X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-20316

Well Details

Well ID: 37-117-20316
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Ward Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 148190
Farm/Lease Name: DCNR 587 02 002 01
License Status: Active
Spud Date: 09/14/2009
Permit Date: 6/18/2009
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.698070
Longitude: -76.964602

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 0.00 0.00 0.00
2010 REPSOL OIL & GAS USA LLC 976,437.40 148 0.00 0 0.00 0
2011 REPSOL OIL & GAS USA LLC 1,585,841.00 359 0.00 0 0.00 0
2012 REPSOL OIL & GAS USA LLC 673,502.10 323 0.00 0 0.00 0
2013 REPSOL OIL & GAS USA LLC 539,236.80 364 0.00 0 0.00 0
2014 REPSOL OIL & GAS USA LLC 421,360.10 358 0.00 0 0.00 0
2015 REPSOL OIL & GAS USA LLC 328,445.80 363 0.00 0 0.00 0
2016 REPSOL OIL & GAS USA LLC 262,717.60 364 0.00 0 0.00 0
2017 REPSOL OIL & GAS USA LLC 202,460.40 357 0.00 0 0.00 0
2018 REPSOL OIL & GAS USA LLC 157,110.70 334 0.00 0 0.00 0
2019 REPSOL OIL & GAS USA LLC 36,920.50 86 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-2 Drilling Fluid Waste (in Barrels) 312.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010-2 Produced Fluid (in Barrels) 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2010-2 Produced Fluid (in Barrels) 1,869.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011-1 Drill Cuttings (in Tons) 54.00 Tons LANDFILL NY # 02S17
2011-1 Drill Cuttings (in Tons) 83.00 Tons LANDFILL NY31346244
2011-1 Fracing Fluid Waste (in Barrels) 399.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011-2 Produced Fluid (in Barrels) 429.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2011-2 Produced Fluid (in Barrels) 135.95 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011-2 Produced Fluid (in Barrels) 15.08 Bbl REUSE OTHER THAN ROAD SPREADING
2012-1 Produced Fluid (in Barrels) 36.32 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012-1 Produced Fluid (in Barrels) 25.62 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012-1 Produced Fluid (in Barrels) 552.11 Bbl REUSE OTHER THAN ROAD SPREADING
2012-2 Produced Fluid (in Barrels) 78.01 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012-2 Produced Fluid (in Barrels) 60.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2012-2 Produced Fluid (in Barrels) 147.01 Bbl REUSE OTHER THAN ROAD SPREADING
2013-1 Produced Fluid (in Barrels) 59.97 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2013-1 Produced Fluid (in Barrels) 85.67 Bbl REUSE OTHER THAN ROAD SPREADING
2013-2 Produced Fluid (in Barrels) 266.76 Bbl REUSE OTHER THAN ROAD SPREADING
2014-1 Produced Fluid (in Barrels) 1.12 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014-1 Produced Fluid (in Barrels) 196.28 Bbl REUSE OTHER THAN ROAD SPREADING
2014-2 Produced Fluid (in Barrels) 116.79 Bbl REUSE OTHER THAN ROAD SPREADING
2015-1 Produced Fluid (in Barrels) 84.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015-1 Produced Fluid (in Barrels) 96.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-2 Produced Fluid (in Barrels) 119.64 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015-2 Produced Fluid (in Barrels) 158.65 Bbl REUSE OTHER THAN ROAD SPREADING
2016-1 Produced Fluid (in Barrels) RWC 802 85.37 Bbl REUSE OTHER THAN ROAD SPREADING
2016-2 Produced Fluid (in Barrels) RWC 802 197.95 Bbl REUSE OTHER THAN ROAD SPREADING
2017-02 Produced Fluid (in Barrels) RWC 802 51.77 Bbl REUSE (AT WELL PAD)
2017-04 Produced Fluid (in Barrels) RWC 802 25.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-06 Produced Fluid (in Barrels) RWC 802 50.64 Bbl REUSE (AT WELL PAD)
2017-07 Produced Fluid (in Barrels) RWC 802 8.46 Bbl REUSE (AT WELL PAD)
2017-10 Produced Fluid (in Barrels) RWC 802 48.61 Bbl REUSE (AT WELL PAD)
2017-11 Produced Fluid (in Barrels) RWC 802 17.62 Bbl REUSE (AT WELL PAD)
2017-12 Produced Fluid (in Barrels) RWC 802 42.35 Bbl REUSE (AT WELL PAD)
2018-05 Produced Fluid (in Barrels) RWC 802 49.55 Bbl REUSE (AT WELL PAD)
2018-06 Produced Fluid (in Barrels) RWC 802 36.51 Bbl REUSE (AT WELL PAD)
2018-07 Produced Fluid (in Barrels) RWC 802 25.27 Bbl REUSE (AT WELL PAD)
2018-10 Other Oil & Gas Wastes (in Barrels) RWC 899 12.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-10 Other Oil & Gas Wastes (in Barrels) RWC 899 0.45 Bbl REUSE (AT WELL PAD)
2018-10 Produced Fluid (in Barrels) RWC 802 23.78 Bbl REUSE (AT WELL PAD)
2018-11 Other Oil & Gas Wastes (in Barrels) RWC 899 1.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019-02 Produced Fluid (in Barrels) RWC 802 44.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1823432 Primary Facility 08/25/2009 Routine/Complete Inspection Violation(s) Noted Inspection report and 3rd page NOV sent 8/27/2009 to Eric Potter. Picture of Silt fence included. VIOLS 102.49(b) and 102.4(b)(5) 117-20317,117-20288, &117-20289 same well pad dulpicate inspections. 8/27/2009 MAB
1852919 Primary Facility 12/28/2009 Routine/Complete Inspection No Violations Noted
1919472 Primary Facility 10/12/2010 Follow-up Inspection No Violations Noted Follow up to close violations from August 25, 2009
2047117 Primary Facility 02/23/2012 Routine/Complete Inspection Viol(s) Noted & Immediately Corrected Hyd oil on ground. They put absorbent pads on it
2464225 Primary Facility 2016-03-10 Routine/Partial Inspection No Violations Noted 4 Marcellus Shale wells producing natural gas from this pad
2596680 Primary Facility 2017-05-19 Routine/Partial Inspection No Violations Noted An inspection was conducted of the DCNR 02–002 and compressor station site on May 19, 2017 from approximately 10 AM to approximately 11 AM. Repsol is reminded that weekly inspections are to be conducted until such time as the notice of termination has been approved for the erosion and sedimentation control general permit. No violations were cited during this inspection. The area of the compressor station was not inspected although the surrounding area appears to be stabilized
2600319 Primary Facility 2017-06-02 Administrative/File Review No Violations Noted And administrative inspection was completed to document the fact that in a previous inspection report, due to a typographical error in department records, it was incorrectly noted the erosion and sedimentation control general permit (ESCGP)h had expired. The ESCGP for this site actually expires on 10/9/2019.
2605085 Primary Facility 2017-06-14 Site Restoration No Violations Noted EC readings (mS/cm) w Oakton PCSTestr 35: separator containment--0.24, production tank containment--0.16, pad--0.33
2650635 Primary Facility 2017-10-23 Routine/Complete Inspection No Violations Noted Well producing.

Cool/windy at time of inspection.

One 2" annulus vent.

2790052 Primary Facility 2018-10-10 Routine/Partial Inspection No Violations Noted ~20' onto the pad from the access gate, gravel has dark staining, and a puddle has a cream color substance floating on it (photo 3). I used a MiniRAE 3000 Photo Ionization Detector (PID) and got readings of 3.0-6.0 ppm (photo 2) from above the stained area, indicating that volatile gas is present. Apparently, there is some residual hydraulic oil on the pad surface, which is a violation of SWMA 301.

I spoke with Ben Younkin & Kris Perritt (both Repsol) by telephone; they explained that a hydraulic oil release (~1 gallon) happened in the area that is stained, which Repsol reported on September 20, 2018. They planned to apply absorbents and cover the area with plastic tomorrow, then excavate to remove the affected pad material in 2 days (Friday October 12, 2018). I used an Oakton PCSTestr 35 to get readings from pooled liquid on site. A puddle on the pad surface near the production tanks returned a 0.35 mS/cm reading. Golder documented the excavation cleanup on Friday October 12, 2018 (email & photos atta

2790566 Primary Facility 2018-10-17 Follow-up Inspection No Violations Noted Repsol excavated to remove some of the pad surface that was stained by a reported hydraulic oil spill. I used a MiniRAE 3000 PID to check for volatile gases above the excavated area; it did not detect any.

I got a 0.13 mS/cm fro a water puddle near the center of the pad using an Oakton PCSTestr 35 today. JLP

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1823432 570100 08/25/2009 10/12/2010 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety siltfence maintenance, Diversion ditch and silt trap improper installation
1823432 570101 08/25/2009 10/12/2010 102.4INADPLN - E&S Plan not adequate Administrative Plan not reflective of site conditions 102.4(b)(5)
2047117 633155 02/23/2012 02/23/2012 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety Hyd oil on ground

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
570100 249919 NOV - Notice of Violation Comply/Closed 10/12/2010
570101 249919 NOV - Notice of Violation Comply/Closed 10/12/2010

For data sources see[6]

References