drilled to kickoff point. After th
2579234 Primary Facility 2017-04-04 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 9:00a.m.

I met with company men Ken Bush and Mike Tornes. US Well Services was on site to stimulate the 1H, 2H, 4H, 5H, and 6H wells. They were fracturing stage 4 out of 31 stages on the 4H. The 1H and 2H were completed with 25 stages on the 1H and 23 stages on the 2H. The 5H and 6H haven’t been started yet. There will be 57 stages on the 5H and 27 stages on the 6H. The water was being pumped to the site from the Zeffer production water impoundment. I took a walk around the location and there were no obvious concerns noticed. I left the site at 9:40a.m.

2585458 Primary Facility 2017-04-21 Routine/Complete Inspection No Violations Noted Inspection conducted on 4/18/17. Complete circuit of entire site found no violations. Observation of the stimulation operation occurring on the pad identified no spills. No violations observed.
2621159 Primary Facility 2017-08-01 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 11:35a.m.

The well was recently completed and is in production. The well tag was on the well and correct. There was containment around the well and three sealed roll off containers were on the containment, the containment appeared to be in good condition. The cellar was set up with a plastic corrugated pipe around the well for inspection access; there was cement between the (20x13) and (13x9) annuli with no gas detected. The (9x5) annulus vent pipe was open and set up with a Taylor plug to check for pressure with a Crystal pressure gauge, the valve going to the production tank was closed. There was 590psi on the production casing. I took a walk around the location and there were no obvious concerns noticed. I left the site at 12:30p.m.

2660361 Primary Facility 2017-10-25 Routine/Complete Inspection No Violations Noted The Department was on site, to conduct a Routine Complete Inspection, in response to the receipt of a Well Site Restoration report. The site appeared to be reflective of the Restoration Plan therefore the Department acknowledges the Restoration.
2732542 Primary Facility 2018-05-15 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was set up with a corrugated pipe around the well for inspection access. There was cement between the (20x13) and (13x9) annuli and there was no gas detected. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2832953 Primary Facility 2019-01-29 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was set up with a plastic corrugated pipe around the well for inspection access. There was water 3.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar with a MSA Altair 5X multi gas detector that was calibrated on 1/2/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2855233 Primary Facility 2019-03-12 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. As the photo's show, the site is snow covered. Overall the site appears to have good stabilization. No E&S issues identified. No violations noted.

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/03/2017 04/09/2017 6915 9,041,460.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Southwestern Energy Carrier/Base Fluid Water 7732-18-5 100 84.905 75,405,800.0
K-BAC 1005 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.76 0.001694 1504.74
Water 7732-18-5 44.3 0.005317 4721.72
Polyethylene Glycol 25322-68-3 50 0.006721 5968.77
WFRA-2000 U.S. Well Services, LLC Friction Reducer Hydrated light distillate (petroleum) 64742-47-8 30 0.02102 18667.9
2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.025634 22765.7
HCL Acid (12.6%-17.5%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 17.5 0.212743 188941
Water 7732-18-5 87.4 0.915031 812657
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00002600 23.2686
Cinnamaldehyde 104-55-2 20 0.000108 96.2389
Butyl cellosolve 111-76-2 20 0.00009400 83.86
Ethylene glycol 107-21-1 40 0.0003 266.193
Polyether 60828-78-6 10 0.00005200 46.5372
Formic acid 64-18-6 20 0.000105 93.0744
SI-1100 U.S. Well Services, LLC Scale Inhibitor Phosphino carboxylic acid polymer 71050-62-9 3 0.000455 404.298
Hexamethylene tramine penta (methylene phosphonic acid) 34690-00-1 3 0.000455 404.298
Copolymer of Maleic and Acrylic acid 52255-49-9 10 0.001377 1223.26
Ethylene Glycol 107-21-1 40 0.006677 5929.71
Potassium salt of diethylene triamine penta (methylene phosphonic acid) 15827-60-8 3 0.000473 419.848
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 13.8968 12,342,000.0

For data sources see[7]